Loading...
HomeMy WebLinkAbout20080857 Ver 1_Approval Letter_20080703o?OF WgTF9PG 1" vj ,y > r Swan Quarter Service Group Attn: Alice Keeney 30 Oyster Creek Road Swan Quarter, NC 27885 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources July 3, 2008 Coleen H. Sullins, Director Division of Water Quality Chuck Wakild, P.E., Deputy Director Division of Water Quality DWQ Project # 08-0857 Hyde County Subject Property: 56 Landing Road, Swan Quarter, NC Swan Quarter Bay, Fodrey Cr, 030308, 29-49, SA, ORW APPROVAL for the use of the "General" MAJOR VARIANCE; From the Neuse and Tar- Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with Additional Conditions Dear Ms. Keeney: You have our approval, in accordance with the conditions listed below, to impact approximately 800 square feet (ft) of Zone 1 and 400 square feet (ft) of Zone 2 of the protected riparian buffers for the purpose of constructing a gazebo and walkway on the subject property as described within your application dated April 28, 2008 and received by the DWQ on May 20, 2008. This letter shall act as your approval for the use of the "General" Major Variance; From the Neuse and Tar-Pamlico Riparian Buffer Rules for the Construction of Residential Structures on Existing Lots within the Coastal Counties as defined by the Coastal Area Management Act with ADDITIONAL CONDITIONS as approved by the Water Quality Committee (WQC) of the Environmental Management Commission (EMC) on May 10, 2001. In addition, you should get any other required federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control and CAMA permits. This approval shall expire when the variance expires on April 11, 2006 unless the variance is renewed before that time by the EMC. This approval is for the purpose and design that you described in your variance request. If you change your project, you must notify us and you may be required to send us a new request for approval. If the property is sold, the new owner must be given a copy of this approval and is thereby responsible for complying with all conditions. This approval requires you to follow the conditions listed below. The Additional Conditions of the Certification are: 1. Certificate of Completion North Carolina Division of Water Quality Internet: h2o.enr.state.nc.us 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 Nor?thCay?rohna A? r--1 nn..-di ;4-/nr6...,..1;- AM;- Cmnl.. - tZAO/ 0--lnW40N D-4 0--- 0-- . Vy ?> j ld m Swan Quarter Service Group: Page 2 of 2 It Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 2. Diffuse Flow All new stormwater drainage shall be directed to vegetated areas as diffuse now at non- erosive velocities prior to entering the protected riparian buffers as identified within 15A NCAC 2B .0259(5). No new ditching or piping of stormwater through the protected buffers is allowed. 3. Buffer Mitigation You are required to mitigate for impacts to the protected riparian buffers. The required area of mitigation to compensate for impacts to the protected riparian buffers is 800 square feet as required under this Authorization Certificate and 15A NCAC 2B .0259 (buffer mitigation rule). We understand that you wish to make a payment into the Riparian Buffer Restoration Fund administered by the NC Ecosystem Enhancement Program (EEP) to meet this mitigation requirement. This has been determined by the DWQ to be a suitable method to meet the mitigation requirement. In accordance with 15A NCAC 2B .0259(7)(buffer mitigation rule), this contribution will satisfy our compensatory mitigation requirements under 15A NCAC 2B .0259(10)(buffer protection rule). Until the EEP receives and clears your check (made payable to: DENR - Ecosystem Enhancement Program Office), no impacts specified in this Authorization Certificate shall occur. The EEP should be contacted at (919) 715-0476 if you have any questions concerning payment into the Riparian Buffer Restoration Fund. You have one month from the date of this approval to make this payment and provide the DWQ with a copy of the payment receipt. For accounting purposes, this Authorization Certificate authorizes payment into the Riparian Buffer Restoration Fund to compensate for 800 ft2 of required riparian buffer mitigation for impacts to 800 ft2 of protected riparian buffers; 03-03-08 river and subbasin." 4. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 5. Deed Notifications Deed notifications or similar mechanisms shall be placed on all retained jurisdictional wetlands, waters and protective buffers in order to assure compliance for future wetland, water and buffer impact. These mechanisms shall be put in place prior to impacting any Swan Quarter Service Group: Page 2 of 2 wetlands, waters and/or buffers approved for impact under this Certification Approval and Authorization Certificate. A sample deed notification can be downloaded from the 401/Wetlands Unit web site at http://h2o.enr.state.nc.us/ncwetlands. The text of the sample deed notification may be modified as appropriate to suit to this project. If you do not accept any of the conditions of this approval, you may ask for and adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This approval and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under the Tar-Pamlico River Riparian Buffer Protection Rules (15A NCAC 213.0259 (9)(b)). Please call Kyle Barnes of the Washington Regional Office at 252-948-3917 or Amy Chapman of the DWQ 401 Oversight/Express Unit at 919-715-6823 if you have any questions or require copies of our rules or procedural materials. Sincerely, A,6- Al Hodge/Supervisor Division of Water Quality Surface Water Protection Washington Regional Office Enclosurres: Certificate of Completion cc: r/DWQ 401 Oversight/Express Unit CAMA, Morehead CAMA, WaRO File Copy Central Files Filename: 08-0857