HomeMy WebLinkAbout20170187 Ver 1_400108_hyd_prm_wet_package_20170214�� �^��f�y:ti.���, North Carolina Department of Transportation St�lt �z7�Vi�t�Y Highway Stormwater Program � �� e STORMWATER MANAGEMENT PLAN __ (Version 2.06; Released June 2016) FOR NCDOT PROJECTS WBS Element: 17BP.7.R.89 TIP No.: SF-400108 County(ies): Guilford Page 1 of 1 General Project Information WBS Element: 17BP.7.R.89 TIP Number: SF-400108 Project Type: Bridge Replacement Date: 7/19/2016 NCDOT Contact: Matthew Lauffer, PE Contractor / Designer: David Fuh, PE Address: NCDOT Hydraulics Unit Address: ICA Engineering, Inc. 1590 Mail Services Unit 5121 Kingdom Way, Suite 100 Raleigh, NC 27560 Raleigh, NC 27607 Phone: (919) 707-6703 Phone: (919) 900-1612 Email: mslauffer@ncdot.gov Email: david.fuh@hdrinc.com City/Town: Oak Ridge County(ies): Guilford River Basin(s): Cape Fear CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 850 feet (0.161 miles) Surrounding Land Use: Low Residential, wooded Proposed Project Existing Site Project Built-Upon Area (ac.) 0.6 ac. 0.4 ac. Typical Cross Section Description: Linville Road (SR 2022): 2 paved lanes (total 24' wide), 6' shoulder on each side (9' with Linville Road (SR 2022): open shoulder section, 2 paved lane (total 21' wide); guardrail). The first 4' of shoulder is paved. Annual Avg Daily Traffic (veh/hr/day): Design/Future: 2200 Year: 2025 Existing: 1100 Year: 2011 General Project Narrative: The North Carolina Department of Transportation (NCDOT) has proposed to replace Guilford County Bridge #400108 on Linville Road (SR 2022) over Haw River. The existing (Description of Minimization of Water structure is a three span bridge (1 @18', 1@17.2', 1@17.4') and is timber deck on timber joists supported by timber caps, timber piles and timber bulkheads. The proposed Quality Impacts) structure is a Single Span 24" Cored Slab with 4' Deep Caps, 1@70'. This structure has been designed to have as little environmental, wetland, and surface water impacts as possible. 2:1 roadway fill slope will be used in the wetland area to minimize wetland impacts. To avoid direct discharge of bridge storm water into the receiving water, deck drains are not required for the proposed bridge. Storm water impacts to the stream have been minimized by utilizing grated inlet and pipe to collect bridge storm water and use rip rap outlet protection at 14+25 LT to dissipate energy to provide a diffuse flow (non-erosive sheet flow) in a wooded area. This diffuse flow will run for a distance of 10'+/- and 40'+/- before entering the wetland and buffer respectively. At the same (NW) quadrant, an existing roadside ditch has outlet at 13+30 