Loading...
HomeMy WebLinkAbout20140764 Ver 1_redline revision 02_23_17_20170223�� % �� ��� NO WETLAND OR SURFACE WATER IMPACTS 30 0 15 30 SCALE: I"= 30' HORIZ. ENLARGED PLAN VIEW S ITE 1 'DESIGN EXCEPTION: MIN. HORIZONTAL CURVE ftADIUS I10RIZONTAI SSD SUPERELEVATION DETAIL A TOE PNOTECTION �No�ro s�ole) oa �ia u D 'L'��((Ep sLovE ceo d F �Ear�� d= t Ft. Type ofLiner= CLASS B RIP RAP —L— S7A. 12+70 TO 1J+48 LT —L— STA.16+70 TO 18+75 RT TO FERGC750I1 NO WETLAND OR SURFACE WATER IMPACTS �,�°�� _\��� / � �,7 V . ' � � (�� � �PO �y �'� �� hL'�� � � o ���� / _ � � � O� � �� �� � O Q�" � � Q� 4J �� O / W � VI ARCHIE R& NORA LOU S PRICE Y y� �� 4 � Q NORARLOU 5 RICE •�nJ�-�,J�� � / I��` y1 07 � �\�'( (�/ � j� �.� .* '���0��� —_ ' //�� �;a, z a �� f � ,{ � �� l� /i �<? 1/�� f� `g�. I / .' ',`/ C1A55 B &If—RkY � ; � �,� E5T.2 L6N5 �i � EST.7,SY FF SEE ENLARG�D Af�l ON NEXT SHEET I�� � 50 100 SCALE: I"= 100' HORIZ. i ,_ _���� RETAIN���, /� - ---------�_- ROGER N COBB i , �'�%/ � �'� � V� � O o����. BARRY W LOWE �� '� ; i /�� ��_____ __ , � � � ;" � i � �� I � . 58�— ` BZ I � ` MdUUS-_", \` � ��--'�—=.—��"�a ' ���`� ��`__ ` �• := '_"" __'_____--- �� � ____'_' __' \ `' 3 . � — .—_ ��BZ � � � CLASS II RIP RAP UP az s TO SHOULOFR ELEV.(TYP.)-- (STRUCTURE PAY ITEM) BMI ELEY = 585.58 / ROGER N COBB /TOTAL PROJECT LENGTH: 850 FEET PROPOSED BRIDGE: SINGLE SPAN 33" BOX BEAM, 1@ 90' EXISTING BRIDGE: SINGLE SPAN BRIDGE: 1@ 40'-8" z�o• i� ,(� PROIECT REFERENCE SHEET NO. �� A 1� �� B0.0ADN IN RSIG�ORD k229 ENGINEERS V1FiG1NM--�OBB LIFE ESTATE aW= 10 11 12 13 14 15 16 17 18 �g� PLAN VIEW SITE 1 INCOMPLE E PLANS m xvr o� ron �v ecnutsiT[ov PRELIMIN Y PLANS DO NOi U� CONbTRIIC1ION AIOTf IMCOONALO 16 F, LLC I IICENSE t10. F-L669 a^��e °f ,� HdYCII MOYY Po eo. roo �` MacDonald ` ��:. n"��'�" u. '� s�n���Faomiv,y, 5�i�e 1�� Rzleigh, �(:? 160] Engineering L N. Q DBPT.OF TRANSPORTATiON DIVffiION OF ffi(3SRAY8 �� W� PROJBCP� nD�b107AC BRID(iS NQ. t!9 OVSR NORTS PRONQ STIIJ�JQ QIISR�TSR � ON SR if18 t�A'Y'PBRLY ROAD) �� �� PERMIT DRAWING SHEET _ OF _ �J�}� BRIDGE HYDRAULIC DATA �sicN astiwaRCE - �oo cFs DES/GN FREfX/ENGY � 25 YRS DES/GN NW ELEVATlON � 588.4 FT BASE DISCHARGE � 5,39�0 CFS BASE FREQUENGY � lOD YRS BASE HW ELEVATlON — 59/y8D Fr OVE14rOPPlNG DVSCHARGE � 9600 CFS OVEHT'OPPlNG FREQi/ENGY � IOP- YRS OVERTOPPING ELEVi4TlON � 590.6 PT DATE OF SURVEY � ll 22-13 WS. ELEVATION AT DATE OF SURVEY � 580.6 Ff'