HomeMy WebLinkAboutBrunswick 23 FSM NotesCarpenter,Kristi
From:
Sent:
To:
Subject:
Attachments:
AI I,
Marks, Caitlin M
Friday, February 24, 2017 1:58 PM
Tim jordan@mottmac.com; Richard (Rick) A. Moore; Lane, Stephen; Wilson, Travis W.; Vause, Robert
A; Bowen, Kevin G; Leonard, David; Michael Wood; Argenbright, Dean N;
brad.e.shaver@usace.army.mil; Newton, P. Korey; Neal,lohn R; Vancleef, Ronald T; davis, john s;
Dickey, Gregory W; Edgerton, Alton R; Herndon, T. Mason; gary�jordan@fws.gov; Moore,lonathan L;
Sawyer, C J; Sleeper, Lonny A; Westphal, Anneliese; Steenhuis, Joanne; Bodnar, Gregg; Mccombs, Iris
H; Knight, Justin M; Perry, Daniel L; kespinoza@mckimcreed.com; Lewis, Christopher R
Brunswick 23 FSM Notes
17BP.3.R.62 Brunswick 23 - updated 2017.02.24.pdf; Travis Wilson - NC Wildlife Resources
Commission Comments (17BP bridges).pdf; Mod Method III.pdf
Please find the Field Scoping Minutes for Brunswick 23, attached. PLEASE NOTE: this bridge has changed from a cored
slab bridge (as discussed in the field) to a girder bridge due to future widening, and the route has changed from a
secondary route to a primary route.
Please review for correctness and reply letting me know your section is "correct" -- or of course if something needs
corrected.
I have also attached a plan sheet for Clearing Modified Method III and a letter from WRC.
Thank you,
Caitlin
Caitlin M. Marks, EIT
NCDOT Division 3 Consultant
Assistant Resident Engineer
910-341-2000
cmmarks@ncdot.gov
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.