HomeMy WebLinkAbout20150342 Ver 2_More Info Received - Email_20170215 Homewood, Sue
From: Wayne Barber <wbarber@allied-engsurv.com>
Sent: Wednesday, February 15, 2017 9:15 AM
To: Homewood, Sue
Cc: Steve Causey
Subject: Smith Crossing Stream Crossing
Attachments: C2.3 - CREEK CROSSING DETAILS.PDF; C2.2 - CREEK CROSSING EROSION CONTROL PLANYDF
Sue, attached you will find the construction drawings for the stream crossing at Smith Crossing for your use.
These drawings reflect the construction sequence to install the pipe in the dry as well as the detail of the outlet stabilization for the
pipe.
Hopefully these plans clarify some of the questions that you may have had. Please feel free to contact our office if you need any
additional information or if you have any questions.
Thank You,
Wayne A. Barber
Allied Design, Inc.
Firm License No. C-1891
4720 Kester Mill Road
Winston-Salem, North Carolina 27103
Phone: (336) 765-2377
Fax: (336) 760-8886
Direct: (336) 397-1218
wbarber@allied-engsurv.com
1
STAGE 1 SEQUENCE STAGE 2 SEQUENCE SITE DATA
1. CLEAR ONLY AS NECESSARY TO ALLOW FOR INSTALLATION OF TEMPORARY SKIMMER SEDIMENT BASINS#11 AND#12 1. CONTINUE PLACEMENT OF ROADWAY FILL. PROVIDE TEMPORARY VEGETATIVE OWNER/DEVELOPER: PARCEL ID:6874-29-9209
AND DIVERSION BERMS. INSTALL TEMPORARY SEDIMENT FENCING. KEY NOTES COVER ON FILL SLOPES WITHIN SPECIFIED TIME FRAMES. BLOCK 5632 LOT 018J " .re oov Co
PARCEL ID:6874-38-6720 �os� arc o` o
2. INSTALL TEMPORARY SKIMMER BASINS AND TEMPORARY DIVERSION BERMS. OA TEMPORARY SEDIMENT FENCE. 2. INSTALL STORM DRAINAGE AND OTHER UTILITY LINES IN PROPOSED ROADWAY. BLOCK 5632 LOT 166B So/omon Dr ° o N
PARCEL ID:6874-48-8564 �° _ \�°
3. BEGIN CLEARING AND GRUBBING. OB TEMPORARY DIVERSION BERM. 3. COMPLETE ROADWAY CONSTRUCTION AND CONTINUE TO MAINTAIN TEMPORARY BLOCK 5632 LOT 022F �� aam Z
MEASURES. 1-40 UNION CROSS RE, LLC 3 ��� J
4. PLACE SANDBAGS IN STREAM TO CREATE DAM FOR BYPASS PUMPING. INSTALL PUMP AND ROUTE DISCHARGE PIPING CO TEMPORARY COIR,JUTE,OR BURLAP BAFFLES. 125 SOUTH ELM ST, UNIT 500 a (� O
TO SKIMMER BASINS. 4. REMOVE SILT/SEDIMENT FROM TEMPORARY BASINS AND TRAPS WHEN GREENSBORO, NC 27401 / Q
Pecan Ln SIt2
OD TEMPORARY EMERGENCY SPILLWAY. ACCUMULATED VOLUME HAS REACHED 50%OF CAPACITY. REMOVE ACCUMULATED °` / - U E
5. AFTER FLOW HAS BEEN DIVERTED FROM STREAM, BEGIN PIPE AND ENDWALL INSTALLATION. UNDERCUT UNSUITABLE SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH EXCEEDS PARCEL ID:6874-49-0242 oV T_ O
MATERIAL AS DIRECTED AND PLACE STONE FOUNDATION. OE TEMPORARY SKIMMER DEVICE. APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY.STABILIZE BLOCK 5632 LOT 167 J� Q 0� 2-1
AND MAINTAIN TEMPORARY DIVERSION BERMS AS REQUIRED. RESERVE AT SMITH CROSSING, LLC 0) O O �
6. PLACE STORM DRAIN PIPING AND COMPLETE ENDWALL CONSTRUCTION.BEGIN PLACEMENT OF FILL OVER PIPE. OF PROPOSED PRECAST CONCRETE ENDWALL. NCDOT POST OFFICE BOX 4088 40 U Z M U,
STANDARD 838.80. 5. DO NOT BEGIN REMOVAL OF TEMPORARY DEVICES UNTIL PERMANENT VEGETATIVE GREENSBORO, NC 27404 •� J 00 N
7. CONTINUE TO MAINTAIN SKIMMER BASINS AND DIVERSION BERMS. BERMS WILL REQUIRE RELOCATION AS FILL IS COVER IS ESTABLISHED AND UNTIL APPROVAL FROM EROSION CONTROL INSPECTOR. CONSTRUCTION MANAGER: PHONE:(336)382-4523 (D W -2 uj J � ,.
