HomeMy WebLinkAbout20140957 Ver 1_12_Appendix_E_Figures_2_to_14_Typicals_20170227TEMPORARY PERMANENT
ROW ROW
BOUNDARY BOUNDARY
I
—25'—
I
I
I
I
I
I 3•
I
DITCH
TOPSOIL SPOIL
I •r
PROPOSED
PIPELINE
PERMANENT
ROW
BOUNDARY
I
25'�I
I
ra
I
I
I
I
I
TEMPORARY
ROW
BOUNDARY
it.
Y a 44 �� � Y /+ 4 b,�• +}
:• a �_, ,
�I 50' 0I 50, _ I
10' i i PERMANENT ROW i TEMPORARY CONSTRUCTION ROW
Temporary
Construction ROW I I
I� I
35' -4 75'
SPOIL SIDE i WORKING SIDE
I
I I
I I
I I
110'
CONSTRUCTION ROW
I I
PROFILE
NOTES:
1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 110' WIDE CONSISTING OF 50' OF PERMANENT RIGHT-OF-WAY AND 60' OF TEMPORARY CONSTRUCTION RIGHT-OF-
WAY. ADDITIONAL TEMPORARY WORKSPACE WILL BE NECESSARY AT MAJOR ROAD, RAIL, RIVER CROSSINGS, SIDESLOPES, WHERE FULL RIGHT-OF-WAY TOPSOIL STRIPPING
IS CONDUCTED, AND OTHER SPECIAL CIRCUMSTANCES AS REQUIRED.
For environmental review purposes only.
Akdlk Atlantic Coast Pipeline
Coast AP -2 (36" Outside Diameter)
Typical Construction Right -of -Way
�]n �, Non -Agricultural Areas an EFNA Group mrivany
K:\ CLIENT PROJECTS\D-F\DOM\ACP\TYPICAL CONSTRUCTION\TYP CON NONAG AP 2.VSD, DaL-: 5/23/2007, REVISED: 4/15/2015 DRAWN BY: GIS
re
TEMPORARY PERMANENT PERMANENT TEMPORARY
ROW ROW PROPOSED ROW ROW
BOUNDARY BOUNDARY PIPELINE BOUNDARY BOUNDARY
�f10'—►��-25' 01-4 25' �� 50 ���25'��
I I I I I
I I I I I
I I I I I
I I I I I
TOPSOIL
DITCH
ITOPSOIL SPOIL 12
nAnx � I I
� I
e f i
. r P rf 1rA °�r.�f ° „ ... ? r 'fd t� f s r :f f '
10' I I
PERMANENT ROW I TEMPORARY CONSTRUCTION ROW
Temporary
Construction I I
ROW
la 35'—moi 100'
SPOIL SIDE WORKING SIDE
I � I
1 14
I I
I I
135'
CONSTRUCTION ROW
PROFILE
NOTES:
1. IN AGRICULTURAL AREAS WHERE FULL WIDTH TOPSOIL STRIPPING IS REQUIRED, AN ADDITIONAL 25' OF TEMPORARY WORKSPACE WILL BE REQUIRED. IN
THIS SCENARIO, THE CONSTRUCTION RIGHT-OF-WAY WILL BE 135' WIDE, CONSISTING OF 50' OF PERMANENT RIGHT-OF-WAY AND 85' OF TEMPORARY
CONSTRUCTION RIGHT-OF-WAY. ADDITIONAL TEMPORARY WORKSPACE WILL BE NECESSARY AT MAJOR ROAD, RAIL, RIVER CROSSINGS, SIDESLOPES, AND
OTHER SPECIAL CIRCUMSTANCES AS REQUIRED.
For environmental review purposes only.
