Loading...
HomeMy WebLinkAbout20150932 Ver 1_Certification of Completion_20170221RUNEITR North Carolina Department of Environment and Natural Resoul Pat McCrory Governor DWR Project No DWR EXP. # 15-0932 County: Greene Donald R, van der Vaart Secretary Applicant: Federal Government, US Army Corps of Engineers, Wilmington District Project Name: Town of Hookerton WWTP Stabilization, Neuse River Basin, Contentnea 401 Water Quality Certification Issued Date: September 29, 2015 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the DWR 401 & Buffer Permitting Unit, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I)ennifer L. Owens (Chief, CESAW-ECP-PE)hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans a d specifications, a other supporting materials. Signature: Date: I G t—t az 17 Agent's Certification 1 Robert E. Taylor (Mayor, Hookerton, Nt:) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: g l j= Date: _ 0 Z - 15 If this project was designed by a Certified Professional 1, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Division of Water Resources — 401 & Buffer permitting Unit 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N Salisbury St, Raleigh, North Carolina 27604 Phone: 919807-63001 FAX: 919-807.6492 Internet mm.navaterqualihi.org An Equal Opponun41 Allirmalive Action Employer - Made in part by recycled paper