HomeMy WebLinkAbout20160052 All Versions_DCM Permit_20160223Permit Class
MODIFICATION/MINOR
EMERGENCY
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
�errr�it
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
7-16
Issued to N.C. Department of Transportation, P.O. Box 1587, Greenville, NC 27835
Authorizing development in Carteret County at roadside canals, US 70 between North River
Corner and Stacy , as requested in the permittee's application dated 2/16/16, including the
attached worknlan drawine (1) dated 2/12/16.
This permit, issued on 2l23/16 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1)
2)
Road Shoulder Reconstruction
Unless specifically altered herein, this Minor Modification authorizes 6401ineaz feet of additional
road shoulder reconstruction, and an expansion of the authorized project area, as depicted on the
attached workplan drawing.
The placement of riprap shall be limited to the areas as depicted on the attached workplan drawing.
The riprap material shall be clean and free from loose dirt or any pollutant, except in trace quantities.
3) The riprap shall not extend waterward more than 5 feet from the normal water level at any point
along its alignment at the time of construction, and the riprap shall not extend waterward more than
an average distance of 3 feet from the normal water level along its full alignment at the time of
construction.
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or Signed by the authority of the Secretaty of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Deparhnent
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2019
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
`�'"�.G- dH'"�� _ �
Braxton C. Davis, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
N.C. Department of Transportation Permit #7-16
Page 2 of 2
ADDITIONAL CONDITIONS
4) The filter fabric associated with the riprap/backfill shall be in place prior to the placement of any
backfill.
5) All fill material shall be obtained from a high ground source. No unconfined fill material shall be
discharged into estuazine or public trust waters.
6) No fill material shall be placed at any time in wetlands or waters of the State outside of the alignment of
the fill areas as indicated on the attached warkplan drawing, without permit modification.
7) No temporary impacts to wetlands or waters of the State are authorized, without additional authorization
from the N.C. Division of Coastal Management (DCM).
General
NOTE: The activity authorized by this Minor Modification will permanently impact approximately 405
square feet of Coastal Wetlands due to fill and approximately 1,920 square feet of surface waters
due to fill.
NOTE: In order to prevent similar road shoulder erosion events from threatening the safety of US 70
within the project area in the future, the permittee is strongly encouraged to expedite efforts to
develop and implement a proactive long-term solution that addresses transportation safety within
the project area. DCM will offer any assistance possible to help achieve this long-terrrt solution.
8) If it is determined that additional impacts aze necessazy that are not shown on the attached workplan
drawing or described in the authorization request, a permit modification and/or additional authorization
from DCM may be required. In addition, any changes in the approved plan may also require a permit
modification and/or additional authorization from DCM. The permittee shall contact a representative of
DCM prior to commencement of any such activity for this determination and any permit modification.
9) The permittee and/or his contractor shall contact the DCM Transportation Project Coordinator in
Morehead City at (252) 208-2808 to request a preconstruction conference.
10) This Minor Modification does not eliminate the need to obtain any additional permits, approvals or
authorizations that may be required.
11) The permittee shall coordinate with the U.S. Army Corps of Engineers (USACE) and the N.C. Division
of Water Resources (DWR) regarding the project. The permittee shall provide any permits issued by
USACE and DWR to DCM prior to initiating conshuction activities.
12) This Minor Modification shall be attached to the original of Permit No. 7-16, which was issued on
1/12/16, and copies of both documents shall be readily available on site when a Division representative
inspects the project for compliance.
13) All conditions and stipulations of the active permit remain in force under this Minor Modification unless
altered herein.
NOTE: An application processing fee of $100 was received by DCM for this project.