HomeMy WebLinkAbout20070931 Ver 1_Certification of Completion_20080708Sent Certified Mail Return Receipt Requested
¦O¦
¦¦¦
°' Hanson
HEIDELBERGCEM ENTGroup
July 3, 2008 Hanson Aggregates Mideast
Y Southeast Area
North Carolina Territory Office
2300 Gateway Centre Boulevard
Morrisville, NC 27560-9626
Tel 919 380 2610
Fax 919 380 2616
www.hanson.com
Ms. Lauren Cobb
North Carolina Department of Environment and Natural Resources
Division of Water Quality
2321 Crabtree Boulevard, Suite 250
Raleigh, NC 27604
Re: Hanson Raleigh Quarry, DWQ Project#07-0931, Certificate of Completion
Dear Ms. Cobb:
The sediment and erosion control basin construction project is completed. The structure has been
inspected by the design engineer and the accompanying Certificate of Completion is being
forwarded for your reference.
Please contact me should you require additional information.
Since ely,
RobertSnyder
Environmental Manager
Encl:
cc: Toby Lee, Hanson Raleigh Quarry
?P=??Lfflwlgp
JUL S 2008
DENR - WATER QUAUTY
WETLANDS AND STORMWATER BRANCH
Certification of Completion
DWQ Project No.: Zpa7a 931 County: whrtr
Applicant:
Project Name:
Date of Issuance of Certification or Authorization
v
diaavsr I. ;??7
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
I,
used in the observation of the
compliance and intent of the 401
and other supporting materials.
Signature:
Agent's Certification
Date:
I, , hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified Professional
I, AL' .&J 1Z. ,G1 ?VG? P , as a duly registered Professional ?N4111/ fiQ?i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: J,&4t/-k? At Registration No. 22 ¢ Date 7 o?,/v b
C=?dGp
JUL 8 -2008
, hereby state that, to the best of my abilities, due care and diligence was
construction such that the construction was observed to be built within substantial
Water Quality Certification and Buffer Rules, the approved plans and specifications,
DENR - WATER QUAUTY
WETLANDS AND STQRMWATER BRANCH