HomeMy WebLinkAbout20180110_17BP 3 R 61 Sampson 16_20170216NORTH CAROLINA DEPARTMENT OF TRANSPORTATION FIELD SCOPING MEETING WORKSHEET Let Date: 3/1/18 Pxo�CT NO.: 17BP.3.R.61 FIELD SCOPING MEETING DATE: February 1, 2017 11:30 a.m. Div�slolv: 3 LOCATION: Sampson 16 COLJNTY: Sampson ROUTE (LTS / NC / SR): SR 1145 PROJECT DESCRIPTION: Replace Bridge 16 over Buckhorn Creek BRIDGE NO.: 16 TIER: MPO / RPO AREA: MUNICIPALITY: ATTENDEES NAME (PRINT) PHONE No E-MAIL ATTENDED DIVISION BRIDGE Kevin Bowen 910-341-2000 kgbowen@ncdot.gov RESIDENT ENGINEER/PROJECT A1 Edgerton 910-341-2000 aedgerton@ncdot.gov �/ MANANGER ASST PROJECT MANAGER Caitlin Marks 910-341-2000 cmmarks@ncdot.gov �/ DIV 3 BRIDGE PROGRAM Justin Knight 910-259-2488 Jmknightl@ncdot.gov �/ DIV 3 BRIDGE PROGRAM Daniel Perry 252-287-8043 dlperry@ncdot.gov �/ DIVISION iTTILITY Steve Davis 910-341-2000 jsdavis2@ncdot.gov �/ COORDINATOR DNISION ENVIRONMENTAL Mason Herndon 910-341-2000 tmherndon@ncdot.gov �/ OFFICER ENVIRONMENTAL SPECIALIST Anneliese 910-341-2000 awestphal@ncdot.gov Wes hal DIVISION DESIGN CONSTRUCT David Leonard 910-341-2000 dbleonard@ncdot.gov REPRESENTATIVE HYDRAULICS REPRESENTATIVE Jon Moore 919-707-6738 jlmoore6@ncdot.gov �/ STRUCTURE DESIGN Greg Dickey 919-707-6469 gdickey@ncdot.gov REPRESENTATIVE LOCATION AND SURVEYS Rick Neal 910-341-0550 jneal@ncdot.gov �/ REPRESENTATIVE STRUCTURE DESIGN Korey Newton 919-707-6539 pknewton@ncdot.gov REPRESENTATIVE DIVISION OF WATER Joanne 910-796-7306 joanne.steenhuis@ncdenr �/ RESOURCES Steenhuis .gov US ARMY CORPS OF ENGINEERS Brad Shaver 910-251-4611 brad.e.shaver@usace.ar m .mil WILDLIFE RESOURCES Travis Wilson 919-707-0370 Travis.Wilson@ncwildlif COMMENTS COMMISSION e.org SUBMITTED US FISH & WILDLIFE SERVICES Gary Jordan 919-856-4520, ext. 32 gary,jordan@fws.gov DIVISION BRIDGE Ron Van Cleef 910-341-2000 rvancleef@ncdot.gov 1 MAINTENANCE ENGINEER GEOTECHNICAL LTNIT Dean 252-355-9054 dargenbright@ncdot.gov �/ Ar enbri ht HYDRAULICS/DRAINAGE/EROSI Josh Dalton jdalton@sungatedesign.c �/ ON CONTROL CONSLTLTANT om NEPA/ENVIRONMENTAL Craig Young Craig.young@threeoakse �/ CONSULTANT ngineering.com PROJECT MANAGER - David Wilver david.wilver@parsons.co �/ CONSULTANT m ROADWAY CONSLTLTANT Matt Pickens matt.pickens@parsons.co m ROADWAY CONSiTLTANT Ed Robbins ed.robbins@parsons.com �/ STRUCTURES CONSLTLTANT Tom Harris tom.harris@parsons.com �/ DIVISION (COMI'LETED BY DIVISION STAFF AND SENT WITH THE FSM LETTER) EXISTING FEATURES FEATURE BRIDGED: Branch Crane Creek (BRIDGE / CULVERT) LENGTH 36' DECK WIDTH (OUT TO OUT) 25.826' WATER DEPTH: 3.5' HEIGHT BED-T0.CROWN: 13.3' PRIOR SURVEY DATE: POSTED: SV 26 TTST: 39 STRUCTURE TYPE: SteeUtimber substructure; concrete overlay; 2-span SPAN TYPE: 19lines 6x14 timber joists; 2 span; 1@17'9; 1@18'1 HISTORIC HIGH WATER (ELEV. TO THE TOP OF RAIL ): -L- BASE YEAR: 2012 ANNUAL AVERAGE DAILY TRAFFIC: 360 % TRUCKS/DUALS: 6°/a SiJFFICIENCY RATING: 26.41 POSTED SPEED LIMIT IN PROJECT VICINITY: 55 mph (MPH / STATUTORY SSMPI� DETOUR: OFF-SITE: Y ON-SITE: N STAGE CONSTRUCTION: N IF DETOUR IS OFF-SITE, PROVIDE DESCRIPTION OF DETOUR ROUTE: From SR 1149: R on US 701; R on SR 1146 APPROXIMATE LENGTH OF DETOUR? 10.5 miles IMPROVEMENTS NEEDED TO ROAD ON DETOUR? COMMENTS: SR 1146 is currently closed due to Hurricane Matthew but should be repaired by the time the project begins IMPROVEMENTS NEEDED TO BRIDGES ON DETOUR? N/A ARE BRIDGES ON DETOUR CURRENTLY PROGRAMMED ON TIP? COMMENTS: ARE THERE EMS, SCHOOL, OR BUSINESS ACCESS ISSiJES? Moderate COMMENTS: Concern for Detour Length from schools ARE THERE ANY RAILROAD CROSSINGS ON DETOUR? NO COMMENTS: WILL RAILROAD INVOLVEMENT BE REQUIRED? NO SHOULD WORK ZONE PEDESTRIAN ACCESS BE MAINTAINED DURING CONSTRUCTION? NO REASONS: EXISTING R/W WIDTH: IMPACT RATING TO LJTILITIES: POWER TRANSMISSION LINES: 4county AERIAL/UGBOTH: OH IN CONFLICT: Possibility to de-energize TELEPHONE: Star AERIAL/LTG/BOTH: UG IN CONFLICT: Yes CABLE TV: Star AERIAL/UG/BOTH: UG IN CONFLICT: Yes FIBER OPTIC: AERIAL/iJGBOTH: IN CONFLICT: Yes WATER: Sampson IN CONFLICT: Yes SEWER: IN CONFLICT: -------- NATURAL GAS: IN CONFLICT: -------- OTHER IN CONFLICT: -------- BASED ON THE PAST HISTORY NEAR THIS PROJECT SITE, WHAT IS THE ESTIMATED TIME REQLTIRED TO COMPLETE UTILITY ADNSTMENTS MONTHS WHICH UTILITIES WILL REQLTIRE PERMITS FOR RELOCATION? All; Utility permit drawings showing aerial; maintain low coordinate of bridge; Show where bore locations will be WHAT TYPE PERMIT? Normal (not CAMA) WHO WILL BE OBTAINING PERMITS FOR iTTILITY RELOCATION? PEF (Sub: So Deep); dry utilities should be moved at the latest 1 month prior to let date; wet utilities will be moved as part of the construction contract IS THERE ANY FUTURE UTILITY CONSTRUCTION ANTICIPATED IN THE PROJECT AREA? IS A FEMA BUY-OUT PROPERTY BEING IMPACTED? EXISTING UTILITY DRAWING ATTACHED? HYDRAULICS (COMPLETED BY HYDRAULICS ENGINEER PRIOR TO THE FSM) WILL THIS PROJECT REQUIRE A FEMA PERMIT? Yes IS THERE UNUSUAL SCOUR POTENTIAL? No IS PROTECTION NEEDED? Std ARF. BANKS STABLE? No (Hurricane Matthew) IS PROTECTION NEEDED? STD DOES STREAM CARRY APPRECIABLE AMOiJNT OF LARGE DEBRIS? No WILL THE PLACEMENT OF BENTS IN THE WATER BE ALLOWED? No COMMENTS: 80' Single span 33" box beam BRIDGE TO PIPE CANDIDATE? No COMMENTS: WILL THIS PROJECT REQUIRE A STATE STORMWATER PERMIT? HOW WILL ROADSIDE DRAINAGE AND / OR TREATMENT OF STORMWATER VIA THE BRIDGE DECK BE ADDRESSED FOR EACH QUADRANT? Flumes likely NE QUADRANT: SE QUADRANT: SW QUADRANT: NW QUADRANT: GEOTECHNICAL UNIT (COMPLETED BY GEOTECHNICAL UNIT PRIOR TO THE FSM) EXISTING FOLJNDATION REPORTS? No IF SO, ATTACH. KNOWN GEOLOGICAL FEATURES IN AREA VVHICH MAY AFFECT DESIGN: No ARE PERMITS NEEDED FOR INVESTIGATIVE WORK AT SITE? No COMMENTS: ARE THERE ANY HISTORICAL AND / OR VIBRATION SENSITIVE STRUCTURES NEAR BY? No COMMEN'TS: House is not close enough; waiting to hear back about the fallen structure up creek ARE THERE ANY KNOWN LANDFILLS AND / OR GEOENVIRONMENTAL HAZARD SITES AT OR WITHIN CLOSE 3 PROXIMITY TO THE PROJECT SITE? No CONIMENTS: DEPTH OF WEATHERED ROCK OR ROCK BELOW STREAIVIBED? N/A (FT.) ARE ANY IMPACTS ANTCIPATED TO NATURAL SPRINGS OR ARTESIAN WELLS? No COMMENTS: Our boreholes will be sealed POSSIBLE FOUNDATION TYPE: Pile — Recommend bents be placed a minimum of 5 feet away from ea�isting bents. ENVIRONMENTAL �coNrnLETED BY DEo sTaFF P�ox To T� FSM� WETLANDS AT SITE? No COlVIMENTS: National Wetlands Inventory Classified as PFO1C (Freshwater Forrested/Shrub Wetland) adjacent to site. KNOWN ENDANGERED SPECIES POPULATIONS IN AREA? No COMMEN'TS: None BLTFFER REQUIREMENTS? None CAMA COLINTY: No PRIMARY NURSERY AREA: No DCM CLAIMING: No MORATORIA: No IF YES-DURATION: N/A COMMENTS: None IS WATER FEATURE CLASSIFIED AS A WILD AND SCENIC RIVER? No COMN�NTS: None required WHAT IS THE WATER QUALITY CLASSIFICATION FOR THIS PROJECT:C;Sw STREAM ID# 18-68-2-12-2 WILL A COAST GUARD PERMIT BE REQUIRED? No CONIlVIENTS: None required IS THE PROJECT SITE IN OR NEAR ANY OF THE FOLLOWING: NATIONAL FOREST: No WILDLIFE REFUGE: No STATE, COiJNTY, OR LOCAL PARK: No AIRPORT: No A LAKE FOR RECREATION OR POWER GENERATION: No WATER SUPPLY RESERVOIR: No NUTRIENT SENSITIVE WATERS: No PUBLIC USE BOAT RAMP: No CEMETARIES: No WILL A FEDERAL ENERGY REGiJLATORY COMMISSION (FERC) PERMIT BE REQUIRED? No IS THE PROJECT AREA KNOWN FOR POTENTIAL INDIAN, COLONIAL, OR OTHER ARCHAEOLOGICAL SITES? TBD (NCSHPO) KNOWN OR POTENTIAL HISTORIC PROPERTIES IN THE AREA? TBD (NCSHPO) IS THE BRIDGE STRUCTURE ITSELF, OR ANY PART THEREOF, CONSIDERED HISTORIC? TBD (NCSHPO) WILL THE PROJECT IMPACT A CHURCH, COMMLJNITY CENTER, OR OTHER PUBLIC FACILITY? No IS THIS PROJECT ON A STATEWIDE BICYCLE ROLJTE OR A LOCAL NON-MARKED BICYCLE ROiTTE? No ANY CLARIFICATION OR COMMENTS ON ITEMS ABOVE: Vann-Boney Mill NCSHPO SP0139 (Surveyed Only) — waiting on info about this; Mason will send updated photos to show the structure has fallen CONSTRUCTABILITY AND ACCESS (DISCUSSED AT THE FSM BY DIVISION BRIDGE MANAGER) 4 METHOD OF ACCESS: Road Closure will provide room for all of the following: TOP-DOWN: Yes MATERIAL AND EQLTIPMENT ACCESS TO SITE: Yes TRACTOR-TRAILER ACCESS: Yes BARGE ACCESS: Yes HEAVI' EQUIPMENT ACCESS: Yes POSTED ROADS AND POSTED BRIDGES IN VICINITY THAT MAY AFFECT ACCESS? TBD ARE CONSTRUCTION STAGING AREAS AVAILABLE NEAR SITE? Yes ANY ANTICIPATED AREAS OF TEMPORARY SHORING REQLTIRED? No ADDITIONAL COMMENTS: 