HomeMy WebLinkAboutNC0047384_Compliance Evaluation Inspection_20170203XIA
February 3, 2017
Mr. Steven Drew, Director
Water Resources Department
City of Greensboro
P.O. Box 3136
Greensboro, NC 27402-3136
SUBJECT: Compliance Evaluation Inspection
City of Greensboro - T.Z. Osborne WWTP
NPDES Permit No. NCO047384
Guilford County
Dear Mr. Drew:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. JAY ZIMMERMAN
Director
RECEIVEDINMCDEQ019R
'FEB 4 2017
VVatet Quality
perr^tttAng Section
On January 26, 2017, Min Xiao and Ron Boone of this office met with Mr. Elijah Williams, Mr. Bradley
Flynt, Mr. Lawrence O'Neal, Ms. Martie Groome and Ms. Alicia Goots to perform a Compliance Evaluation
Inspection of the NPDES wastewater discharge from the T.Z. Osborne facility (TZO). The inspection findings
are detailed below and an inspection checklist is attached.
I. Permit
The NPDES was reissued on July 1, 2014. TZO is currently being upgraded to 56.0 MGD to accommodate
flow from the planned North Buffalo decommissioning and to meet the proposed total nitrogen limits.
H. Self -Monitoring Program
The monthly Discharge Monitoring Reports (DMRs) were reviewed for the,period November 2015 through
October 2016. The facility was only found to be non-compliant with the effluent limits for weekly average
NH3-N in the weeks of April 9r'' and April 30`i' in 2016. In regards to the permit monitoring requirements, it
was noted that all sampling was performed per the frequencies specified in the permit.
M. Flow Measurement
An ultrasonic meter with parshall flume is used to report effluent flow on the DMRs. The meter is calibrated
once per year. It was last calibrated on March 15, 2016 by city staff. In addition, flow proportional composite
samples are collected of the effluent as required by the permit.
IV. Sludge Handling and Disposal
Solids handling consists of two sludge receiving tanks, four gravity thickeners, three centrifuges, thickened
sludge holding tanks and two fluidized bed incinerators. Incinerator ash is taken to the landfill. Solids from
the North Buffalo facility are also handled at TZO.
V. Operations and Maintenance
This inspection indicated that the operation and maintenance of TZO WWTP was performed excellently by
operators and laboratory staff. The lab was also observed to be clean and organized.
State of North Carolina I Environmental Quality
450 W. Hanes Mill Road, Suite 300, Winston-Salem, North Carolina 27105
Phone: 336-776-98001 FAX: 336-776-9797
Page 2
VI. Facility Site Review
Please see the attached inspection checklist for specific comments on the system components. It was noted
that the construction is continuing in order to upgrade the facility from 40 MGD to 56 MGD. The construction
is expected to be completed by 2020.
VII. Records/Reports
All required information was readily available, complete, and current. A comparison of the February 2016
DMR with the laboratory records for pH, dissolved oxygen, CBOD, total phosphorus and selenium revealed
that these parameters were accurately transcribed onto the monitoring report. In addition, the 2015 Annual
Performance Report was available for review.
VIII. Effluent/Receivin Waters
The system discharges into South Buffalo Creek, class "WS -V; NSW" waters in the Cape Fear River Basin.
The effluent was clear on the day of inspection.
Should you have any questions concerning this report, please contact Min Xiao or me at (336) 776-9800.
