Loading...
HomeMy WebLinkAbout20170219 Ver 1_Stormwater Info_20170221k 11�;11��'<14' North Carolina Department of Transportation �� SL[�rtl]�YdtPf Highway Stormwater Program ���` STORMWATER MANAGEMENT PLAN ��--• (Version 2.01; Released December 2014) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.87 TIP No.: 176P.7.R.87 (400431) County(ies): Guilford Page 1 of 1 General Project Information WBS Element: 17BP.7.R.87 TIP Number: 17BP.7.R.87 400431 Project Type: Bridge Replacement Date: 10/20/2016 NCDOT Contact: Galen Cail, PE Contractor I Designer: Dan Duffield, P.E. Address: NCDOT Hydraulics Unit Address: Summit Design and Engineering Services 1100 Birch Ridge Drive 100 East Six Forks Road, Suite 300 Ralei h, NC 27610 Ralei h, NC 27609 Phone: 919 707-6711 Phone: 919 322-0115 Email: cail ncdot. ov Email: dan.duffield summitde.net Cit ITown: Osceola Count ies): Guilford River Basin s: Ca e Fear CAMA County? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th iin. miles or feet : 275 lin. Feet Surrounding Land Use: Agriculture, Forest Proposed Pro'ect Existin Site Pro'ect Buiit-Upon Area ac. 0.18 ac. 0.13 ac. Typical Cross Section Description: 2 lane road with 10' travel lanes, and 6' shoulder including 4' paved shoulder. There will 2 lane road with 10' travel lanes and no paved shoulder. be guardrail installed along the road, overtop of the culvert, for added safety and to reduce natural system impacts. Annual Avg Daily Traffic (veh/hr/day): Design/Future: Year: Existin : 820 Year: General Project Narrative: The project consists of replacing Bridge 400431 on SR 2719 (High Rock Rd) over UT to Reedy Fork. The existing structure consist of precast prestressed concrete channels (Description of Minimization of Water with a sufficiency rating of 28.62 The proposed structure is a double 11' X 10' cast-in-place reinforced concrete box culvert. The culvert has been sized as to have one barrel Quality Impacts) match the existing channel to the greatest extent possible and is burried 1.0' below the existing bed and back filled with native stream material. The other barrel will have a sill and will only allow for high flow. A base ditch will be constructed in the southwest quadrant of the project which runs along SR 2719 and has been widened from a V ditch to a base ditch because there is an existing grade change in the existing ditch and thus transfers to the proposed ditch in between stations 11+75-L- RT and station 12+00 -L- RT. The slope of the proposed ditch changes at station 12+75 -L- RT from a slope of 5.8% to slope of 11.7% which is near the culvert inlet and stream and riprap lined. This ditch follows the lay of the land and the Q2 velocities are 4.2 ft/sec for the grass lined section and 4.0 ft/sec for the riprap lined section. A riprap energy dissapotor has been added at the outlet of the ditch. The other three quadrants do not have proposed ditches. Waterbody Information Surface Water Body (1): UT to Reedy Fork NCDWR Stream Index No.: 16-11-(9) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply V(WS-V) Supplemental Classification: Nutrient Sensitive Waters (NSW) Other Stream Classification: Impairments: ThreatenedlEndangered Species? Comments: NRTR Stream ID: Buffer Rules in Effect: Jordan Lake Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative)