HomeMy WebLinkAbout20170227 Ver 1_impact summary sheet_20170220WETLAND PERMIT IMPACT SUMMARY
Hand Existing Etiisting
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Stmcture Fillln Fillln in Clearing in SW SW Impacts Impacts Stream
No. (FroMio) Size/Type Wetlands Wetlands Wetlands inWetlands Wetlands impacts impacts Permanent Temp. Design
ac ac ac ac ac ac ac) ft ft ft
1 11+66/13+20 -L- LT. 1@35', 1�a 45' 21" CS w/ 2'-6" Ca s 0.02 0.01
2 14+20/15+24 -L- �T. 1@35', 1@45' 21" CS w/ 2'-6" Ca s 0.�1 0.02 0.01 <0.01
TOTALS': 0.01 0.04 0.02 <0.01 0 0 0
'Rounded totals are sum of actual impacts
NOTES: