Loading...
HomeMy WebLinkAboutNCG140344 - DMR SW ST#, . . 4 ATER r'I ISCHA1 GE OUTFALL (SDS) m Semi k • ' ua, M]TO NG F ! R I GENERAL PERi IT NOe `iCG14O000 CERTIFICATE OF C�S-VERAGE NO. I CG-14.-0 n: =q-.1.9:4 SAMPLE COLLECTION YEAR: aO \�p FACILITY NAME: L thiS,PyCacQ�j •�l.l�ICXP/S S�, �,\y a-nc SAMPLIN ER`IOD: '�P �,;B O �' erriber January-June PERSON COLLECTING SAMPLES COUNTY C�T�S6c1 CERTIFIED LA,:,ORATORY Lab# PHONE NO. (011() (0D-6— i Lab# ADD TO LISTSERVE? OYES ONOEMAIL: OPTIONAL INFO: • DISCHARGING TO CLASS: OSA I IHQW I IPNA I ITrout Other Part A:Stormwater Monitoring Requirements , Date Sample In Tier 2 Collected pH Event Total TSS4 Monthly #of Months in Tier Outfall No. (Standard Duration Rainfall (mo/dd/yr OR (mg/L) Monitoring? 2 Sampling2 NO FLOW)' Units) (minutes) (in) (y/n) - - 5-92 1002,3 - - - - RFeeNED *-no-_law-i 30 0 2017 CENTRAL FILES R SECT" • ' If"NO FLOW"or"NO DISCHARGE, Enter"NO FLOW"or"NO DISCHARGE"for each outfall here Please make sure to mark the sample period above. 2 If a value is in excess of the benchmark,or outside the benchmark range (for pH),you must implement the Tier 1 or Tier 2 responses in the General Permit.Tier 2 Monthly sampling shall be done until 3 consecutive samples are below the benchmark or within the benchmark range 3 TSS benchmark values are 100 mg/I, except when discharging to ORW, HQW,Trout,and PNA waters where they are 50 mg/I 4 For each sampled measurable storm event the total precipitation must be recorded using data from an on-site rain gauge Permit Date:7/1/2011-60/30/2015 Last Revised 7/13/11 Page 1 of 2 Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using>55 gal of new motor oil/month—averaged over a calendar year. In Tier 2 pH TPH using method Total Suspended Event Total New Motor Oil #of Months Outfall Date Samplea Monthly No. Collected (Standard 1664A SGT-HEN! Solids Duration Rainfall Usage in Tier 2 Units) (mg/L) (mg/L) (minutes) (in) (gal/month) Monitoring. Samplingz (mo/dd/yr)1 (y/n) ' 6-92 152 1002'3 - - - - - HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL(INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO ❑ HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT-NAME• Mail Original and one copy of this DMR (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring period in case of"No Flow")to: , Division of Water Quality Attn• DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance wit-I9 a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is,to the best of my knowledge and belief,true, accurate, and complete. I am aw:. .t there .re significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (S':nature of Permittee) (Date) Permit Date. 7/1/2011-60/30/2015 Last Revised 7/13/11 Page 2 of 2