Loading...
HomeMy WebLinkAbout20140957 Ver 1_15_Appendix_F_Neuse River - Site Specific REV D - No Seal_20170227LEGEND PERMANENT RIGHT-OF-WAY F1L71L�11I7� TEMPORARY RIGHT-OF-WAY PERMANENT IMPACT TOPSOIL SEGRAGATION AREA i EXTRA WORK SPACE ...... • WETLAND — — — STREAM — — LIMITS OF DISTURBANCE CONTOUR SILT FENCE SILT SOCK ROCK CONSTRUCTION ENTRANCE �] TRENCH PLUG - WATER BAR D TEMPORARY SLOPE BREAKER SEDIMENT CURTAIN WATERBODY IMPACT WATERBODY # TEMP. IMPACT PERMANENT IMPACT SJOB105 0.27 ACRES 0.0 ACRES WATERBODY IMPACT 200 150 100 50 0 0+00 2+00 3+00 4+00 5+00 WATERBODY CONSTRUCTION NOTES: 1. CONSTRUCTION TO BE AN OPEN CUT WET CROSSING. 2. LIMIT USE EQUIPMENT OPERATING IN THE WATERBODY TO THAT NEEDED TO CONSTRUCT THE CROSSING. 3. WHILE OPEN CUTTING IN THE WATERWAY, KEEP EXCAVATION AS CLOSE TO THE BOTTOM OF THE WATERBODY AS POSSIBLE. USE A SMOOTH MOTION AND PLACE THE SEDIMENT ON THE BOTTOM OF THE STREAM. AVOID DROPPING THE MATERIAL AS MUCH AS _ POSSIBLE. 4. A SEDIMENT CURTAIN SHALL BE USED IN ' STREAM ON THE DOWNSTREAM SIDE OF THE ( I WORK AREA. 5. STABILIZE WATER WATERBODY BANKS AND INSTALL TEMPORARY SEDIMENT BARRIERS WITHIN 24 -HOURS OF COMPLETING IN -STREAM CONSTRUCTION ACTIVITIES. \ 6. RETURN ALL WATERBODY BANKS TO PRE -CONSTRUCTION CONTOURS OR TO A STABLE ANGLE OF REPOSE AS APPROVED BY \ THE ENVIRONMENTAL INSPECTOR. FILL BELOW \ THE ORDINARY HIGH WATER MARK SHOULD BE \ AVOIDED. \ 7. INSTALL TRENCH PLUGS AND WATERBARS AS \ DIRECTED BY THE APPROVED EROSION AND \ SEDIMENTATION CONTROL PLAN ON BOTH SIDES OF THE WATERWAY, AND AS DEPICTED. ON THIS PLAN. 8. THE TRAVEL LANE SHALL BE CLEARED WITH / SUBSOIL EXCAVATED FROM PIPELINE TRENCH • '-_ . -. ONLY. 9. PIPELINE SHALL BE WEIGHTED WITH PIPESAK OR APPROVED EQUAL IN RIVER CROSSING TO ACHIEVE NEGATIVE BUOYANCY. j 6+00 7+00 STREAM CROSSING PROFILE 50' 0 50' 100' SCALE:1 "=50' STOCKPILE AREA FOR TOP 12" OF STREAM BED MATERIAL 25' PERMANENT RIGHT OF WAY — PROPOSED AP -2 25' PERMANENT RIGHT OF WAY FA 8+00 TRENCH SPOIL BE PLACED IN THIS AREA APPROXIMATE LOCATION / OF SEDIMENT CURTAIN PLAN VIEW 50' 0 50' SCALE:1 "=50' 100' 9+00 STOCKPILE AREA FOR TOP — 12" OF STREAM BED MATERIAL 10+00 11+00 12+00 200 150 100 50 0 13+00 GENERAL NOTES AND COMMENTS: SYM. DATE BY I REVISION INFORMATION PROJECT/TASK APP. SEAL REFERENCE Englneeringand Consulting, LLC INITIATAtlantic Coast Pipeline, LLC_ 3 INTEGRITY IVE INNOVATION ELEVATION DATA FROM THE USGS GIS DATA CLEARING HOUSE. 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: RRC /RLR 7/13/15 PIPELINE SURVEY INFORMATION PROVIDED BY GAI CONSULTANTS. r�r�E: 4/8/16 RLR REVISED RIGHT-OF-WAYS &ROUTING CHECKED: RVS / DLM 7/13/15 AP -2 SITE SPECIFIC PLAN F O R �D STREAM AND WETLAND DATA COLLECTED BY NATIONAL RESOURCE GROUP, LLC. Ac 11/18/15 RRC REVISED PER CLIENT COMMENTS APP. FOR BID: N E U S E RIVER MAPPING DATUM -NC STATE PLANE - NAD 83 B 8/18/15 RRC REVISED PER CLIENT COMMENTS APP. FOR CONST.: DISTRICT: COUNTY: JOHNSTON STATE: NC GROUP DWG. NO. REV. CONTOUR INTERVAL -5 FEET D �A 7/13/15 RRC ISSUED FOR REVIEW SCALE: AS SHOWN D/R/F►LE: DOM/ACP/Site Specific/Neuse River W W O O W W (D C7 0 0 W W EXISTI G GRADE PRO _ 'MIN. AL m I 3 ' MIN. T I - �j 'j 2+00 3+00 4+00 5+00 WATERBODY CONSTRUCTION NOTES: 1. CONSTRUCTION TO BE AN OPEN CUT WET CROSSING. 