LT and becomes diffuse flow. This diffuse flow runs for a distance of 70'+/- and 100'+/- before reaching the wetland and buffer zone 2 respectively . This ditch will be retained and lined with toe protection along the fill slope. At SW quadrant, an existing roadside ditch has outlet at 11+50 RT and will run for 60'+/- and 90'+/- as diffuse flow before entering the wetland and buffer zone 2 respectively. This ditch will be retained and lined with toe protection along the fill slope. At the NE and SE quadrants, there are no roadside ditches. The roadway is fill section and runoff discharges as sheet flow off the pavement through grassed shoulder and fill slope or wooded area to remove pollutants via infiltration and settling before entering the buffer on each side of the road. At all four quadrants, there are no proposed roadside ditches with concentrated flows or proposed stormwater conveyances through the buffers. Due to the nature of low impact bridge replacement, the increases in stormwater discharges (post vs pre condition) are insignificant and the existing ditches do not need to be modified. Therefore, additional stormwater measures are not required. Waterbody Information Surface Water Body (1): Haw River NCDWR Stream Index No.: 16-(1)a NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply V(WS-V) Supplemental Classification: Nutrient Sensitive Waters (NSW) None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: Buffer Rules in Effect: Jordan Lake Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? No Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) � �. rU� � • � � V W � O � � � � • � � V � � O V DESIGN DATA ADT 2011 — 1100 ADT 2025 = 2200 V = 45 MPH SUB REGIONAL TIER LOCAL � " I ' . �� " I ' I : (�> I � \ (�) I'� " i ' I-I � � . �1 I'� (�)1. I \ . �� ll)l ��l�l(�)\ (�)I� I-I l� il-1 �\�.�� 1-� G UILFORD CO U1�lTY LOCATION: BRIDGE NO. 108 OVER HAW RIVER ON SR 2022 (LINVILLE ROAD) TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE ,' , ,,, � � ��., ,--- , . — ,s` �' 'OJECT fi/BP.7.R.89 � Sta.12+00.00 �'' ' � (�►� ��>> �. I"�� I .; '�_ A t � � � �__ t --. . ,� ., . � BEGIN BRIOGE �� —L— Sia. +85 2 i i1 r � � . � � � � � _ — —n.\ � —L— �, �s _.—,�--,,,��. Y � BEGI APPROACH SCA6 � —L— 57a. /4+73D0 . � i � E D PROJECT l7BP.7RB9 1's ' `, —L— POT Sta. lB+OOAO � \ / � � �� ( � �\ �� x � � \ _---�1°---- x � ,_ * � a Y —_1 � � � �---___ � -----�"—= — ------' ---�u-------- � i -- ------� --- TO OAK RIDGE RD. _ � B� � I - I.> .I" - . I' :'!' 0- . — -- —�--------- ---�.-- _, � * E D ?PPROACH SLAB ` � \ � � —L— Sta.l5i67.00 � i ND BR/DGE * � _ _ SFa. 5 � * I WETLAND AND SURFACE WATER IMPACTS PERMIT PROJECT LENGTH LENGTH ROADWAY TIP PROJECT = 0.101 MILES LENGTH STRUCTURE TIP PROJECT = 0.013 MILES TOTAL LENGTH TIP PROJECT = 0.114 MILES Prepare0 !n the Office of Halch Molt MacDoiwlO for w DIVISI0111 7 NORTH CAROL/NA DEPARTMENT OF TRANSPORTAT70N 2012 STANDARD SPECIF7CATlONS TIMR EORDANRPE LETTING DATE: DAVID FUH PE HYDItAULICS ENGMEEX NCDOT CONTACT: TIM POWERS, PE OIVLSION BR[DGE PROGRAM MANAGGR ROADWAY DESIGN ENGINEER HI'DRAULICS ENGINEER PERMIT DRAWING SHEET 1 OF 7 GLI I�T `�O�IPL�E PLA�T� yo u� �/w ebno�emav PLANS PREPARED BY.• � Hatch Mott �� MacDonald PO Box 700 Fuquay-Varina, NC 27526 (919)552-2253 (919)552-2254 (Fax) wWw.hatchmott.com LICENSE NO. F-0669 � � i121 Kingdom Way� swce i o0 Italeigh, NC 27607 u���a�e�.�o ���o_-�� Engineering � \ �/ � \ \� \ O � �� /- 7 � � � I `���-.,.. � � \ I I �� I ��� \� '<�_-- I I � � �� � / � I / � \ \ �\ ! � _ , � J � �,\ �\ � �� (b � o �\ � � l / / ��� ,�� �•, \ + � I � �'��`3*\, � � ��� _� i i I I ai l � ' / ' / � / �'�' /� �I�11 �I�I��il� �� �i\��� --- -__- _ \ � � I I I � I l I � I I l� I// � / i � / / / I 1 � III I I11 - ,� I � � I I I � I l I � I l l� I l/ � / / / �O � � / i /� � I�l/ ��I ll � ��_- __ - / I I � // / l l/ l I I I I 1 I � 855- __ / I I I � i 1 i � i i l�� i / �� �� �, b �� / �� �� i i ���i ��i i�il� I I����� I � ` ___ � i � � i i � i i r i� i �� ����� � � ����a � � i �','�, ,�� ��','� �;�____— ', �;,� ; 5� I � � I I I I I I I / � / � / � � � / I I II Icoll � � __ ___ \ \ , �a � / l/ /� �/� l I���� IIII Icn\��� �INVI�LE �OAK D(iE LL�C I l I �v i�� � y � � �� � � � � � I � � � A � - � - � � � � � � - � I I I I I I I I l/ b / �,�C'���/� � l��l� _ � I � I I � I I I � I I I � �\ O I' l �- /'�, ; II � \ - � �� -- � � � � I I i I I I i i I� I / ti � �� � - � - - - � � / � I / 'l' i m , /� � + �W ��� „` — _—_ ;� � � I I I I I � I � I � I � � i I' , i i�� �' I `: --- `- � \ S�\\�-----� I I //� � ,,, ��a �,\ ,� _ y -�= Po� �0'8+5� � ��,��,�', ; ; ,�°'�p��' ��', '�'� � /�'�('/,�y.y�� WETLAND AND SURFACE WATER IMPACTS PERMIT �e9�,;; ____.;_�� - / ' -L/ � � � I I��m � � /,�/'``�� �G� � � � �" G�� ��-� �d� �� � I I I 1 I � Iro I/� I_,R=O � I�� � 3 V� 6 � . T� � i __ � 7 '`../ - I I � I � I I l�a I I�Qz- � I I ��� � � --� �\ ,�� � �\ � i i i i� i � i i �� �� 835-- i `k�� + i�\\� 1 I I�I� I � IQ•��N � ``I� � \� \ � �--/ �-� \�� � \� � I� I 1 I � � � � I� � � 1� \ �� -- �♦ � � I I I � I Y I � I �� � � � S � ���` 1 \ � � ��\\ � II � � I � � � \ � � � �\--- _ // \ i� �� \ /� . � 1 I \ \\ \ � 11 ' � I I I � � \\ \ � � � �� 6� � � � � ° 1 � � � V � �1 � �� I � � �� � � - - - - - � �\� � � s�},�� �I � 1\� \\ � � � �� j�FFERy p, HANKS \ 1 . \ � � � � \� `- /,/� \ � \ ��'Oq�� I �/ \ � � � � &� SIJSAN H. HAFIKS � ?e � ,,-------- , \ � . �p830\ ,4�,r1 ,/� � � � � � iL \ \ � \ � � \\� ---- \ F � � Y � / � I I ExISTING DIT(jH ENOS HE� � � �� � N' � ANb BEC�OME�DIFFUSE FLOW � I `QEGIA PROJECT C/8�.� --� � � ` ' i l � �a�o- a.� ��r' � � � —L—�Rlli-5't0. 9t50� — — — — — — ;� , � �� — _ � . I t4�"usvio � i.��'Ps �F3eN-Easovie� �\ � I � � - � - I 70¢ PRQ T'ECTION � � � IP� ��,, � SEE �DETP�IL A � \ \ � i / / - _ - _ -� _ _ _ \ ' \ � \ / '� I EST. 245 SY PSRM � � � '�, �'� , ,-- -- �,��r a � � , - , Q,o�o_� � _�_ � \ l � � V10=A7�f{ \ � i / '�' � \ � � \ �S � �� � � \ � I�'�QN_EItL � � � � .i � � � ., �R !�, C., < �� � �� � i / �� � � � fb� qd, � �':� \ �� � � � � - � \ � � � � T�LnPMO7ECTION � � � � - �� � _ EIP ..... ` pUE �E�i � � ` � � � SEE`C�'ETAIL B _ - - � � �GIN i �� �� \� / �� EST.55 TONS 61P-iFA� �`_ � � \ � � ��� \ �LT \ � / EST. �15-SY GEOTEXTILE - � � -��. � � / � � \ ` � -- -_ \ \� � \\ ���_--,����' � �� �� `� \ �� \ \ � � � ��� � �� '�� � � �� � � � �_ � � � _ � �\�\\�\�����\��� - _� ��������\�\_ _�� � �\ � _ \\ \ �\ \ � � �� � \ -_ _ ��\�� \� �\� ��. � �--- �. _-�� � � �� �� \ \�� \� \ �� �� \ �\�\� � __--�� �� �\B.?� � eq0�� � �� �� / �--__ �� �\ \� � \\� � � �� ��'830-_ �� \�� � S�� \�� �� ��- __ � , �� � ��� , ��� � � � � � � � � � --_, -• ` , � � � � Q - � / � / / '� �,5� \ � � \� � � \ \�\ e2S ��\�� �� \� �\� \�� � � \� � �\� N - � _ _ l / 11 �gEA�ERdH�/f / / � � \ \ � � � � � � � � � � � � � - - _ _ _ _ - � I� "/ I\� �� \/ \\1 \� ea��� � \\� �\���\ � � \\ \\ \\��\�\ __ ----a35- � i ((� � � � � r•' � i � � ` � �� � � � � �� Ci PRfiJ€C7` BP,ZJ?aB9� � ,� _ - - - - - - � � � °' � � \ � \�' \ � � ` ` \ -L-� o: l � - _ _ ' ESi52 TON$IR4P � li i / �/ /� C445511RIP RAP � ) � �� \ �\\� \\ \� & \ �\\8�� _""_---- \ / / ¢ I / UP TO ELEV. 822.0 (� YP. \ \ � � \ \ \ � \ 30 ` EST. � SV y'iEOTE%TILE � � 1�\ � � � �ppUCTURE PAY ITEM( � \ � � \ � � � - � � - - - - - � � � ,' i ����� � �; ,� � � � a � � * �� � �� `� � ` - � �PC � .%9f&�50- _ _ _ _ _ �..-��,��- � � . � � j \ �� \ e\ � \�� � �� \��, �, -_ � � � ,� � I � �/ /� (� � \ � \ ` ` � � � \ \ � � � \ \ � � � � — � s _� iu�,��n,� i1�� � � �\ � --, \ � �—� � , '-- �_ m`� !�ii i�i� ii � �� �� � _ �� � �'� \—'-- ��� �� !:/��/., I�I�� � ,��.,_ ,� � ) � - `� Acei � _ ��� ��� _ >`�l� / I I I -� _ � / �, - ''!_ � l � PROIECT REFERENCE SHEET NO. 176P.7.R.89 - GUILFORD 108 4 ROADWAY �ESIGN HYDRAULICS ENGINEER ENGINEER [�T��viFL�E PLA�T� DO NOT I7d@ ROR W A(3UV181TtON MOTf MACDONAL� 18 E, LLC I LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Offi e oE �n t e M M Po ao. �oo MOTi F a,NC 2'I526 nCooHntn .�om 1�� .� ., Engineering VERTICAL SCALE HORIZONTAL SCALE Y. 0 5' 10' 25' . 0 25' . PERMIT DRAWING SHEET 3 OF 7 .� 1 ,� � .�� ' �, � - , . _ _ � �'��� �' ,��� �f��j I ��. / � / _ ��_� �: � - � � � \ \ ,\ � - - _ - _ _ �_ _ / � _ _ �2$ ` \ ' / EkISTING UITCN ENDS HERE- - - �` E � � � - _ - - _ . . _.. _.-.-. __ . /AND BP�COMES DIFFJISEFCOW _ _;\� � � � � � — ��\ \ ��� i� / Q10=�3.5 fs�� - ,- � F� _ � _ -_- ___� � � . � � � \ " V10� 1.5 F� (NON-ERSOVIE%"� _, _ _ � $c� �. .� � �� � � / � ���� _ ,.r -- _ �-- _-- 1 ' � � / � i � � � � - � � ' . i � � --'�/ �� i �� �,F'0��' Nte� ,� � �2�`�fte' -__�= -- --, _- � � � , � � � _� J s \dS� il c.,n /- � - - - _ _ --- � i � I \ /^ � _ , / // � `---________ �`•� BZ i�� _ _ _" �_ i Ri� I � r ^ - � i / � - �- - -820- - - � \�Z --- � `�� - '3� � � � / / � _ � I ' I // // �_��\\\\ __ � -__i � �/ �i�/ /i�/��/ S�VA�/P ����� � i" , — ' ,' � � � � _\\ � � �// -�� �� BRC RIVERSIDE LLC N� � _ / / ( i \ � _. _ \.�.. ,� i� `; '-�s� � � �I � � � ! 0 i I I / / � � / � � Ai '� \ / / /� \\ � � � � �,�OO��� O � �v� �,, �v��uP � � \ \ � � \ ,�� ��SEE ENLARL�ED � �� 50 100 ;(�REA ON � — ,' SCALEe I"= 100' HORIZ, Iv��XT SHEET `� , i �� � '� ----�---- ����������� ������ ; ;, I�� ,���������� �����.►,'������ ii'�������■■■ ■■■■■r�fiii���� 9 10 11 PI = 12+40.� EL = 824.11' VC = 330' K = im �������� 12 13 _'-..__ _ _. ..._ -.�, .�_-, . .. � .¢ - _ - - - -� - - �_ � _ _ / T- EJP � ��� iG� � �� � - _— � _ _ I � � � / �d /� /� _ - \ - - - - � � - —_L—� / � Kji —�---_-- i / � Pi�4 � � _ — ---- -- - - - — -lLr , ' uNv�c[F � � ���� � � ' ��g� ii � � — ---- =— S "I�5'E'sRzozz zresr_ �__�=T� ' — � � �-\// --- --_ _- -- _IY�e ���____ �������'/, ��' /•=�/rtilf`-'��,OPEiP�685 /���L/�� �� Zi' � � i � � -�. 5.. �'�_n'�i�:= � �' 1�-t. _,.�, y„_ '.�!3 <�,�., ;, �-r�.+���"%�'� i � � `� � �' i i i � � � / PDE_ _ . Z ... �� - _ � 1 � � � � � � � � � i � / / � I � / / 1- \ �\ \� \ \ ) / / / / / � � � / / / + I 1 I1 I BZ 1 I � � � � �` /� \ �`I � I \ \ � �� / / J /r ' �( / � / J � � � � � � i 1 � � 1 1 �� � S \� J'�� \ ��i \� \��� (� \ /� � �� � � � � � ��P 1 � �_ SITE 1 , e2 �aZ ��_ ��_ �� �� : � �� � `8 � � � 1I �� ��� i � 1� � \ \� ��\� \��3�� ... i � �� �_- � � ��� � �\ 1���\ � ��� LEGEND \ � �� �`�. � 1 � �� �\ �� ��� \ \� \ \� \ l \825� � \ \ \ \ � � � � DENWETLANDLL IN � I / \ � � m l � �\�\ ��� �� �� W , , , �. . , , , Z � � � � / � � e � � � � � \ � � � � � � � � � � DENOTES TEMPORARY � � � � SWM/P � � _�, / � N� � I � � � � � � � � � IMPACTS IN SURFACE WATER Z I � / l / / \ \ \ � I \ � \ � � \ � � \ � � � / \ �I� � � � � � � � � DENOTES HAND �� �. d v ���gRp // � � � � `\ � CLEARING ��} x �I D�V� � � i / � � , ,��']�l� ]� � � � , _ , . , � � � ,� �, ' � 14 15 ������ � •; • ■ ���������� ����I ' : ''� �, ��� ����`����I � ' „ �����,mr� � �__J■■■��� ■���■�I.