HomeMy WebLinkAbout20111003_DOT letter drainage issues_20160302Transportation
March 2, 2016
Ken Lohr, Chairman
Beaufort Morehead Airport Authority
Post Office Box 875
Beaufort, NC 28516-0875
Subject: R-3307 US 70 Beaufort Bypass Drainage Issues
Dear Mr. Lohr:
PAT McCRORY
Covernor
NICHOLAS J. TENNYSON
Secre[ary
Thank you for your letter dated February 12, 2016 concerning drainage issues adjacent to the
recently graded p�rti�n �f pmject R-3307, the iJS 7Q Reaiaf�rt Rypass which runs adjacent t� the
Beaufort Airport.
As you stated, staff from the NCDOT, primarily from our Hydraulic Unit have been working with
your staff on how to resolve these drainage issues.
As part of the R-3307, US 70 Bypass project we l�ave coordinated with your staff to remove
drainage blockages from the existing ditch that drains at the airport and the US 70 Bypass project.
This work should take place in Apri12016.
Additionally,our Hydraulics Unit has retained a consultant engineering firm to determine the
causes of the drainage issues and offer possible solutions.
We look forward to working with you to resolve these issues. If you have any further questions or
concerns, please do not hesitate to contact us.
Sincerely,
�iC/, ,/�� -
ohn W. Rouse Jr., P.E.
Division Engineer
cc: Tom Steffens, US ACE
Jay Twisdale, P.E.
Ray Livinggood, P.E.
Gary Ward, DWQ
Stephen Lane, CAMA
Brad McMannen, P.E..
Randy Hall, P.E
Jay Johnson
�Nothing Compares�_
State of North Carolina � Deparhnent of Transportation � Highway Division 2
] OS Pactolus Highway NC 33 � Post Office Box 1587 � Greenville, Notth Carolina 27835
252 439 2800 T