Strickland, Bev
From:Scarbraugh, Anthony
Sent:Friday, February 17, 2017 3:30 PM
To:Renaldi, Ronald
Cc:Bodnar, Gregg
Subject:RE: Kitty Hawk Landing Dredge Extension Request
Ron,
This Office has no objection to extending the dredge period to March 5 as requested by the applicant.
Thanks,
Anthony Scarbraugh
Environmental Senior Specialist
Division of Water Resources – Water Quality Regional Operations
Department of Environmental Quality
252 948 3924 office
anthony.scarbraugh@ncdenr.gov
943 Washington Square Mall
Washington, NC 27889
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Renaldi, Ronald
Sent: Monday, February 13, 2017 4:28 PM
To: Staples, Shane <shane.staples@ncdenr.gov>; Pelletier, Josh R SAW (Josh.R.Pelletier@usace.army.mil)
<Josh.R.Pelletier@usace.army.mil>; Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov>
Cc: Bodnar, Gregg <gregg.bodnar@ncdenr.gov>
Subject: FW: Kitty Hawk Landing Dredge Extension Request
Hey all,
Kitty Hawk landing is currently conducting maintenance dredging in their canal system under CAMA Major
Permit#153-09, which has a moratorium in effect from February 15th to September 30 th. They are requesting
an extension through March 5 th and per the condition DMF, DWR and the USACE must be consulted prior to
any extension. Please see the attached request letter and let me know if you will authorize the extension as
well as any comments/concerns.
Thanks,
1
Ron
Ron Renaldi
Field Representative
NC Division of Coastal Management
NC Department of Environmental Quality
Ronald.Renaldi@ncdenr.gov
401 S. Griffin St., Ste 300
Elizabeth City, NC 27909
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Brian Rubino \[mailto:brubino@quible.com\]
Sent: Friday, February 10, 2017 2:59 PM
To: Renaldi, Ronald <ronald.renaldi@ncdenr.gov>
Cc: PETER COLLINS <ktyhwkpete@mac.com>
Subject: Kitty Hawk Landing Dredge Extension Request
Ron,
Please see attached dredge extension request letter for Kitty Hawk Landing. Please let me know if you would like for me
to contact any other regulatory agency representatives individually to discuss. I know we just received a new CAMA
Major for a separate project in Kitty Hawk with an April 1 dredge moratorium start. I do not know if that is going to
become a new date across the board in the Kitty Hawk area or not.
Thanks,
Brian
Brian D. Rubino, P.G.
Vice President
Quible & Associates, P.C.
8466 Caratoke Highway, Bldg 400
Powells Point, NC 27966
P.O. Drawer 870
Kitty Hawk, NC 27949
t 252.491.8147
f 252.491.8146
www.quible.com
LEGAL DISCLAIMER
The information transmitted is intended solely for the individual or entity to which it is addressed and may
2
contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or
taking action in reliance upon this information by persons or entities other than the intended recipient is
prohibited. If you have received this email in error please contact the sender and delete the material from any
computer.
3