Loading...
HomeMy WebLinkAboutBrunswick 23 FSM NotesCarpenter,Kristi From: Sent: To: Subject: Attachments: AI I, Marks, Caitlin M Friday, February 24, 2017 1:58 PM Tim jordan@mottmac.com; Richard (Rick) A. Moore; Lane, Stephen; Wilson, Travis W.; Vause, Robert A; Bowen, Kevin G; Leonard, David; Michael Wood; Argenbright, Dean N; brad.e.shaver@usace.army.mil; Newton, P. Korey; Neal,lohn R; Vancleef, Ronald T; davis, john s; Dickey, Gregory W; Edgerton, Alton R; Herndon, T. Mason; gary�jordan@fws.gov; Moore,lonathan L; Sawyer, C J; Sleeper, Lonny A; Westphal, Anneliese; Steenhuis, Joanne; Bodnar, Gregg; Mccombs, Iris H; Knight, Justin M; Perry, Daniel L; kespinoza@mckimcreed.com; Lewis, Christopher R Brunswick 23 FSM Notes 17BP.3.R.62 Brunswick 23 - updated 2017.02.24.pdf; Travis Wilson - NC Wildlife Resources Commission Comments (17BP bridges).pdf; Mod Method III.pdf Please find the Field Scoping Minutes for Brunswick 23, attached. PLEASE NOTE: this bridge has changed from a cored slab bridge (as discussed in the field) to a girder bridge due to future widening, and the route has changed from a secondary route to a primary route. Please review for correctness and reply letting me know your section is "correct" -- or of course if something needs corrected. I have also attached a plan sheet for Clearing Modified Method III and a letter from WRC. Thank you, Caitlin Caitlin M. Marks, EIT NCDOT Division 3 Consultant Assistant Resident Engineer 910-341-2000 cmmarks@ncdot.gov Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.