AtJardc Atlantic Coast Pipeline
Coat AP -2 (36" Outside Diameter)
Typical Construction Right -of -Way
NpAn �, Agricultural Areas an ERM Group tiny
K:\ CLIENT PROJECTS\D-F\DOMWCP\TYPICAL CONSTRUCTIOMTYP CON AG AP 2.VSD, Dab: 5/23/2OD7, REVISED: 4/152015 DRAWN BY: GIS
PERMANENT
ROW
BOUNDARY
I
I�-25'—
DITCH
TOP- SPOIL
SOIL
PROPOSED
PIPELINE
PERMANENT
ROW
BOUNDARY
I
25'�I
I
I
I
I
\ I
I
TEMPORARY
ROW
BOUNDARY
: _ y r 1+ ''r, } ! -ss'0 s �rF f h p f I
b �4 �Y{' Y /+ 4 b,�• +�4,' �k. 14 LN � �''r • Y. 4 I
+ 4. b.'.. e � .. � 4, "'b•� 4. y'.1 4 k, b I _ y4� �I
50' 25'�I
PERMANENT ROW I TEMPORARY CONSTRUCTION
i ROW
I i I
I � I
25' i 50'
SPOIL SIDE WORKING SIDE
I i I
I I
I I
75'
CONSTRUCTION ROW I
I I
PROFILE
NOTES:
1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 75' WIDE CONSISTING OF 50' OF PERMANENT RIGHT-OF-WAY AND 25' OF TEMPORARY CONSTRUCTION RIGHT-OF-
WAY.
IGHT-OFWAY. ADDITIONAL TEMPORARY WORKSPACE WILL BE NECESSARY AT MAJOR ROAD, RAIL, RIVER CROSSINGS, SIDESLOPES, WHERE FULL RIGHT-OF-WAY TOPSOIL STRIPPING
IS CONDUCTED, AND OTHER SPECIAL CIRCUMSTANCES AS REQUIRED.
For environmental review purposes only.
■
AidAtlantic Coast Pipeline
Coast AP -2 (36" Outside Diameter)
n Typical Construction Right -of -Way in Wetlands
an EF Groupe pmn
K:\_CLIENT_PROJECTS\D-F\DOMWCP\TYPICAL_CONSTRUCTION\TYP_CON_ WETLAND_ AP_ 2_ONLY.VSD, I REVISED: 4/15/2015 DRAWN BY: McGregor
Fiqure D-4
PERMANENT PERMANENT TEMPORARY
ROW PROPOSED ROW ROW
BOUNDARY PIPELINE BOUNDARY BOUNDARY
PROFILE
25' No
TEMPORARY CONSTRUCTION
ROW
NOTES:
1. CONSTRUCTION RIGHT-OF-WAY WILL TYPICALLY BE 75' WIDE CONSISTING OF 50' OF PERMANENT RIGHT-OF-WAY AND 25' OF TEMPORARY CONSTRUCTION RIGHT-OF-
WAY. ADDITIONAL TEMPORARY WORKSPACE WILL BE NECESSARY AT MAJOR ROAD, RAIL, RIVER CROSSINGS, SIDESLOPES, WHERE FULL RIGHT-OF-WAY TOPSOIL STRIPPING
IS CONDUCTED, AND OTHER SPECIAL CIRCUMSTANCES AS REQUIRED.
For environmental review purposes only.
Atlantic Coast Pipeline
Atlantic AP -3 (20" Outside Diameter), and
Coast AP -4 and AP -5 (16" Outside Diameter) 41 Ato
PipeUne Typical Construction Right -of -Way
Non -Agricultural Areas and Wetlands an ERM Group company
K:\_CLIENT_PROJECTS\D-F\DOM\ACP\TYPICAL_ CONSTRUCTIOWTYP_CON _NONAG_AP_3.VSD, I REVISED: 4/15/2015 DRAWN BY: McGregor
PERMANENT PERMANENT
ROW PROPOSED ROW
BOUNDARY PIPELINE BOUNDARY
3'
DITCH
TOP- SPOIL
SOIL 12"
_ Max.