��■■I ����i����s� ���i�ii�■■I i�■�■■■■■I ����■■■■■' ����■■■■■' ■■■■■■■■■' ■■■ %'/�/%. ����' . BR/DGE HYDRAUL/C DATA DES/GN DISCHAftGE _ 1800 CFS DESI�Iy FREQUEIyCY = 25 YRS — DESI�N MN ELEVAT/ON = 820.9 Fi _- BASE �ISCHAR�E = 3000 CFS BASE FREQUEN�1' _ lQO YRS BASE HW ELEVAT/ON = 82324 FT OVERT�PP/N� D/SCHARGE = 350Q CFS OVERTOPP/NG FREQUENCY = �00+ YRS OVERTOPPING ELEVAT/ON = 823.8 fT DATE OF SURVEY WS. ELEyATIOA/ AT DATE OF SURVEY = 3-02-20/6 = 8/87 fT WETLAND AND SURFACE WATER IMPACTS PERMIT LEGEND � DENOTES FILL IN WETLAND � DENOTES HAND CLEARING � DENOTES EXCAVATION IN WETLAND j�'� ,/'Q PROJECT REFERENCE SHEET NO. �� � I 1 ��� 1 V ' ROADNG N D SUGN RD 108 HENGINEERS ���� .JS J� �Y �J �b,� �T�O�IPLE�E PLA�T� DO NOT li9B FOA W AfMQI�ITiON MOTf MACOONALO 18 E, LlC I LICENSE NO. F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALl SIGNATURES CO`�APLETED repare n 1 e Office of: M M Pa aa, ,00 MAWONPLG wUvm.m ��moc�com �)526 1����;;��i�...,. _ Engineering PERMIT DRAWING SHEET 4 OF 7 iCaf r�i ic° 30 0 �������� 15 30 ���� ���� SCALEa I"= 30' HORIZo �][�]� ]� WETLAND AND SURFACE WATER IMPACTS PERMIT LEGEND � DENOTES FILL IN WETLAND � DENOTES HAND CLEARING � DENOTES EXCAVATION IN WETLAND j�'� ,/'Q PROJECT REFERENCE SHEET NO. �� � I 1 ��� 1 V ' ROADNG N D SUGN RD 108 HENGINEERS ���� .JS J� �Y �J �b,� �T�O�IPLE�E PLA�T� DO NOT li9B FOA W AfMQI�ITiON MOTf MACOONALO 18 E, LlC I LICENSE NO. F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALl SIGNATURES CO`�APLETED repare n 1 e Office of: M M Pa aa, ,00 MAWONPLG wUvm.m ��moc�com �)526 1����;;��i�...,. _ Engineering PERMIT DRAWING SHEET 5 OF 7 iCaf r�i ic° 30 0 �������� 15 30 ���� ���� SCALEa I"= 30' HORIZo �][�]� ]� � W5 �a PROJECT REFERENCE SHEET NO. �11W 17BP.7.R.89 - GUILFORD 108 X-4 � P LI I�T RY FL �T$ rror eo obn I�T LE E LA $ AO OT AOA /W ON � GLI PERMIT DRAWING SHEET 6 OF 7 SITE 1 0.02 009 1.� � 82 .03 � 1: � � 16 + 0. 0 , � , 0 , a , � , � , � 0 0 20 , , 2 , � , � , � , � , � , � � rn v a E� a v� � L �I O O O V � C 3 a 0 a � d E G O .) C NI H � K 1 .j O � _ K WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) SINGLE SPAN 24" CORED 1 -L- 13+93 to 19+91 SLAB W/4.0' DEEP CAPS, 0.02 < 0.01 0.29 1 70' TOTALS*: 0.02 < 0.01 0.29 *Rounded totals are sum of actual impacts NOTES: 2013 10 24 � �. • � � V W � O � � � � rU� � DESIGN DATA ADT 2011 — 1100 ADT 2025 = 2200 V = 45 MPH SUB REGIONAL TIER LOCAL � " I ' . �� " I ' I : (�> I � \ (�) I'� " i ' I-I � � . �1 I'� (�)1. I \ . �� ll)l ��l�l(�)\ (�)I� I-I l� il-1 �\�.