Loading...
HomeMy WebLinkAbout20160787 Ver 1_pre-con invite_20170206��pSLATFw^,. ���� q=: f uyr. ����: a,.W..m^ STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR February 6, 2017 JAMESH.TROGDON,III SECRETARY Contract No.: C203830 WBS Element: 34553.2.2 Federal Aid No.STP-125(1) TIP No.: R-3826 County: Martin Location: NC 125 FROM SR 1182 (EAST COLLEGE RD) TO NC 125 NORTHWEST OF WILLIAMSTON MR. JIMMY SPIVEY BARNHILL CONTRACTING COMPANY 1304 US17 SOUTH ELIZABETH CTfY, NC 27909 Subject: Preconstruction Conference Dear Mr. Spivey: This serves to confirm the Preconstruction Conference for the above referenced project has been scheduled for 10:00 A.M. Friday, February 17, 2017 at the District/ Resident Engineers Office located at 19210 US Hwy 64 East, Williamston, North Carolina. A proposed Progress Schedule should be submitted to the Department for review and approval at your earliest convenience. In addition the following information should be submitted to the Department at the Preconstruction Conference: • Detailed Construction Schedule • List of Project Personnel (i.e. Project Manager, Project Superintendent, Traffic Control Coordinator, Safety Officer, Certified Erosion and Sediment ControUStormwater Supervisor, Certified Foreman, Certified Installers, Cedified Designer, etcJ • List of Material Suppliers • List of Subcontractors • List of Company Officials authorized to sign Supplemental Agreements It is requested that you invite any proposed subcontractors deemed necessary. By copy of this letter I am inviting various Department representatives having involvement and/or interest in this project. I am also inviting utility representatives as well along with regulatory agency representatives. Mailing Address: Telephoee: (252) 769-6150 Locatiwc NC DEPARTMENT OP TRANSPORTATION F¢r: (252) 792-0539 I9210 US H WY 64 EAST RESIDENT ENGP]EER Q�stomer Service: 1-877368A966 WILLIAMSTON, NC 27892 19210 US HWY 64 EAST WILLIAMSTON, NC 27892 Websire: www.ncdot.gov Sincerely, �� ` �� D. W. (Chad) Edge III, P.E. � Resident Engineer DWE/ CC: Mr. Shawn Mebane, P.E.- Division Construction Engineer Mr. Darrick Lee, P.E: District Three Engineer Mr. Jason Davidson- Division Traffic Engineer Mr. Johnny Metcalfe, P.E: Area Constmction Engineer Mr. Andy Blankenship, P.E.- Roadside Environmental Field Operations Engineer Mr. Clay Willis-Division Environmental Officer Mr. Paul Williams-Environmental Specialist Ms. Tracy Brown- Division Utility Coordinator Ms. Michelle Pittman- Division Right of Way Agent Mr. Casey Whitley, P.E: Location and Surveys Engineer Mr. John Abel- Division Bridge Program Manager Mr. Kyle Barnes- USACE, Washington, NC Mr. Garcy Wazd- DWR, Washington Regional Office Mr. Greg Daisey- DCM, Elizabeth City File