Sincerely,
17`/Sherri V. Knight, PE
Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources
cc: Elijah Williams (elijah.williams@greensboro-nc.gov)
Bradley Flynt (bradley.flynt@greensboro-nc.gov)
Martie Groome (martie.groome@greensboro-nc.gov)
Central Files
NPDES Unit
WSRO
United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector
Fac Type
1 I,, 1 2 15 I 3 I NC0047384 I11 12 17/01/26 17 18 L_ i 19 L G
201
2111.11 I I I I I III I I I I I I I I I I I I I I I I I I I I I I III I I
I I 1166
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 - QA -----------Reserved-------
I 71 I I 72 L N J 731 I 174 75III
67 70 Iu it L J I I I
80
Section B: Facility Data
Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:OOAM 17/01/26
14/07/01
T.Z. Osborne WWTP
2350 Huffine Mill Rd
Exit Time/Date
Permit Expiration Date
Mc Leansville NC 27301
12:45PM 17/01/26
19/06/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Bradley Todd Flynt/ORC/336-433-7262/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Steven Drew,PO Box 3136 Greensboro NC 274023136//336-373-2055/3364126305
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement ® Operations & Maintenance Records/Reports
Self -Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
Ron Boone WSRO WQH336-776-9690/f/
�
Min Xiao _ WSRO WQ//336769800/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers
Signature
Date
1,711
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
31 NCO047384 I� � 121 17/01/26 17 18 I
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page#
Jj
S
Permit: NCO047384 Owner - Facility: T.Z. Osborne WWTP
Inspection Date: 01/26/2017 Inspection Type: Compliance Evaluation
Permit
Yes No NA NE
(If the present permit Iexpires in 6 months or less). Has the permittee submitted a new.
❑
❑
0
❑
application?
0
❑
❑
❑
Is the facility as described in the permit?
0
❑
❑
❑
# Are there any special conditions for the permit?
M
❑
❑
❑
Is access to the plant site restricted to the general public?
M
❑
❑
❑
Is the inspector granted access to all areas for inspection?
M
❑
❑
❑
Comment: T.Z. Osborne WWTP is now in the process of upgrading from 40 MGD to 56 MGD. Around
July 2017 the staff will conduct a pilot test of taking more wastewater from North Buffalo
Creek WWTP to ensure the effluent limits will still be in compliance with the permit. All the
construction is expected to be completed by 2020.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? M ❑ ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable M ❑. ❑ ❑
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment: _
Record Keeping
Yes No NA NE
Are 'records kept and maintained as required by the permit?
M
❑
❑
❑
Is all required information readily available, complete and current?
0
❑
❑
❑
Are all records maintained for 3 years (lab. reg. required 5 years)?
M
❑
❑
❑
Are analytical results consistent with data reported on DMRs?
M
❑
❑
❑
Is the chain -of -custody complete?
0
❑
❑
❑
Dates, times and location of sampling
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
0
Name of individual performing the sampling
❑
.
on each shift?
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported CDCs
Are DMRs complete: do they include all permit parameters?
M
❑
❑
❑
Has the facility submitted its annual compliance report to users and DWQ?
0
❑
❑
❑
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator
0
❑
❑
❑
on each shift?
Is the ORC visitation log available and current?
M
❑
❑
❑
Is the ORC certified at grade equal to or higher than the facility classification?
M
❑
❑
❑
Page#
3
W
Permit: NCO047384 Owner - Facility: T.Z. Osborne WwrP
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
Inspection Date: 01/26/2017 Inspection Type: Compliance Evaluation
❑
Is the wet well free of excessive grease?
0
❑
Record Keeping
Yes No NA NE
Is the backup operator certified at one grade less or greater than the facility classification?
M
❑
❑
❑
Is a copy of the current NPDES permit available on site?
M
❑
❑
❑
Facility has copy of previous year's Annual Report on file for review?
■
❑
❑
❑
Comment: A comparison of the February 2016 DMR with the laboratory records for PH dissolved
oxygen, CBOD, total phosphorus and selenium revealed that these parameters were
accurately transcribed onto the monitoring report. The 2015 Annual Performance Report
was prepared and also available online and in local library.
Pump Station - Influent
Yes No NA NE
Is the pump wet well free of bypass lines or structures?
0
❑
❑
❑
Is the wet well free of excessive grease?
0
❑
❑
❑
Are all pumps present?
M
❑
❑
❑
Are all pumps operable?
❑
M
❑
❑
Are float controls operable?