TEMPORARY
ROW
BOUNDARY
►,�25' 25'�
_ TOPSOIL
. '4 ' o . �o�� � •e a.`� �.Y � � • ��� � a9 � • ��a ' �°a � � �., �w�8 � ..v_ � .x . � .o,.' q� .
PERMANENT ROW TEMPORARY CONSTRUCTION ROW
SPOIL SIDE WORKING SIDE
100'
CONSTRUCTION ROW
PROFILE
(VOTES:
1. IN AGRICULTURAL AREAS WHERE FULL WIDTH TOPSOIL STRIPPING IS REQUIRED, AN ADDITIONAL 25' OF TEMPORARY WORKSPACE WILL BE REQUIRED. IN THIS SCENARIO,
THE CONSTRUCTION RIGHT-OF-WAY WILL BE 100' WIDE, CONSISTING OF 50' OF PERMANENT RIGHT-OF-WAY AND 50' OF TEMPORARY CONSTRUCTION RIGHT-OF-WAY.
ADDITIONAL TEMPORARY WORKSPACE WILL BE NECESSARY AT MAJOR ROAD, RAIL, RIVER CROSSINGS, SIDESLOPES, AND OTHER SPECIAL CIRCUMSTANCES AS REQUIRED.
For environmental review purposes only.
Atlantic Coast Pipeline
Atlantic AP -3 (20" Outside Diameter), and
Coast AP -4 and AP -5 (16" Outside Diameter)
Pipeline Typical Construction Right -of -Way
Agricultural Areas an ERM Group company
K:\ CLIENT PROJECTS\D-F\DOM\ACP\TYPICAL CONSTRUCTION\TYP CON AG AP 3.VSD. Date: 5/23/2007. REVISED: 4/15/2015 DRAWN BY: GIS
Figure D-6
100' 100'
50' 50'
25' ADDITIONAL TEMPORARY ADDITIONAL TEMPORARY 25'
WORKSPACE WORKSPACE
o SPOIL SIDE
PIPELINE
u0
a WORKING SIDE
F
WETLAND
I
25' ADDITIONALTEMPORARV rj0' S0' ADDITIONALTEMPORARY ZSR
WORKSPACE WORKSPACE
100' 100'
For environmental review purposes only.
Atlantic Coast Pipeline
AldantiC AP -2 (36" Outside Diameter), AP -3 (20" Outside Diameter), and
Coast AP -4 and AP -5 (16" Outside Diameter)
4peUne : Typical Additional Workspace at
Il Wetland Crossings an ERM Group company
KA CLIENT PROJECTS\D-F\DOMVACP\CROSSINGS\XING WETLAND SMALL.VSD, Date: 10/10/2014, REVISED: 4/15/2015 DRAWN BY: McGregor
Figure D-7
0
so
For environmental review purposes only.
Atlantic Coast Pipeline
►tlantic AP -1 (42" Outside Diameter)
Typical Additional Workspace at Waterbodies Less Than 10 Feet Wide
boast AP -2 (36" Outside Diameter), AP -3 (20" Outside Diameter), and
PipeUne AP -4 and AP -5 (16" Outside Diameter)
I�Typical Additional Workspace at All Waterbodies an ERM Group company
K:\_ CLIENT _PROJECTS\D-F\DOMVACP\CROSSINGS\XING_STREAM_SMALL.VSD, Date: 10/10/2014, REVISED: 4/15/2015 DRAWN BY: McGregor
ure
For environmental review purposes only.