PLACED TO MAINTAIN DRAINAGE INTO SKIMMERS. OG TEMPORARY SANDBAG DAM. Q W � Q Q0
CHRIS PARR Z W w M�
TEMPORARY BYPASS SUCTION PIPE.
8. REMOVE SILT/SEDIMENT FROM TEMPORARY BASINS AND TRAPS WHEN ACCUMULATED VOLUME HAS REACHED 50%OF O email:Chris@parrinvestments.com U cn F-- Z C coj
H �
CAPACITY. REMOVE ACCUMULATED SILT/SEDIMENT FROM BEHIND TEMPORARY SEDIMENT FENCE WHEN DEPTH Z W O
EXCEEDS APPROXIMATELY 0.5'. REPAIR AND REPLACE SILT FENCE AS NECESSARY.STABILIZE AND MAINTAIN OI TEMPORARY BYPASS PUMP. ENGINEER/SURVEYOR: ALLIED DESIGN, INC. VICINITY MAP .� J o
TEMPORARY DIVERSION BERMS AS REQUIRED. 4720 KESTER MILL ROAD NOT TO SCALE j cN Z O X O_
JO TEMPORARY BYPASS DISCHARGE PIPE TO TEMPORARY WINSTON-SALEM, NC 27103 a U r-- § d
SKIMMER SEDIMENT BASIN#12. PHONE:(336)765-2377
FAX:(336)760-8886
OK TEMPORARY BYPASS PUMP DISCHARGE. STEVE CAUSEY, P.E.
email:scausey@allied-engsurv.com
■ I \ . 1 1 ` I OL TEMPORARY RIP-RAP OUTLET. PROVIDE 40'LONG PAD OF 1' ■
DEEP CLASS B RIP-RAP. I I 1 � \ 1 I I I
I ♦ V / II I \ � \ 1 I ► I = I / I ♦ 11 I I II I \ � \ 1 II
I I I / I ♦p I I I \ 1 1 1 I \ \ n \ I I I I I I M TEMPORARY RIP RAP OUTLET STABILIZATION PAD. SEE I I I / I O ♦ I I I \ I I I I \ \ \ ' I I I I II
I I / / ��� I ♦ I I I I \ 1 I I DETAIL SHEET. I / I ♦ \ 1 I I I I
l I I I \ 1 \, I I I I I I I I / ��e J��♦ I I ♦ I I � Il I I 1 I \ 1 \1
G II I I \ \ 1 \ I I I I I TEMPORARY 10'X10'CLASS"B"RIP RAP OUTLET I I I I Agvz I I / I I /I I I I \ \ , \ I I I I I >+°4'�`` Ro
I I I / ♦�O�Q, I I CO'`•i / ' I n II I I I I STABILIZATION PAD. H.! �,.•
I I ♦ 5� I �� / / //1 \1 \ ) „m \ I I `' e♦ I I lI \ � ! � \ I ► I - of
C� I I I I 1 I ♦ / / / 1 ��'� II Cfl
'( I ♦ // /� \ I III ♦ I / / �k \ I �
I I 1 r \ \ I ♦ O I / / i Off/ / /�° o \ I I I IIII I I \ r \ \ I ♦ O I / / mom, I I IIII L
I I \ 1 \ I ♦ O I / / / �Cb/ / /J�Q'"``' zm 1 / I I O I III I \ I / O l J=<v / n
I I I \ 1 �( / / o \ /I O I I I 701
a,� -
I I O \ 1 1 ♦ \ O \ �� �/� / �� / H I / /�°� � �� I � I I IIII I I � \ 1 I 1 ♦ \ O \ �/, / � // / �� � �\ I/m`�° I I �o�cC I III �, ?i
I \ 1 I \ / i / I / � ��w I I I I \ 1 0 c�' �.
