Loading...
HomeMy WebLinkAbout20170934_B-5691 Bridge Replacement - COE Action ID SAW-2016-00756_20170223Carpenter,Kristi From: Rerko, James J Sent: Thursday, February 23, 2017 9:31 AM To: Hair, Sarah E SAW (Sarah.E.Hair@usace.army.mil); Steenhuis, Joanne Subject: B-5691 Bridge Replacement - COE Action ID SAW-2016-00756 Liz / Joanne B-5691 is the replacement of Bridge 052 which is along SR 1006 (Maxwell Road) over South River in Cumberland County. We had scoped the bridge last year and it is scheduled to be let in conjunction with B-4950 which was just permitted by you. The problem is that bridge 052 is closed right now due to damage from the hurricane and it was to serve as the detour for B-4950. The projects need to be completed in conjunction with each other so that the detours can be accomplished. An Emergency Design Build Contract is being developed and advertised quickly to combine the two projects. The Design-Build Group in Raleigh is requesting that demolition begin as quickly as possible ahead of the permitting, which has been the request for all other hurricane related project. No other construction is requested until the permits are received. Liz, you provided a Preliminary JD SAW-2016-00756 on 05/04/16. James J. Rerko, PWS Division 6 Environmental Officer North Carolina Department of Transportation 910 437 0207 office 910 486 1959 fax lirerko(a�ncdot.qov Email 1000 Transportation Drive Fayetteville, NC 28302 �'��� � �i :� �-�� �_ � �; � . :.�- � '� .� +'�;.� Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.