Loading...
HomeMy WebLinkAbout20170957 Ver 1_24_Appendix_N_ACP & SHP Tribal Communications_20170227Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket Absentee-Shawnee Tribe of Indians of Oklahoma 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 9/18/2015 12/4/2014 Follow-up telephone phone call (message) from Atlantic and DTI to the Tribe requesting 9/18/2015 comments on the ACP and SHP. 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments for the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Catawba Indian Nation 10/17/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 11/12/2014 Letter from the Tribe to Atlantic requesting a cultural resources survey for the ACP. 9/18/2015 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 6/22/2016 Email from the Tribe to FERC requesting additional information on the ACP and SHP. 9/15/2016 8/8/2016 Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project 8/15/2016 descriptions and maps for the ACP and SHP. 8/25/2016 Letter from the Tribe to Atlantic/DTI in which the Tribe states there are no concerns regarding 9/1/2016 cultural resource sites in the ACP and SHP project areas. The Tribe additionally asked to be notified in the event of an unanticipated find. 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Cherokee Nation 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 12/4/2014 Follow-up telephone call (message) from Atlantic to the Tribe requesting comments on the 9/18/2015 ACP. 12/19/2014 Voicemail message from the Tribe regarding the ACP. 9/18/2015 Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket 12/19/2014 Email from Atlantic to the Tribe transmitting copies of Atlantic's 7/29/14 and 10/17/14 letters 9/18/2015 7/29/2014 requesting comments on the ACP. 9/18/2015 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 12/1/2014 survey report and draft unanticipated discoveries plan for the MNF. 9/18/2015 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 2/11/2015 archaeological survey report for the MNF. (Note: this letter also references an updated 9/18/2015 unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 10/28/2015 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a 10/30/2015 submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 Delaware Nation requests for comments on the ACP and SHP 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 9/18/2014 12/1/2014 Letter from the Tribe to FERC in which the Tribe states that no sites of interest to the Tribe 9/18/2015 will be affected by the ACP. The Tribe additionally asked to be notified in the event of an unanticipated find. 2/11/2015 Letter from the Tribe to DTI in which the Tribe states that no sites of interest to the Tribe will 9/18/2015 be affected by the SHP. The Tribe additionally asked to be notified in the event of an unanticipated find. 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 1/8/2016 Email from the Tribe to Atlantic concurring with the unanticipated discoveries plan for the 1/29/2016 MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Delaware Tribe of Indians 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 9/18/2014 12/4/2014 Follow-up telephone phone call (message) from Atlantic/DTI to the Tribe requesting 9/18/2015 comments on the ACP and SHP. 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 6/21/2016 Email from the Tribe to FERC in which the Tribe states that its land interests in Virginia are in 9/15/2016 Accomack and Northampton Counties and its land interests in West Virginia are in Brooke, Hancock, Marshall, and Ohio Counties. (Note: the ACP and SHP do not cross these Counties.) 8/10/2016 Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project 8/15/2016 descriptions and maps for the ACP and SHP. 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 tl Ba archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Eastern Band of Cherokee Indians 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 _aqlllilo�h 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 11/5/2014 Email from the Tribe to FERC in which the Tribe states that the ACP is outside the aboriginal 9/18/2015 territory of the Cherokee people. 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 9/7/2016 Letter from the Tribe to FERC in which the Tribe states that the ACP and SHP are within the 9/22/2016 aboriginal territory of the Cherokee. The Tribe additionally requested updated project information and copies of archaeological survey reports. Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket 10/5/2016 Letter from Atlantic to the Tribe providing updated information on the ACP and SHP and 10/17/2016 transmitting copies of archaeological survey reports for the projects. 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) ,- 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/5/2016 Letter from Atlantic and DTI to the Tribe transmitting Phase I archaeological survey reports 10/31/2016 and updated, revised route maps and renewing requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Eastern Shawnee Tribe of Oklahoma 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 9/18/2014 12/4/2014 Follow-up telephone phone call (message) from Atlantic/DTI to the Tribe requesting 9/18/2015 comments on the ACP and SHP. 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/15 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/1/2016 Email from the Tribe to FERC requesting a follow-up telephone call. 9/15/2016 8/4/2016 Follow-up telephone call from FERC to the Tribe in which the Tribe requested additional 9/15/2016 information on the ACP. 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated l 1h, unanticipated discoveries plan for the NINE; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Pamunkey Tribe 4/24/2015 Initial letter from Atlantic to the Commonwealth recognized Tribe requesting comments on 9/18/2015 the ACP. 8/5/2015 Initial letter from Atlantic to the federally recognized Tribe requesting comments on the ACP. 9/18/2015 Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Seneca -Cayuga Nation 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 12/4/2014 Follow-up phone call from NRG to the Tribe requesting comments on the SHP. 9/18/2015 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Seneca Nation of Indians 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 12/4/2014 Follow-up phone call from NRG to the Tribe requesting comments on the SHP. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 7/5/2016 Email from the Tribe to FERC expressing interest in the ACP and SHP and requesting an 9/15/2016 archaeological survey in undisturbed areas. 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 1�la, 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. The Shawnee Tribe 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological Tribe Date Summary Filed to the Docket 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. Email from FERC to the Tribe requesting comments on the ACP and SHP. 12/4/2014 Follow-up phone call from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 12/4/2014 Follow-up phone call from DTI to the Tribe requesting comments on the SHP. the ACP and SHP. 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated omitted from this submittal.) unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 omitted from this submittal.) discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 submittal on 8/29/2016.) requests for comments on the ACP and SHP. 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Stockbridge Munsee Community 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 4/2015 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 4/30/2015 Letter from the Tribe to Atlantic deferring consultation on the ACP. 9/18/2015 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 Tonawanda Band of Seneca 10/28/2014 Initial letter from DTI to the Tribe requesting comments on the SHP. 9/18/2015 12/4/2014 Follow-up phone call from DTI to the Tribe requesting comments on the SHP. 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 11 �� 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 6/23/2016 Telephone call from FERC to the Tribe in which the Tribe requested additional information on ' . the ACP and SHP. 8/8/2016 Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project 8/15/2016 descriptions and maps for the ACP and SHP. 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2W"Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. Tuscarora Nation of New York 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 12/4/2014 Follow-up phone call from NRGto the Tribe requesting comments on the ACP. 9/18/2015 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 survey report and draft unanticipated discoveries plan for the MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 6/23/2016 Telephone call from FERC to the Tribe in which the Tribe requested additional information on 9/15/2016 the ACP and SHP. 8/8/2016 Letter from Atlantic and DTI to the Tribe (sent at FERC's request) providing updated project 8/15/2016 descriptions and maps for the ACP and SHP. 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 to discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a , submittal on 8/29/2016.) 10/18/2016 Letter from Atlantic and DTI to the Tribe transmitting updated route maps and renewing 10/31/2016 requests for comments on the ACP and SHP. 12/9/2016 Follow-up phone call (message) from ERM to the Tribe requesting comments on the updated route maps. United Keetoowah Band of Cherokee Indians 7/29/2014 Initial letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/17/2014 Follow-up letter from Atlantic to the Tribe requesting comments on the ACP. 9/18/2015 10/29/2014 Email from the Tribe to Atlantic deferring consultation on the ACP. 9/18/2015 3/25/2015 Consultation letter from FERC to the Tribe requesting comments on the ACP and SHP. 9/18/2015 10/28/2015 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting a draft archaeological 10/30/2015 t survey report and draft unanticipated discoveries plan for the MNF. 6/21/2016 Email from FERC to the Tribe requesting comments on the ACP and SHP. 9/15/2016 8/29/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated draft 9/15/2016 archaeological survey report for the MNF. (Note: this letter also references an updated unanticipated discoveries plan for the MNF; however, a copy of the plan inadvertently was omitted from this submittal.) 10/4/2016 Letter from Atlantic to the Tribe, a MNF Tribal Partner, transmitting an updated unanticipated 10/31/2016 discoveries plan for the MNF. (Note: the updated plan inadvertently was omitted from a submittal on 8/29/2016.) Summary of Communications with Federally Recognized Indian Tribes for the Atlantic Coast Pipeline and Supply Header Project Tribe Date Summary Filed to the Docket a In addition to the communications listed above, Atlantic provided copies of draft survey reports and unanticipated finds plans for the MNF (by letters dated 10/28/2015, 8/29/2016, and 10/4/2016) to the Oneida Indian Nation and Onondaga Nation, both of whom are MNF Tribal Partners.