Loading...
HomeMy WebLinkAbout20170187 Ver 1_Other Agency Correspondence_20170306Wanucha, Dave From: Thomson, Nicole J Sent: Monday, March 06, 2017 9:55 AM To: Wanucha, Dave; David.E.Bailey2@usace.army.mil Subject: RE: Bridge 108 Hand Clearing ? Exactly! And totally w�lcom� — it°s what I do yo! O From: Wanucha, Dave Sent: Friday, March 03, 2017 8:18 AM To: Thomson, Nicole J; David.E.Bailey2@usace.army.mil Subject: RE: Bridge 108 Hand Clearing ? Ok, so no bobcats, backhoes, or other excavator type equipment will be used. As such, major wetland soil disturbances will not occur in these areas that are being hand cleared and therefore no buffer restoration is needed as existing veg and seed will regenerate/germinate. Sounds good. Thanks for the explanation. Dave Wanucha NCDENR Winston Salem Regional Office 450 West Hanes Mill Rd. Suite 300 Winston Sa1em, NC 27105 336-403-5655 Smartphone -------- Original message -------- From: "Thomson, Nicole J" Date:03/02/2017 2:55 PM (GMT-05:00) To: "Wanucha, Dave" , David.E.Bailey�usace.army.mil Subject: RE: Bridge 108 Hand Clearing ? With r�sp�ct to th� hand cl�aring, if you look at th� attach�d utility r�location plan (which should b� in th� original pack�t I s�nt), you vvill s�� that th� ov�rh�ad lin�s ar� g�tting mov�d to th� north sid� of th� bridg�. This is vvhy th� vv�tlands vvill b� hand cl�ar�d. Hand cl�aring m�ans just that — cl�aring by hand (�ith�r chain savvs for larg� v�g�tation, vv��d vvhack�rs for th� low, h�rbac�ous stuff). � From: Nicole Thomson [mailto:nthomsonCa�sepienaineerina.com] Sent: Thursday, March 02, 2017 2:41 PM To: Thomson, Nicole J Subject: Fwd: Bridge 108 Hand Clearing ? Skyr�l 9.`rcrin 1ny Vk�ri�crl� �Uirk Ik,�� �d ��"I,F "1'Gtblkyl -------- Original message -------- From: "Wanucha, Dave" <dave.wanucha(a�ncdenr.gov> Date: 3/2/2017 11:05 AM (GMT-05:00) To: Nicole Thomson <nthomson(a�se�ien in� eerin .� com> Cc: "Bailey, David E SAW" <David.E.Bailey�usace.army.mil> Subject: Bridge 108 Hand Clearing ? Hi Nikki, There is a lot of wetland/buffer hand clearing on this project (.30 acres). Which methods will DOT use to "hand clear"; and, explain how, following project completion, the buffers will be restored to preconstruction contours and revegetated? Thanks. Dave W Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha(c�ncdenr.qov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 a������ �������,��:s���������� �� ����� ������ ��`��,� ����:����,�,� �,� ,�������� �� ��`�� �V����� �°��������� ��.����� ��������,� ��W�r ����:� a���.� �� ���,����,���� �� �������� �s�����,�. I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,