I 11 moo: A ��1 / �, / m I � III I 1 w 1 \ 1 /� / 1' �� I �o I I s' ' !�G EE
Y
I I O \ , I I,�� \ � i \ I ♦♦o � \ /°v� I I I I 11 I I 1 I I O \ 1 ��II \ /// \ I /♦ T, \ III 1 I I �`�'��'£ M CPV�' °
$,
I 1 ��0� , A /� ♦ I V A \ I �m
Zwj�
I I � \ 1 ,�� 1 ����1 � _ / \ J , t� � ♦ I I , \ \ \• , I I \ 1 ��,I I ���1 1 / \ , t'C � / , I , \ \ \,
I I I 1 I ,�� \ \\\\\ I\ / ��: y O t♦ ► I 1 \ \\� \\ \ I I I 1 I Mom,
I I I 11 I 1 \ \ J\ \\\ \ l �,�
i""'
898; O
I I 1 \ \ \ \\ \ \ ♦ J \ I \ \ \ I I 1 \ \ \ \\ \ \ goo 1\ I \
1Q0 �' ' I \ \ \ \ \ I I I 1 ' ` \ ` 1\ 1 I ` \ \ \\ FIRM LICENSE C-1891
F JII � ' � 906
/ 1 \
JLu w
° ° °
\ 1 Q v �
w / ♦ I 1 I I I- I I \ J I
\ ° _
/ II I I � I III \ J '�♦ I I I I� I I' I I I l l \ I w Q Q
/ I I o \ �I 1LK4
U
l 1 / II I I -I-I �I � �♦ I-- � / I I I I - ,I I � O�B I / IIII I / IIc) U)
� � O � O
m / I I \ " -o � I - 0= O z
\ \ -0 I� / I / I o I / I 11 I V A 1U w
� I ' I (� zm 1 , \ \ 1 I I O JI � I ♦ I 1 -- O -
I 18 RCP 1 ♦ \15" RCP z 0
V �I \ \ \ • �1 I 1 \ s a D z Cl)
401 / I ` I I g 4 I \� �� - Lu
1 / / W � I I I I J \ \ \ J \ \ � Vt
o -� - 1 - - - L - - - - - - - - ` Cl)
I L - - - iW I 1 J \ `\ J=` B\� 1`\ \ I� �o L - -1 Rc 900 \ - - , \
I 1 Z 11 I I \ \ \ / �8.. I \ \ \
- - - - - - - I Io I I �� I J \ \\ \ ,\ \� \ , \ \ I � - - - - 1 I P \ 10 B \ \ I \ \
J I 1 I ♦ I \ \ I \ 1 \I
1 I Iw I I I B J \ F \\ 100 \ J� \ \ \J I 1 I I I � . \ \ \; N m U Lo
1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 0 1 sbPvc I 896 , , \ i Cy") Q
1 1 1 I 1 I . \OKI \ \ \ 1 I \ M Co
- - - - - - - - - - - - - - - 1 I I - o
1 I oI 1 \ 1 11 - - - - - - - - - - 1 1 I ♦ I I / / oo
1 1 1 j - - - - - - - - - - - - /o/ o / 1 1 �� 1 1 1 1 - - - - - - - - - 1 I N 1 1 II I / I l i /
1 1 I 1 1 I - - - - - - - - - - 1 1 1 1 1 1 I 1 I I�/ , o � ,/ 1 �I I I y/ o o/
1 1 1 1 1 1 1 1 1 1 / I I //
B o o /d / / / / -� o
z m o
E / y / \ �Im 1 1 I 1 1 1 1 1 1 1 1 II I / I I / / / / / / / / / / ` w Z LLI
Y
I � I 1 / \ T U Li
I �o/ 1 / I I 1 / // / 1 // 1 / \ JI ° = Q
1 1 1 1 1 EX SKIMMER BASIN 1 1 1 1 1 1 I \ --I I 1 I I I OI 1 I 1 I �� / \
D 11 \ T JIB 1 1 1 1 1 1 1 I 1 I 1105
/
------------1=-� 1_L L
1 1 1 1 1 l 1 1 1 1 1 1 1 1 I 1 ► ► I I I / / \ A \ SFT�SF ` \ �/ \ \\ =____�-�--r=�-�-�
I I I O I t t l
1 1 I 1 1 1 1 1 1 I 1 ► ► I I I / - ( `\ \ / �`\ ♦ C9 m �I i I 1 ; 1 i - _1=1_+ _1-1I 1 1 11 11 I II \\ \ / \\ 'y\ �
,( I 1 I I I I r l l l l l 1 1 I I III �I 1 1 I I
1 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 I I I I 1 A ° \ `\ / ` `\ � ` OO n1�\ O
1 111111 111111 1 I 1 I I ► I IIIII \ , \ / \ o 1111111 . , III 11 � I I
1 1 1 1 1 1 1 1 1 1 I 1 1 I I I 1 I I \ \ ► ` \ so• ` z o Of Of
Z w w
I I I I
I 1 1 1 1 1 1 1 1 1 1 1 1 1 I I N I ORED m I 1 1 I 1 1 1 I 1 1 1 I �1 I 1 I O m�j \ `\ ' ` 1` sTo°jsT I Z Z
I 1 I I ► v --r=t=-_- -_ _1 I w \ \ \ \ �a� D \ I - o
I I 1 1 1 I I I --__ I I I I o f ww I I I \ 1 \ v RFq e z U H
-' ; 1 �` 1 O �� I \ �R c o 0, of
I C� II �ml \ \ �. I > W W
w a
I 1 1 1 1 1 1 1 1 1 1 1 1 I m �' �W \ \ I I O 1 \ \ I I I I 11 1
I 1 1 1 1 1 1 1 1 1 1 1 1 1 m �o I moo► \ \ III I \ 1 \\ 30� ` � = 1 _ 1 1 �----- 1 1 1 � 1 olwl zw \ I I � I \ \ \
I 1 1 1 1 1 1 I O I I �1 I �o�c1 \ \ III I 1 \ 30,\ 0 0
I I I 1 1 I I I I 1 o I \ 1 \ \ RFq r� / I I I 1 1 - I I I I I I sTR'�lsr
_ sro/s \ I 1 1 g -�--r_ 1 11 m MN W W
1 1 1 1 1 1 1 1 1 1 1 I 1 I m 1 , \ I I I I RgEDI I ------- --- -- 1 I I \ Fq URe I >
1 1 1 1 1 1 1 I z l l 1 III \ R / 1 1 1 1 1 1 I I L 1 1 I ► 1 1 , \ I III \ ��"�,�F`R I , Co Cn
11 1 I I 1 1 1 1 m 11 j I 1 I I - ` , � / / '� I l I l 1 1 1 -------------�-+-�---- -}---_, 1 I I I , I I I \ .l
I 1 1 1 1 1 - - - - - - - - - - - ! 1 1 1 I 1 1 1 1 , I I I l r l , / / I 1 1 1 1 1 1 _ - = 1 1 11 11 l ' 1 1 11 I 1 ' ' `� I W
I 1 1 1 1 - - - - - - - - - - - - - � 1 I 1 � � 1 1 I I I I l / / / �I I 1 1 1 1 - -_ - J -�-� t--I 1 1 1 I 4 1 1 I I 1 I I / / // �I o N CD
N
1 1 1 - - CD
- - - - - - - - - - - 1 1 1 - � \ 1 1 I ' I I 11 ( / / h I 1 1 1 - - - - � T � - - - 7 �1 1 \ I I ' 1 I I \ ( / / h _
I� N
1 � \ I 11 I � � � � 1- I l `_ � � Q CO
STREAM CROSSING STAGE 1 EROSION CONTROL STREAM CROSSING STAGE 2 EROSION CONTROL
TEMPORARY SKIMMER SEDIMENT TEMPORARY SKIMMER SEDIMENT CREEK
BASIN #11 BASIN #12
DISTURBED AREA=0.26 AC DISTURBED AREA=0.17 AC CROSSING
DRAINAGE AREA=0.26 AC DRAINAGE AREA=0.17 AC
REQ'D VOLUME=3,600 CF REQ'D VOLUME=306 CF
Q10=CxlxA Q10=CxIxA EROSION
(0.25x5.5 IN/HRx0.26 AC)=0.4 (0.25x5.5 IN/HRx0.17 AC)=0.2
REQ'D SURFACE AREA=Q10x325= " REQ'D SURFACE AREA=Q10x325= "
0.4x325=130 SF 0.2x325=65 SF CONTROL PLAN
SURFACE AREA LENGTH=30' SURFACE AREA LENGTH=26'
SURFACE AREA WIDTH=15' SURFACE AREA WIDTH=11'
WEIR LENGTH=6' WEIR LENGTH=6'
BOTTOM OF BASIN=891.0 GRAPHIC SCALE BOTTOM OF BASIN=891.0 GRAPHIC SCALE SHEET
SURFACE AREA=893.0 SURFACE AREA=893.0
TOP OF DAM=894.0 20 0 10 20 40 80 TOP OF DAM=894.0 20 0 10 20 40 80
DEPTH OF STORAGE=2' DEPTH OF STORAGE=2'
SURFACE AREA PROVIDED=154 SF SURFACE AREA PROVIDED=69 SF C2 . 2
SURFACE AREA ELEVATION=891.0 SURFACE AREA ELEVATION=891.15
VOLUME PROVIDED=478 CF ( IN FEET ) VOLUME PROVIDED=324 CF ( IN FEET )
VOLUME ELEVATION=892.7 VOLUME ELEVATION=893.0
2"SKIMMER W/0.40"ORIFICE 1 inch = 20 ft. 2"SKIMMER W/0.35"ORIFICE 1 inch = 20 ft.
1 : 1
SITE DATA
OWNER/DEVELOPER: PARCEL ID:6874-29-9209 B//ox 9�e °gs
X / / �Gj� / /
CD / \ 'I BLOCK 5632 LOT 018Jh- b"
�Ooa M
- 1 J���C I PARCEL ID:6874-38-6720
IL I BLOCK 5632 LOT 166B d01 �o° o N
°PARCEL ID:6874-48-8564 Q
So/omon Dr
G
1 Q
U N I \ BLOCK 5632 LOT 022E am z
1-40 UNION CROSS RE, LLC 3
�'' I \ I I I � �125 SOUTH ELM ST, UNIT 500 go§'� GREENSBORO, NC 27401 Pecan Ln QE `
E
NEW ENDWALL - O _ o
\ PARCEL ID:6874-49 0242 c 0 2
BLOCK 5632 LOT 167 Q tY
W / ' J ~ �
00 1 / / h � I o I RESERVE AT SMITH CROSSING, LLC .0) 0 O
NEW STREAM CHANNEL. PosT OFFICE Box aoss 40
�r j� / / I GREENSBORO, NC 27404 O Z J N 10 0
Q I / I GRADE STREAM BOTTOM I I w a�
z°�„ TO PROVIDE SMOOTH, d
�0; \ I / J CONSTRUCTION MANAGER: PHONE:(336)382-4523 Q w � Q o
/ I LINEAR FLOW FROM / I CHRIS PARR
Z co
cow
OUTLET END OF FES OR email:chris@parrinvestments.com ti
U) Z co (o
00I 1 HEADWALL TO EXISTING / .Q� w Y 1 M
\ STREAM BED. o� ENGINEER/SURVEYOR: ALLIED DESIGN, INC. VICINITY MAP = J �
a 4720 KESTER MILL ROAD NOT TO SCALE >_ ti Z 0 cxo 0-
(ow:) WINSTON-SALEM, NC 27103 U I d LL �
PHONE:(336)765-2377
\ \ 898 O I Q OF / o /�Q FAX:(336)760-8886
� STEVE CAUSEY, P.E.