M
❑
❑
❑
Is SCADA telemetry available and operational?
M
❑
❑
❑
Is audible and visual alarm available and operational?
M
❑
❑
❑
Comment: There are 4 pumps in total. Only two of the pumps were operating during
the inspection. For
another two pumps, one was out of service and the other one was being
rebuilt.
Bar Screens
Yes No NA NE
Type of bar screen
a.Manual
❑
b.Mechanical
Are the bars adequately screening debris?
0
❑
❑
❑
Is the screen free of excessive debris?
■
❑
❑
❑
Is disposal of screening in compliance?
❑
❑
❑
Is the unit in good condition?
®
❑
❑
❑
Comment: The bar screens are 36 feet Ion
Grit. Removal Yes No NA NE
Type of grit removal
a.Manual ❑
b. Mechan ical
Is the grit free of excessive organic matter? M ❑ ❑ ❑
Is. the grit free of excessive odor? 0 ❑ ❑ ❑
Page# 4
:.
Permit: NC0047384 Owner - Facility: T.Z. Osborne WWrP
Inspection Date: 01/26/2017 Inspection Type: Compliance Evaluation
Grit Removal Yes No NA NE
# Is disposal of grit in compliance? N ❑ ❑ ❑
Comment:
Primary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
N
❑
❑
'❑
Are weirs level?
N
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
is the site free of evidence of short-circuiting?
E
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
E
❑
❑
❑
Is the drive unit operational?
■
❑
❑
❑
Is the sludge blanket level acceptable?
E
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately %4 of the sidewall depth)
N
❑
❑
❑
Comment: There are 6 primary clarifiers (2 circular and 4 rectangular).
Equalization Basins
Yes No NA NE
Is the basin aerated?
❑
❑
❑
0
Is the basin free of bypass lines or structures to the ,natural environment?
N
❑
❑
❑
Is the basin free of excessive grease?
E
❑
❑
❑
Are all pumps present?
0
❑
❑
0
Are all pumps operable?
❑
❑
❑
E
Are float controls operable?
❑
❑
❑
Are audible and visual alarms, operable?
❑
❑
❑
E
# Is basin size/volume adequate?
E
❑
❑
❑
Comment: The old 3.5 MG EQ basin and a new 4.5 MG EQ basin were in use.
Aeration Basins
Yes No NA NE
Mode of operation
Ext. Air
Type of aeration system
Diffused
Is the basin free of dead spots?
0 ❑
❑
❑
Are surface aerators and mixers operational?
0 ❑
❑
❑
Are the diffusers operational?'
0 ❑
❑
❑
Page# 5
Permit: N00047384
Owner - Facility: T.Z. Osborne WWTP
Is the clarifier free of black and odorous wastewater?
0
❑
Inspection Date: 01/26/2017 '
Inspection Type: Compliance Evaluation
Is the site free of excessive buildup of solids in center well of circular clarifier?
e
❑
Aeration Basins
Yes No NA NE
Is the foam the proper color for the treatment process?
®
❑
❑
❑
Does the foam cover less than 25% of the basin's surface?
e
❑
❑
❑
Is the DO level acceptable?
0
❑
❑
❑
Is the DO level acceptable?(1.0 to 3.0 mg/1)
0
❑
❑
❑
Comment: , There are 12 aeration basins in total. Only 11 of them were being used during the inspection.
The DO level observed was 2.58 mg/I.
Secondary Clarifier
Yes No NA NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
e
❑
❑
❑
Are weirs level?
®
❑
❑
❑
Is the site free of weir blockage?
e
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
'❑
Is the drive unit operational?
❑
❑
❑
Is the return rate acceptable (low turbulence)?
N
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
M
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately %< of the sidewall depth)
N
❑
❑
❑
Comment: Seven secondary clarifiers with covered weir troughs to control algea (5 in use now, 2 under
construction). Another 3 new secondary clarifiers are being built.
