Loading...
HomeMy WebLinkAbout20170043 Ver 1_Buffer and/or Stream Determination_20170220Water Resources Environmental Quality February 20, 2017 Mr. Arthur T. Hardy, Jr. 1759 Dallas Turner Road Kinston, NC 28504 ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director DWR #2017-0043 JONES County Subject: On -Site Determination for Applicability to Neuse River Riparian Buffer Rules (15A NCAC 02B .0233) Subject Property/ Project Name: Bondi Solar Farm Address/Location: 0.5 miles west of Intersection of NC Highway 58 and Burney Town Road near Kinston, NC Stream(s) Evaluated: Ut to Ash Branch and Ash Branch Determination Date: 02/14/17 Staff: Anthony Scarbraugh Determination Type: Buffer: Stream: ® Neuse (15A NCAC 0213 .0233) ❑ Intermittent/Perennial Determination ❑ Tar -Pamlico (15A NCAC 0213 .0259) Soil ❑ Catawba (15A NCAC 0213 .0243) ❑ Jordan (15A NCAC 02B .0267) (governmental Subject and/or interjurisdictional projects) ❑ Randleman (15A NCAC 0213 .0250) Survey ❑ Goose Creek (15A NCAC 02B.0605-.0608) 2017-0043 A Stream E/l/P* Not Subject Start@ Stop@ Soil USGS Subject Survey Topo 2017-0043 A P X 2017-0043 A 2017-0043 A X X Begin End 2017-0043 B E X 2017-0043 B 2017-0043 B E/I X Begin 2017-0043 B I X 2017-0043 B E/I 2017-0043 B X End *E/I/P = Ephemeroontermittent/Perennial The Division of Water Resources has determined that the stream listed above and included on the attached map(s) have been located on the most recent published NRCS Soil Survey of JONES County, North Carolina and/or the most recent copy of the USGS Topographic map at a 1:24,000 scale and evaluated for applicability to the Neuse River Riparian Buffer Rule. Each stream that is checked "Not Subject" has been determined to not be at least intermittent or not present on the property. Streams that are checked "Subject" have been located on the property and possess characteristics that qualify them to be at least intermittent streams. There may be other streams or features located on the property that do not appear on the maps referenced above but may be considered jurisdictional according to the US Army Corps of Engineers and subject to the Clean Water Act. 1 -•Nothing Compares =- State of North Carolina I Environmental Quality I Water Resources -Water Quality Regional Operations Section -Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 252-946-6481 BONDI SOLAR FARM JONES County 02/20/2017 Page 2 of 2 This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR may request a determination by the Director. An appeal request must be made within sixty (60) calendar days of date of this letter to the Director in writing. If sending via US Postal Service: c/o Karen Higgins DWR — 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 If sending via delivery service (UPS, FedEx, etc.): clo Karen Higgins DWR — 401 & Buffer Permitting Unit 512 N. Salisbury Street Raleigh, NC 27604 This determination is final and binding as detailed above, unless an appeal is requested within sixty (60) days. This determination only addresses the applicability to the buffer rules and does not approve any activity within the buffers. The project may require a Section 404/401 Permit for the proposed activity. Any inquiries regarding applicability to the Clean Water Act should be directed to the US Army Corps of Engineers Washington Regulatory Field Office at (910)-251-4629. If you have questions regarding this determination, please feel free to contact Anthony Scarbraugh at (252) 948- 3924. Sincerely, Robert Tankard, Assista t Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ cc: WaRO DWR File Copy LASERFICHE David Brame, Pilot Environmental, Inc. (via email: dbrame@pilotenviro.com)