Loading...
HomeMy WebLinkAbout20150998 Ver 1_Meeting Notes 02-14-17_20170214AGENDA February 14, 2017 1. Safety U. Introductions Ui Overview ofObjectives IV. Sutton Closure Permitting (1O45am—Il:8Oam) a. Sutton NPDE5Permit Overview b. Ash Pond Closure Project Impacts c. Path forward V. 402/404Regulatory Overlap Discussion (12/OOpnn-2:3Opm) a. Past interpretations of4O4/4U2overlap, engineered features b. Seep permitting assornption«/cur/en1path c. Seep examples and discussion d. Mitigating actions LEGEND OUTLINE _ APPROXIMATE M 1984 ASH / �\ APPROXIMATE COOLING POND/CANAL OUTLINE OUTLINE OF 1971 ASH BASIN BASIN —. % �\ — _ r � 1971 ASH _ — HA -1'1 y / BASIN / \ APPROXIMATE LOLA AND ASH BASIN OUTLINE — — — NO CCR _' NEWHA-004-B-1 � _ EL 26.7' APPROXIMATE PROPERTY BOUNDARY HA -1-2 :___ NO CCR \ — NO CCR — — — — — — — — — — — — DIRT/UNPAVED ACCESS ROAD — — — - – — — — — — — — — — — — — — — NEWHA-004-PZ-107 r 7 EL 27.0' _ \ EXISTING MAJOR CONTOUR ELEVATION :.L NO CCR / — X— X— X— X— X— X— X— X— X— X— FENCE 1 APPROXIMATE OUTLINE N NEWHk-00-�-6-2 OF 1984 ASH BASIN MISCELLANEOUS STRUCTURE l CONCRETE ,1 EL 26.2' PAVED ACCESS ROAD NEWHA-004-PZ-106 HA -2-1 THB-3 EL 27.3' RAIL ROAD NO CCR 0-5 FT BGS EL 17.5'-2.5' —----=='----- --- AREA REPRESENTING BATHYMETRY SURVEY (NOTE 2) 10p \� EL 27.5' NEWHA-004-B- - OUTFALL 00822x00 _- \\ EL `8'-3' EL 27.6' DELINEATED WETLAND (NOTE 11) (APPROXIMATE) EL 18-4 1 ? t7*00 • \\ ` HA -3-1 1 - - X SG -4+ STAFF GAUGE (NOTE 10) — — — HA -2-2 79x 0-5.5 FT BGS i r — — — — NO CCR Op x NEWHA-004-B-1 NEWHA-004-PZ-105 \ HA -3-2 CANAL WETLAND — — — — — — THB-4 v 76x00 s 0-1.5 FT BGS (NOTE 11) I EL 26 T x EL 27 7' x SOIL BORING \s., NO CCR EL 19'-6' BORING ID z — — — — — 0-7 FT BGS --,; *00\ NEWHA-004-PZ-1 Li;, SPT -1 ELEVATION OF MUDLINE/GROUND SURFACE THB-2 - _ \ ESTIMATED VERTICAL EXTENT OF CCR IN ELEVATION 1 — — — — — — 0-9.5 FT BGS / 0 EL 27.T EL 27 5' X N — — — — — — —�- r, 1EL 18 _ 7 \ o— — — — — _ — — THB-1 0*00 \ HAND AUGER BORING (NOTE 8)' 0-9 FT BGS 8x HA -1-1 THB-1 BORING ID — — — — — — — — — ---- --- -- -- - 0 X X ESTIMATED VERTICAL EXTENT OF CCR IN DEPTH BELOW 61 j — — — — — — — — — - 0 NO CCR 0-9 FT BGS GROUND SURFACE (NOTES 8 AND 9) _ _ _ _ _ _ _ _ _ PROPOSED SHEET z / 0 PILE ALIGNMENT - '-' 4*pp •'� --------2x 0 —_- COOLI G POND —_ —__-- __ ___ _ _ z _(8.5 FT WATER ELEVATION OBTAINED— _ 0x a _ FROM STAFF GAUGE SG -3, _ LAY OF LAND ~� 00 l NOTES. DATED 8 MARCH 2016) — \� w — - — --- --- --- (LOLA) ..._ __�`•-.� \� \ 1- TOPOGRAPHIC FEATURES WERE OBTAINED FROM FILE "SUTTON-TOP020-DWG" PROVIDED BY DUKE ENERGY ON APRIL 23, 2014. — — — — — — — — _ _ _ _. _ X .