Filtration (High Rate Tertiary)
Type of operation:
Is the filter media present?
Is the filter surface free of clogging?
Is the filter free of growth?
Is the air scour operational?
Is the scouring acceptable?
Is the clear well free of excessive solids and filter media?
Yes No NA NE
N ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ■ ❑
❑ ❑ N ❑
❑ ❑ N ❑
Comment: The sand filters are no longer in use since the beginning of 2017. Instead. six
AguaDiamond@ Cloth Media Filters were completed construction (3 in use now). This new
filtration system is more cost-efficient.
Disinfection -Liquid
Yes No NA NE
Page# 6
Permit: NCO047384 Owner -Facility: T.Z.OsborneWWTP
Yes No NA NE
Type of system ?
Liquid
❑
Inspection Date: 01/26/2017 Inspection Type: Compliance Evaluation
❑
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
0
Disinfection -Liquid
Yes No NA NE
Is there adequate reserve supply of disinfectant?
❑
❑
❑
❑
(Sodium Hypochlorite) Is pump feed system operational?
0
❑
❑
❑
Is bulk storage tank containment area adequate? (free of leaks/open drains)
0
❑
❑
❑
Is the level of chlorine residual acceptable?
M
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
E
❑
❑
❑
Comment: Two more contact chambers are being constructed (four contact chambers existed).
De -chlorination
Yes No NA NE
Type of system ?
Liquid
❑
❑
❑
Is the feed ratio proportional to chlorine amount (1 to 1)?
❑
0
❑
❑
Is storage appropriate for cylinders?
❑
❑
M
❑
# Is de -chlorination substance stored away from chlorine containers?
❑
❑
❑
M
Are the tablets the proper size and type?
❑
❑
M
❑
Comment: The feed ratio of sodium bisulfite to chlorine amount was approximately 6 to 15.
Page#
7
Are tablet de -chlorinators operational?
❑
❑
0
❑
Number of tubes in use?
Comment:
Flow Measurement - Effluent
Yes No NA NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
M
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
0
0
Comment: The meter was calibrated once per year. It was last calibrated on March 15, 2016 by city
staff.
Page#
7
Effluent Sampling
Yes No NA NE
Is composite sampling flow proportional? .
0
❑ ❑
❑
Is sample collected below all treatment units?
M
❑ ❑
❑
Is proper volume collected?
0
❑ ❑
❑
Is the tubing clean?
M
❑ ❑
❑
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
M
❑ ❑
El
Celsius)?
Page#
7
Permit: NCO047384 Owner -Facility: T.Z. OsborneWWTP
Inspection Date: 01/26/2017 Inspection Type: Compliance Evaluation
Effluent Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type 0 ❑ ❑ ❑
representative)?
Comment: The refrigeration temperature was 3.17 Celcius degrees.
Effluent Pipe
Yes No NA NE
Is right of way to the outfall properly maintained?
M
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes. are required) are they operating properly?
N
❑
❑
❑
Comment: The system discharges into South Buffalo Creek, class "WS -V; NSW waters in the Cape
0
❑
Fear River Basin. The effluent was clear on the day of inspection.
❑
Is the site free of sludge buildup on belts and/or rollers of filter press?
M
❑
Solids Handling Equipment
Yes No NA NE
Is the equipment operational?
0
❑
❑
❑
Is the chemical feed equipment operational?
N
❑
❑
❑
Is storage adequate?
0
❑
❑
❑
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
0
❑
❑
❑
Is the site free of sludge buildup on belts and/or rollers of filter press?
M
❑
❑
❑
Is the site free of excessive moisture in belt filter press sludge cake?
N
❑
❑
❑
The facility has an approved sludge management plan?
0
❑
❑
❑
Comment: After belt filter press (solid content around 25 to 30 %), the sludge
will be sent to the
incinerators. Incinerator ash is taken to the landfill. The solids from North Buffalo are
pumped to TZO for handling.
Page# 8