�� 1-� G UILFORD CO U1�lTY LOCATION: BRIDGE NO. 108 OVER HAW RIVER ON SR 2022 (LINVILLE ROAD) TYPE OF WORK: GRADING, PAVING, DRAINAGE AND STRUCTURE ,' , ,,, '�, "',—, ,f` OJECT fi/BP.7.R.89 � Sta.12+00.00 � �'' ' � (�►� ��>> �. I"�� I .; '�_ A t � � � �__ t --. . ,� ., . � BEGIN BRIOGE �� —L— Sia. +85 i � Y I I � � . � � . � � � . � —L— � �' ,s—_. � ��__,.�" Y � BEGI APPROACH SCA6 � —L— 57a. /4+73D0 . � i � E D PROJECT l7BP.7RB9 1's ' `, —L— POT Sta. lB+OOAO � \ / Y * �� � / / � �� � I . "Y---- � * � _ \«��--- *—__---� "� � --`— — � l � —"-- —�---- '---' � --- TO OAK RIDGE RD. _ . � B� � I I:> .I" - . I' :'!' 0- � —�— -- -- —�.-- L,=,��, _`\\� \ �a, �, * E D ?PPROACH SLAB\\ ` � \ � � —L— Sta.l5i67.00 � i ND BR/DGE * � _ _ SFa. 5 � * I BUFFER IMPACTS PERMIT PROJECT LENGTH LENGTH ROADWAY TIP PROJECT = 0.101 MILES LENGTH STRUCTURE TIP PROJECT = 0.013 MILES TOTAL LENGTH TIP PROJECT = 0.114 MILES Prepare0 !n the Office of Halch Moft MacDoiwle for w DIVISI0111 7 NORTH CAROL/NA DEPARTMENT OF TRANSPORTAT70N 2012 STANDARD SPECIF7CATlONS TIMR EORDANRPE LETTING DATE: DAVID FUH PE HYDItAULICS ENGMEEX NCDOT CONTACT: TIM POWERS, PE OIVLSION BR[DGE PROGRAM MANAGGR ROADWAY DESIGN ENGINEER HI'DRAULICS ENGINEER PERMIT DRAWING SHEET 1 OF 7 GLI I�T `�O�IPL�E PLA�T� yo u� �/w ebno�emav PLANS PREPARED BY.• � Hatch Mott �� MacDonald PO Box 700 Fuquay-Varina, NC 27526 (919)552-2253 (919)552-2254 (Fax) wWw.hatchmott.com LICENSE NO. F-0669 � � i121 Kingdom Way� swce i o0 Italeigh, NC 27607 u���a�e�.�o ���o_-�� Engineering � � \ \ \ ' � � � ' oj / " / � / � / / � I I 1 I � I I . � ' ' ' , , , - - - - - - - - ' _ � ' � ' PROJECT REFERENCE I � � � � � � 1 I � 1 I/ I I I l l// / � � � � /� � i� 1 1 �I I �I II III II� �� O��/ �- i � � � i � I I i I � i l i � i i l� i i i �� � i / �0� � i � � � i � �/ / 1 � I� I i 1 i� � nee.�.R.av - �uaFoeo ioe I li I i � �`---- �` . 1 \ I I � I I / I I I l �� / 6- � � // / �/ �// l ll � l� l� � I I I �11 \\ '855-_ � i�\��� ROADWAY �ESIGN r ��`�� I \ I I I I � �/ c. / / // ll l 1 I � �_- � � �'�. \ I I I I I I I I I I I I I I l� / � / / / / ��� // I� 1 I I I 1\ _ \ �\ _a5 ENGINEER �� '� _--I � I � � � I I � / / / / / l 1� � I I I I I�l A � ' � y� � I I I� I � I � I I l I � / 8 � � // / � /� 1 I I I �A \ ��� 1\ � � � I 1 / I � l //��/ l I I �---___-`�� ��\��� ��- \� \ �; � i i i i � i i i � (((i i� � oy i �i i i� ii i i i�iiiii`����� ,, ___ �V I l I N � 1��/�� l l� I '- i "� \.�\ � q \ _ , 1 � / �INVI�LE PAK�D(iE �LC I /� / I I ` ! � I / cn l � l I I 1 _ _ - - - - � � � � � _ . � \ � � � � � I � I � I I l//• / I/ i � � �/�/q��/ l� I Ill\\\ \� ����� ��� � � I I I � I 1 I I A� I � 1 , � � I � 1/ l� � � w / �1 I I I 1 AAA� � ----- �� � �i4 � �----- �� I I I I I I � � I t pI� l � 1� I I �\ � � � S� � i� ��e � �] � ���i I � I I I � I I � I I I/j �� I � � I I I � l l l� / I 1 � �1 � lA AA� ------ � '----� � � \�;_.