80' box beams will require a larger crane than normal; powerlines may be an issue ROADWAY (COMPLETED BY ROADWAY ENGINEER PRIOR TO FSM) ALIGNMENT: EXISTING HORIZONTAL: Straight EXISTING VERTICAL: Flat POSSIBLE DESIGN STANDARDS: Sub Regional Tier POSSIBLE DESIGN SPEED: 60 MPH POSSIBLE DESIGN EXCEPTIONS: No CONIMENTS: APPROXIMATE PROJECT LENGTH: 800 FT APPROXIMATE PROJECT LENGTH: S00 FT SHOULD THIS PROJECT HAVE CURB AND GLTTTER OR SHOULDER APPROACHES? Shoulder COMMENTS: TOTAL SHOLJLDER WIDTH: 3 foot min. (4 ft/ GR) TOTAL SHOULDER WIDTH: 3 foot min. (4 ft / GR) CLEAR ROADWAY ON STRUCTURE: 28 foot min. WILL EXISTING DRIVEWAYS, BUSINESS ACCESS, -Y- LINES OR RAMPS NEED TO BE RELOCATED? No COMMENTS: Guardrail will need to be shortened for the driveway to the old mill. ARE THERE ADDITIONAL RIGHT OF WAY / PERMANENT EASEMENTS / TEMPORARY EASEMENTS ANTICIPATED FOR CONSTRUCTION? TCE COMMENTS: ARE ANY RETAINING WALLS ANTICIPATED? No ADDITIONAL COMMENTS: Bridge will be 33 feet out to out (additional width requested by division for farm equipment) ITEMS TO BE DISCUSSED / RESOLVED AT FSM BY ATTENDEES ALTERNATIVES TO BE STUDIED BY ROADWAY DESIGN (CHECK ALL THAT APPLY) OFF-SITE DETOUR � ON-SITE DETOUR ❑ NEW LOCATION ❑ CHECK ONE TYPE OF ENVIRONMENTAL DOCUMENT (CHECK ONE) LIBR ATT G � PROGRAMMATIC CATIGORICAL EXCLUSION (PCE) ❑ MINIMUM CRITERIA RULE COMPLIANCE CHECKLIST ❑ THE OPTIMUM LET DATE FOR THIS PROJECT IS: March 1, 2018 SURVEY LIMITS: 50' L/R; 400' up and down; more info about Hurricane Matthew (Shannon Bailor) POSSIBLE SUPERSTRUCTURE: Box Beam 5 NUMBER OF SPANS: 1 LENGTH OF SPANS: 80' TOTAL PROPOSED LENGTH: 80' TOTAL PROPOSED WIDTH: 33' OTO BRIDGE SKEW: 90 degree ROW BY: December 2017 PERMITS: December 2017 METHOD OF CLEARING: Modified Method III SALVAGEABLE MATERIALS: No REMOVAL OF REMENANT ABUTMENTS / PIERS: Completely Remove DECK OVERLAY TYPE Asphalt ADDITIONAL COMMENTS: Do not include deck drains on the bridge; plans should use a scale of 50 APPROACH SLAB ON SKEW OR PERPENDICLTLAR: Perpendicular SHOULD PILES BE NON-CORROSIVE MATERIAL: No *Note: Detour will go down Moseley Avenue instead of Cartertown Rd (maps has blocked it due to Hurricane Washout): � � 14 r�in ., i0-: 04��1�s; � *b � via r.-,r.erlow�n Rd antl Chance; Rd 1um!n:�.u-:cu'rr�"r,r. � 2a2�-2�29 Chancey Road ,_ _., - Take� Cartertov:n Rtl IIo US-70� 5 J ri9 I: �7 f�'I/ s� I��m left Oni� LIS-7�7 S� _ nin,' : r'ii . rcllow C�nancey� Rm ta 6aneg f,1tll Rc] i i_: rvb 1916-2�22 8oney hlill Road _ � .. r;: --,.�'- Tp=x ]i2:�or.� era>arplanrnry p�rPGs�s onlp �, -.-3� `vi tl�a: cnnnrutli�r r,rc}s;is. traffi�. rreather. nrm[hdr �:erc� ��.; cs��e io.•�:s'r:l -5n='ran .,iIL-�n'��� ufinfar.,.,i..,.,_ '::I'Jil]U'i �� 'I'l -.•B�.�CII -_PSCrtPftiiES �9'JIR".]Lf! 9 �Iy s _, ,:u '_23 azi I�� , ,,,�,��.,, � ,.:, lld v.uanmy AULV I15i