�•'•., \+ 2. BATHYMETRIC SURVEY FOR THE DISCHARGE CANAL AND COOLING POND TO THE WEST OF BASINS WAS PROVIDED BY WSP, TITLED _ _ _ "GEOTECHNICAL / ENVIRONMENTAL INVESTIGATION LOCATIONS & BATHYMETRIC SURVEY", FILE NAME SUTTON WELL BASE DWG. DATED v — — — — X— X— x— x � DISCHARGE CANAL , + JUNE 12, 2014, BATHYMETRIC SURVEY FOR THE COOLING POND TO THE WEST OF LOLA WAS CONDUCTED ON MARCH 22, 2016 AND -- --- --- / _ _- PROVIDED BY WEIR TITLED "BATHYMETRIC SURVEY L -V. SUTTON ENERGY COMPLEX PORTION OF COOLING POND AND CANAL", FILE NAME � — — — — (8.5 FT WATER ELEVATION % — — — — -__. __ __. ._ `- SUTTON SE COOLING POND DWG w _ _ _ _ _ OBTAINED FROM STAFF -- z• �\ Of — — — — — — — GAUGE SG -4, DATED 8 MARCH 2016) 3. COORDINATES AND DIRECTIONS SHOWN ON THIS DRAWING ARE BASED ON NORTH CAROLINA STATE PLANE COORDINATE SYSTEM ___ \ NCGRID/NAD83(2011)- — --- — — — — __ _ ._ _ _ __ - _ _ IR '..� ••-� ,� 4. ELEVATIONS ON THIS FIGURE ARE REFERENCED TO NAVD88 VERTICAL DATUM. II -- 5. APPROXIMATE PROPERTY LINE BOUNDARY AND COOLING POND OUTLINE WERE OBTAINED FROM THE NORTH CAROLINA NEW HANOVER TE HTTP-/lWVNN NHCGOV COM/GIS DATA AVAILAB FDR DOWNLOAD PARCEL SHAPE FILE DATA AND MISCELLANEOUS w F PROPERTY LINES RESPECTIVELY, LAST UPDATE ON AUGUST 10, 2005.LE , '\ � COUNTY GIS WEBSITE / APPROXIMATE OUTLINE Ln O COOLING BASIN (NOTE 5) _ — — _ _ -_: _ I I 1 6. ONLY THE INVESTIGATION LOCATIONS ALONG THE 1971 BASIN SOUTHERN DIKE AND DIKE TOE ARE SHOWN. �— — x } 7. THE ESTIMATED VERTICAL BOUNDARIES OF CCR PRESENTED HEREIN ARE BASED ON THE FINDINGS FROM FIELD INVESTIGATIONS AND/OR %TlllTlfjff�lllT/lT I x APPROXIMATE LOCATION II LABORATORY TESTING- OF LAY OF LAND AREA (COLA) i x- 8, THE HAND AUGER BORINGS WERE LOCATED WITH A HAND-HELD GPS AND ARE SHOWN AT APPROXIMATE LOCATIONS. ~ .. - - - - --- I THE Y -- �� �\ \ Ir 9 COMPLETDEDELINEATION OF BORINGS CVERTICAL TERMINATED 1EXTENDAT TS ATTHOSEHAND AUGER LOCATIONS SHALLOW DEPTHS SUCH THAT 10 ADDITIONAL INFORMATION IS REQUIRED TO 10. SG -31S LOCATEDAT 202,057 ON. 2,303,905.0E AND NOT SHOWN IN THIS FIGURE. 11. WETLAND DELINEATION SHOWN WAS RECEIVED FROM AMEC FOSTER WHEELER ON DECEMBER 7, 2016. WETLAND IMPACTS FROM CLOSURE -RELATED ACTIVITIES TO BE PERFORMED ALONG THE DISCHARGE CANAL AND COOLING POND WERE ESTIMATED APPROXIMATELY n — .�►-- — a � �7/ / N x x I 0.6 AND 0.2 ACRES, RESPECTIVELY. — — — — —'9A i " I I HISTORICAL — — — — — — — -'QiL F- — x I } 0 400' INVESTIGATION LOCATIONS _ _ _ _ _ x—x x Z r J x SG -4 — — — — — — — — — I r ' I x— x X _ SCALE IN FEET Geos teC ` — — — — — — — — I r FIGURE 3 = — — — —— — `� x — consultants — — — — — — — ——� !. FOR REVIEW ONLY 2