Loading...
HomeMy WebLinkAbout20071526 Ver 1_Certification of Completion_20080707o9; Rffig JUL 7 2888 Certification of Completlon DENR • WATERQUAUTY WETLAWS AN() STORMWATER BRANCH DWQ Project No.: C S 2 G County: r R Applicant. n Jr-e.w & er be- Project Name: _Let 1Ce rams s _03n &3o, a 3'3 Date of Issuance of Certification or Authorization ID- - Z oa Certe of Comuletion Upon completion of all work approved within the 401 Water Quality CertiScation and Buffer Rules, and any subsequent modifications, the applicant is required to return, this c ert fiicate to the 401 Oversight/Express Permitting Unit, North Carolina Division of Waxer Quality, 1654 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send vertifi'icates from all of these. Applicant's CerlI dj7ica&n I, W lT<(-? hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and into t of the 401 Water Quality Cerdfleation and-Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's CaW acadon Date: 7 2-- "0 ? I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within sn *wAial compliance and intent of the 401 Warr Qdallty Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by•a Certa; jred Professional Date: )i as a duly registered Professional (i.e., Engineer; Landscape Architect, Surveyor; etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality CertiScation and Buffer Rules„ the approved plans and specifications, and other supporting materials. Signature: Registration No. Date