2. LIMIT USE EQUIPMENT OPERATING IN THE WATERBODY TO THAT NEEDED TO CONSTRUCT THE CROSSING. 3. WHILE OPEN CUTTING IN THE WATERWAY, KEEP EXCAVATION AS CLOSE TO THE BOTTOM OF THE WATERBODY AS POSSIBLE. USE A SMOOTH MOTION AND PLACE THE SEDIMENT ON THE BOTTOM OF THE STREAM. AVOID DROPPING THE MATERIAL AS MUCH AS _ POSSIBLE. 4. A SEDIMENT CURTAIN SHALL BE USED IN ' STREAM ON THE DOWNSTREAM SIDE OF THE ( I WORK AREA. 5. STABILIZE WATER WATERBODY BANKS AND INSTALL TEMPORARY SEDIMENT BARRIERS WITHIN 24 -HOURS OF COMPLETING IN -STREAM CONSTRUCTION ACTIVITIES. \ 6. RETURN ALL WATERBODY BANKS TO PRE -CONSTRUCTION CONTOURS OR TO A STABLE ANGLE OF REPOSE AS APPROVED BY \ THE ENVIRONMENTAL INSPECTOR. FILL BELOW \ THE ORDINARY HIGH WATER MARK SHOULD BE \ AVOIDED. \ 7. INSTALL TRENCH PLUGS AND WATERBARS AS \ DIRECTED BY THE APPROVED EROSION AND \ SEDIMENTATION CONTROL PLAN ON BOTH SIDES OF THE WATERWAY, AND AS DEPICTED. ON THIS PLAN. 8. THE TRAVEL LANE SHALL BE CLEARED WITH / SUBSOIL EXCAVATED FROM PIPELINE TRENCH • '-_ . -. ONLY. 9. PIPELINE SHALL BE WEIGHTED WITH PIPESAK OR APPROVED EQUAL IN RIVER CROSSING TO ACHIEVE NEGATIVE BUOYANCY. j 6+00 7+00 STREAM CROSSING PROFILE 50' 0 50' 100' SCALE:1 "=50' STOCKPILE AREA FOR TOP 12" OF STREAM BED MATERIAL 25' PERMANENT RIGHT OF WAY — PROPOSED AP -2 25' PERMANENT RIGHT OF WAY FA 8+00 TRENCH SPOIL BE PLACED IN THIS AREA APPROXIMATE LOCATION / OF SEDIMENT CURTAIN PLAN VIEW 50' 0 50' SCALE:1 "=50' 100' 9+00 STOCKPILE AREA FOR TOP — 12" OF STREAM BED MATERIAL 10+00 11+00 12+00 200 150 100 50 0 13+00 GENERAL NOTES AND COMMENTS: SYM. DATE BY I REVISION INFORMATION PROJECT/TASK APP. SEAL REFERENCE Englneeringand Consulting, LLC INITIATAtlantic Coast Pipeline, LLC_ 3 INTEGRITY IVE INNOVATION ELEVATION DATA FROM THE USGS GIS DATA CLEARING HOUSE. 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 DRAWN: RRC /RLR 7/13/15 PIPELINE SURVEY INFORMATION PROVIDED BY GAI CONSULTANTS. r�r�E: 4/8/16 RLR REVISED RIGHT-OF-WAYS &ROUTING CHECKED: RVS / DLM 7/13/15 AP -2 SITE SPECIFIC PLAN F O R �D STREAM AND WETLAND DATA COLLECTED BY NATIONAL RESOURCE GROUP, LLC. Ac 11/18/15 RRC REVISED PER CLIENT COMMENTS APP. FOR BID: N E U S E RIVER MAPPING DATUM -NC STATE PLANE - NAD 83 B 8/18/15 RRC REVISED PER CLIENT COMMENTS APP. FOR CONST.: DISTRICT: COUNTY: JOHNSTON STATE: NC GROUP DWG. NO. REV. CONTOUR INTERVAL -5 FEET D �A 7/13/15 RRC ISSUED FOR REVIEW SCALE: AS SHOWN D/R/F►LE: DOM/ACP/Site Specific/Neuse River