• Atlantic Coast Pipeline
Abandc AP -1 (42" Outside Diameter)
Typical Additional Temporary Workspace at Single -Lane Roads
Coast AP -2 (36" Outside Diameter), AP -3 (20" Outside Diameter), and
gt)eUne AP -4 and AP -5 (16" Outside Diameter)
Y Typical Additional Workspace at all Bored Roads an ERM croup company
K:\_ CLIENT _PROJECTS\D-F\DOMVACP\CROSSINGS\XING_BORED_ROADS_ALL.VSD, Date: 10/10/2014, REVISED: 4/15/2015 DRAWN BY: McGregor
ure
SILT FENCE, DOUBLE
STAKED STRAW BALES,
OR BOTH AS
NECCESSARY WITH
FLOWING WATER
-- - - -- ,----------- - - - - --
.Ili s SPOIL:
°.I
-I
v. :^'.PROPOSED TRENCH
9 I \
PLACE SEDIMENT BARRIERS
ACROSS WORKING SIDE OF ROW TEMPORARY BRIDGE
AT THE END OF EACH DAY (IF NEEDED
_ II
LIMIT OF CONSTRUCTION ROW \
-------------- ---� ------------------------—
ADDITIONAL
— ---------------------—
ADDITIONAL / / ADDITIONAL
TEMPORARY `' - TEMPORARY
WORKSPACE 50, III 50, WORKSPACE
e
■ I I m e :--a Biwa m-
mfm
I
I
1
I I
I
For environmental review purposes only.
Atlantic Coast Pipeline
Atlantic AP -1 (42" Outside Diameter), AP -2 (36" Outside Diameter),
e Cast AP -3 (20" Outside Diameter), and
AP -4 and AP -5 (16" Outside Diameter)
Pipeline Typical Waterbody Crossing
Open Cut Method an ERM Group company
K:\ CLIENT PROJECTS\D-F\DOMVACP\CROSSINGS\XING STREAM OPEN CUT.VSD, Date: 10/10/2014, REVISED: 4/15/2015 DRAWN BY: McGregor
Figure D-10
i
i
i
i
i
WATER BARRIER
MINIMUM
I
LIMIT OF CONSTRUCTION ROW
--------------------------------- ------ �--7--- -------------------------------------i 4i 4ii
—
I M111
10'-0-
f,4, ••1
x PROPOSED TRENCH. o
•l��,��q'•��:�r�: e�. �..�' •.r..�. .'r*r• ��� .tee+..,. rr�.�`e�,4•��rr'�`�+r���e
�9
(IF NEEDED) Y�
'I
0 i
II CULVERT
1
SILT FENCE, DOUBLE
STAKED STRAW BALES, OR
BOTH AS NECESSARY
PLACE SEDIMENT BARRIERS
ACROSS WORKING SIDE OF ROW
AT THE END OF EACH DAY
I LIMIT OF CONSTRUCTION ROW
50' 0.[AIONAL
RARY
SPACE
For environmental review
I Atlantic Coast Pipeline
Atlantic AP -1 (42" Outside Diameter), AP -2 (36" Outside Diameter),
Coast AP -3 (20" Outside Diameter), and
AP -4 and AP -5 16" Outside Diameter)
1peUne l SM Typical Waterbody Crossing
Flume Method an ERM Group company
' K:\_CLIENT_PROJECTS\D-F\DOM\ICP\CROSSINGSUONG_STREAM _FLUME.VSD, Date: 10/10/2014, REVISED: 4/15/2015 DRAWN BY: McGregor
Figure D-11
Figure D-12
BALES LINED WITH
IMPERMEABLE LINER
LIMIT OF CONSTRUCTION ROW
I
I
PUMP(S) O
SILT FENCE, DOUBLE STAKED
I
I I
STRAW BALES, OR BOTH
I
IF NECESSARY
I
STANDBY
UPSTREAM
PUMP(S)
DAM
l
J
V.
SPOIL P :.
t O
a SPOIL: '.
SP' l
' *F' '�}
r'}• a+4. a
,'
•x' �* •-••4f + 'Yx.l -
i
}'Q
'xpe•
k
,4 1
' V _
i Y L• i +" 4 e i +" _ + i +_ i n
J' e Je r r ,
f ' r .PROPOSED TRENCH',- -
i}a i,Me i4= i�.