p email:scausey@allied-engsurv.com
I 50 0� Q
\ 00 \ 902 ° 9 .
\ 05 • O S/
00000,
\ \ \ 5° 05/ NEW TOP OF BANK. � _���
\ 1 \ \ / GRADE TOP OF BANK TO L r'
\ / ° 00000
s° g���P / TIE TO NEW CONCRETE 701 A 1�
FES OR ENDWALL. e.$ �
S° �\ °s _ r,s��N�I NEED.
s u�001*
RESTORE STREAM BANK TO
906 ,,d £a CP�s;,
I � \ � ORIGINAL PROFILE AND 0° DIMENSIONS. MATCH
a A 40000 GRADES/SECTION OF STREAM
8 a I \ \ ' ° a a a 0 05 IMMEDIATELY DOWNSTREAM.
a
4 g
I - FIRM LICENSE C-1891
404 ` I PROPOSED FINISHED GRADE N
I \ I
I I STRE M IMPA T=147 LF w Q
I (HEAD LL 101 TO END I I - I I ` NEW ENDWALL
� Z
II OF RIP RA OU LET PAD) -/ I ` I ` NEW TOP OF BANK Q U Q
I I
SOLOMON DR ADJACENT TO ENDWALL. / = J Q
c6 PUBLIC R W) ' GRADE TOP OF BANK TO /
'� I TIE TO NEW ENDWALL. Lu QQ U
U)
O �
I I I I � 72" RCP I U) CU �
I I I \ 11a� Co z "ILu
J p z J
Co RESTORE STREAM BANK Z Q
403 >
` \ / O MATCH AND U Z) j U)
15
I 18" RCP � � \ O
" RCP EX TOP OF DIMENSIONS.
BANK GRADES/SECTION OF IT LLI
STREAM IMMEDIATELY �
DOWNSTREAM. — LLI
a \ a \ EX INTERMITTENT STREAM Y
ZA I I a Cn
STREAMBANK RESTORATION DETAIL
NTS
904 \ \ N m U L0
\ \ o N
\ \ `
m
RCP 900 zU m o
\ \ \ w z Li
I I \ o w
� 0 U 0
m o I
6" SCH 40 PVC 03 \ 4 d
a W W
/ COI 4
I I I , Z W W
O ,O � � �
/ / / ~ zz
I / O O J / d Q d z � zz
Z �
I I � � H
CoW �
/ O Cl-
0 `O / / ' 9� Lu a s
I I y O / O / 4 a d 0 0
d
Lu Lu
4 CoCn
I d
'-00`S mJ
i
O� 4 JQ 4 4 � 7 CO
I Q77
I d e Co ON
rc")e
O 1 4 4 72" RCP CD
J .' Z Q m
4 4 24 FLOW / 4 4
CLASS B RIP RAP
EX STREAM BED -0 FLOW
-1/14 v 4
12" 12" CREEK
CROSSING
00
00000,
d p oo°000°
li III d• 0000 0 0
o 0 o •0 0 0 • 0 0 0 0 o DETAILS
° 0000 o000
III—III—III—I I III—III—III—III— I I—III—III—III—III— —III—III—III—III—III—000°°°°°°°° . °°°°°°°
GRAPHIC SCALE CLASS II RIP-RAP FILTER FABRIC 00000000000°000° SHEET
TO FILL VOIDS 00000000000000 #57 WASHED STONE
10 0 5 10 20 40
PIPE OUTLET STABILIZATION DETAIL C2
NTS . 3
( IN FEET
1 inch = 10 ft.
1 : 1