Loading...
HomeMy WebLinkAbout20160728 Ver 1_Inspection_20170217Wetland Inspection Report Project Num: 20160728 Project Name: NCDOT - Replace Bridge 132 0 County: Orange Location: NCDOT - Replace Bridge 132 on Sr 1500 Latitude: +36° 14' 22" SW Plan Location Site Owner Name NC DOT Division 7 Inspection Date: 2/16/2017 Reason for Inspection Routine Inspection Type: Site Inspection (DOT) Inspection Contact Person: On-Site Representative(s): Primary Inspector: Dave Wanucha Secondary Inspector(s): Facility Compliance Status: � Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: � Permit (401 WQC) Inspection Summary: Version: 1 Status: Issued Project Type: Replace bridge with bridge Region: Raleigh Title: ❑ Not Compliant Longitude: -79° 10' 27" Phone: Phone: 336-776-9703 page: 1 Site Number: 20160728 Inspection Date: 2/16/2017 Owner: Tippett, Lyndo Inspection Type: Site Inspection (DOT) Reason for Visit: Routine Permit (401 WQC) Yes No NA NE Does the impact(s) match what was approved in the 401 WQC or non 404 permit? �❑❑❑ Are the culverts and/or filled areas installed properly? �❑❑❑ Is the site compliant with additional conditions of the 401 WQC or non 404 permit? �❑❑❑ Comment: The proiect was constructed as planned. Both barrels were backfilled and functioninq as desiqned. Disturbed areas were matted. page: 2