�4:
t4.• iyil i4+': i�:•
+y. i4+
- -.},
P :.a. r:a. P r .x• r- ! .. s
-i4+
_ -
- - -
:. f- P :ar I -r i e a R m _ r
a'
- A
.a �a
PLACE SEDIMENT BARRIERS
�--,
I
TEMPORARY BRIDGE
(IF NEEDED)
I ACROSS WORKING SIDE OF ROW
I
I
AT THE END OF EACH DAY.
I
I
DOWNSTREAM DAM
\l
ENERGY DISSIPATOR
�\
LIMIT OF CONSTRUCTION ROW
ADDITIONAL
/ADDITIONAL
TEMPORARY
50' '� I �,
50' �� TEMPORARY
WORKSPACE
WORKSPACE
�O
For environmental review purposes only.
Adardc
Atlantic Coast Pipeline
coak
Typical Waterbody Crossing
Pm
IpAne
Dam and Pump Method 1w
an EFUA Group mrrWWV
K:\_CLIENT_ PROJECTS\D-F\DOM\ACP\CROSSINGSWNG_STFEAM_ DAM_AND_PUMP.VSD, Dai: 10/10/2014, REVISED: 4/15/2015
DRAWN BY: McGregor
Figure D-12
For environmental review purposes only.
Atlantic Coast Pipeline
Atlantic AP -1 (42" Outside Diameter), AP -2 (36" Outside Diameter),
Ja ' AP -3 (20" Outside Diameter), and
Pi e a ,M AP -4 and AP -5 (16" Outside Diameter)
p Typical Waterbody Crossing
Directional Drill Method an ERM Group company
K:\ CLIENT PROJECTS\D-F\DOMWCP\CROSSINGS\XING_STREAM HDD.VSD, Date: 10/10/2014, REVISED: 4/15/2015 DRAWN BY: McGregor
Figure D-13
Figure D-14
WETLAND BOUNDARY
I ,\
I ,A
I \\
1 t�J1i v
LIMIT OF CONSTRUCTION
ROW
1 \\
11 '� SILT FENCE, DOUBLE STAKED
11 �STRAW BALES, OR BOTH AS
I I NECESSARY
C�
�^ I TOPSOIL STRIPPED FROM TRENCH IN UNSATURATED SOILS '` \
I; \
`�
_ — _ — _ — _ _
__ _ _ _ ___ _ _ _ _ _ _ _ 1
- T\\
lrb
�:
_ --------
I \
$POI 1
- i, - - :'x: .b: :x: .t. :'+°: .t• •;.r°: - :..: :�: - .+: - t• je - •„ - - :'x: .'r: :xa`✓.tx
i..'
TRENCH:
�. .PROPOSED
27
PLACE SEDIMENT BARRIERS ACROSS
— — — —
WORKING SIDE OF ROW AT THE
END OF EACH DAY.
—
------ .4.,'
/-1------------------------------------ --------TII —�.
-------
�W:
' CONSTRUCTION MATS IF
NECESSARY �` 1
ADDITIONAL i'
' LIMIT OF CONSTRUCTION '�� \\�
ROW \-501
ADDITIONAL
TEMPORARY SO'
WORKSPACE ;�; I 1
\
'�A
IN'. TEMPORARY
;�'. WORKSPACE
4I/
6 �i r
r
NOTE: SEDIMENT BARRIERS MAY ALSO BE INSTALLED AT THE EDGE OF THE CONSTRUCTION ROW AS NECESSARY TO CONTROL I�
I
SEDIMENT WITHIN WORK AREAS.
For environmental review purposes only.
Atlantic Coast Pipeline
Atlantic
Coast
AP -1 (42" Outside Diameter), AP -2 (36" Outside Diameter),
AP -3 (20" Outside Diameter), and AP -4 and AP -5 (16" Outside Diameter)
FSIveline sM
Typical Wetland Crossing
r
Open Cut Method
an ERM Group company
K:\_CLIENT_PROJECTS\D-F\DOMWCP\CROSSINGSVONG_WETLAND OPEN_CUT.VSD, Date: 10/10/2014, REVISED: 4/15/2015
DRAWN BY: McGregor
Figure D-14