HomeMy WebLinkAboutNCG140418 DMR SW (4) STORMWATER DISCHARGE OUTFALL (SDO) - Semi-Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO:_NCG140418 SAMPLE COLLECTION YEAR: 2016
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant SAMPLING PERIOD: ®July-December ❑January-June
PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake
CERTIFIED LABORATORY ESC Lab#ENV 375 PHONE NO.(919)460-5317
Lab# ADD TO LISTSERVE?DYES NO EMAIL:
OPTIONAL INFO: August Monitoring Event DISCHARGING TO CLASS: ESA ❑HQW ❑PNA ❑Trout ®Other
Part A:Stormwater Monitoring Requirements
Date Sample In Tier 2
Collected pH Event Total
Outfall No. (Standard TSS Duration Rainfall4 Monthly #of Months in Tier
(mo/dd/yr OR (mg/L) Monitoring? 2 Sampling2
NO FLOW)1 Units) (minutes) (in)
NM)
- - 6-92 1002,3 - - - -
001 NO FLOW n NA
Click here to Click here to Click here to
enter text. enter text. RECEIV7! " enter text.
Click here to Click here to JAN 12 2117 Click here to Click here to
enter text. enter text. enter text. enter text.
CENTRAL FECES
C1,"‘Ak" SEt.`7i(JIN
1 If"NO FLOW"or"NO DISCHARGE,Enter"NO FLOW"or"NO DISCHARGE"for each outfall here. Please make sure to mark the sample period above.
Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
2 If a value is in excess of the benchmark,or outside the benchmark range(for pH),you must implement the Tier 1 or Tier 2 responses in the General Permit.Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I,except when discharging to ORW,HQW,Trout,and PNA waters where they are 50 mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge.
Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using>55 gal of new motor oil/month—averaged over a calendar year.
In Tier 2
pH TPH using method Total Suspended Event Total New Motor Oil #of Months
Outfall Date Samplea Monthly
(Standard 1664A SGT-HEM Solids Duration Rainfall Usage in Tier 2
No. Collected Monitoring? 2
(mo/dd/yr)1 Units), (mg/l.) (mg/L) (minutes) (in) (gal/month) (y/n) Sampling
6-92 152 1002'3 - - - - -
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO Ei
HAVE YOU CONTACTED THE REGION? YES ❑ NO El
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR(including all"No Flow" &"No Discharge" reports)within 30 days of receipt of sample (or at end of monitoring period
in case of"No Flow")to:
Division of Water Quality
Attn:DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
Zht-
5' (3GL
28/20/2016
(Signature of Permittee) (Date)
Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11
Page 3 of 2
STORMWATER DISCHARGE OUTFALL (SDO) - Semi-Annual MONITORING FORM
GENERAL PERMIT NO. NCG140000
CERTIFICATE OF COVERAGE NO.INCG140418 SAMPLE COLLECTION YEAR: 2016
FACILITY NAME: Thomas Concrete of Carolina-Knightdale Plant SAMPLING PERIOD: ❑July-December ®January-June
PERSON COLLECTING SAMPLES Kevin Kelt COUNTY Wake
CERTIFIED LABORATORY ESC Lab#ENV 375 PHONE NO. (919)460-5317
Lab# ADD TO LISTSERVE?OYES NO EMAIL:
OPTIONAL INFO: April Monitoring Event DISCHARGING TO CLASS: OSA ❑HQW ❑PNA ❑Trout ®Other
Part A:Stormwater Monitoring Requirements
Date Sample In Tier 2
Collected pH Event Total a Monthly #of Months in Tier
Outfall No. (Standard TSS Duration Rainfall4 OR (mg/L) Monitoring? 2 Sampling2
NO FLOW)' Units) (minutes) (in) (y/n)
- - 6-92 1002'3 - - - -
001 NO FLOW n NA
Click here to Click here to Click here to
enter text. enter text. enter text.
Click here to Click here to tr`a I '1 E-1 Click here to Click here to
enter text. enter text.
JAN 1 ?017 enter text. enter text.
GENII RAL FILES
J V 0701 ivi
•
1 If"NO FLOW"or"NO DISCHARGE,Enter"NO FLOW"or"NO DISCHARGE"for each outfall here. Please make sure to mark the sample period above.
Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11
Page 1 of 2
2 If a value is in excess of the benchmark,or outside the benchmark range(for pH),you must implement the Tier 1 or Tier 2 responses in the General Permit.Tier 2
Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range.
3 TSS benchmark values are 100 mg/I,except when discharging to ORW,HOW,Trout,and PNA waters where they are 50 mg/I.
4 For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge.
Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11
Page 2 of 2
Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using>55 gal of new motor oil/month—averaged over a calendar year.
In Tier 2
Outfall Date Sample pH TPH using method Total Suspended Event Total New Motor Oil Monthl #of Months
(Standard 1664A SGT-HEM Solids Duration Rainfall4
Usage y in Tier 2
No. Collected Monitoring? 2
(mo/dd/yr)1 Units) (mg/L) (mg/L) (minutes) (in) (gal/month) (Yin)
Sampling
6-92 152
1002,3 - - - - -
•
HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO
HAVE YOU CONTACTED THE REGION? YES ❑ NO
REGIONAL OFFICE CONTACT NAME:
Mail Original and one copy of this DMR(including all"No Flow" &"No Discharge" reports)within 30 days of receipt of sample (or at end of monitoring period
in case of"No Flow")to:
Division of Water Quality
Attn: DWQ Central Files
1617 Mail Service Center
Raleigh,North Carolina 27699-1617
YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED:
"I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to
assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or
those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I
am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations."
5'aht 4/20/2016
(Signature of Permittee) (Date)
Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11
Page 3 of 2