�.,� \t � I � I � � I� I I I � I � I I I m I �/ � � I I � I I l� � �� � ��� � 1 1I l���� _-------� �\� �__-� � � i i i � � i i i � � �` ------- �� �. , I�T�O�LPL ] , ,,� � ; , ���_� , � � , , � , � � � �o'� �� ��� ', � � � /��" BUFFER IMPACTS PERMIT "'� � � �'� �' �' � � , �� ,� .,�;:_ ________ �e : ` ----;- m���R 1 I I I I I I,y� I v � ,( I I I 1� I I � � 9 � SHEET NO. 4 HYDRAULICS ENGINEER PLA�Tg ebuv�risonr _ — _ / / � \ � \. ! ...�� �. ,; \ C � j � � � II I1 � I � � � I �4'S � � !� � � � � ��v5y � �. 1 \ \ \ \ � ` _'� 8 4 0__— — _ _ \ \ \\ � � � � � \ _ _ - = i ' /%' / 1 I� I� 1�\\1\ 1� 1�1�1\1�\ \\ \�S� � �\ � � �� � \� / MOTfLCENSE�NOLOFI0669�LLC � � � � � � � � � � � �� � � � � � � � � � � � � � � � � � � � � � � � � � � � DOCUMENT NOT CONSIDERED FINAL `° � \ � � + � I � � I I I � I i d I I � � I I I I,� � � � � ; � � \� \\ � \\ \ �\ \ � � �\ � � � \ � � \ \ \ � \ \\ \ \ \ ' UNLESS ALL SIGNATURES COMPLETED ----''� � F�'�� � 1 I �' �� � � ��I � � �� � �� � i � � -- - � ` . � . � �; ----��-� -835.- � �'S>.�'.��. �" i\�\ � �� ���I � � I�,�'uS � I``I�,� I \ / � � ��--� ��� -----� �\ � � � � �\�-_---'�� _i � \ I I J� �v I/I I \ �' � � � � \\� �\ \�\��� \\\\ ��-----� �� \� \ \ �� .e -___- ,� pa,e \ \ � � � � � � P.e nte \ \ � _ � - � �`�`� \ � � � � I I �i I co � I \ � - -_ - / � \ = \ � \ \ � \ � � � � \ `� - - _ - _ ` � � � 9� � � � 40\ \ _ _ . _ ' � Office of: M o. \ \" F�\ \� l � � I� � �� I � � I � I� II II \\ 1 � � �� �� ��-�a _ � ��\ \\����\� �\ \ \�\ � �.830-� � \� �� S� \ �� � ��- Morr M Fw�av-va��o.Ncz�szs ��----� _1..��� ��������. �� \�� � ' I\�l\� \� I I l � � I \ \ �� � � �� � �1`� i��r_� C�T� � \ � \ ��� �e�� � �-�\_�� �� \� �� � �� ����_ _-_-__ nmoHun ",,,V..moma�.�om /� �\ 1 I \ \ 1 � 1 \ � \ � i / / � r� I- � �\� \ � � � � 2S � ����\ �\ � � � � � �� � i �.'\ � Y�� a I � � 1 I I � 1 I � \ � � � � � � � �� � _ -_ � o � 1 1 \ 1 \ � � / 1 �BEA�ER�I///f / � \ � � � � \ � � \ � � � � � � - - - - 1 �� ___- / �..�\\ \ I �\ I � � � / / / .. � � B \� � �\� \ � � � � \ \_ . �_ � � � \ ��s�4,�� � � \� \ � I � � JEFFEC2Y F.HMNKS �� \� � � ,� � /�� \� �1 � aQ \�� ���� ��� � \� ��� \ \� ------a35- �� _�� � ^ � � � \ � - �4A I � � I &\S�SAN H.HATI S � � /� 1� � I � �� �� � � � � �\\��\ � �� �\�`--------J EIl Illeel'lll ..•.�.." - � �p4�bs I \ � I � \ I � \ \ r / � . � � . �\ �� `� � \ � � ` g g ?e ��\ ��--- _-- _---��� � �. . �p830� � �' � I 1 \ I � I � \ \ � � � / � � � a' � /� \ \ 3I � � � � �� � �� �� \ � \�� �� _------ � � � � � � - - . � � � �I I I ExISTIN DIT(5 H ENOS HERC� CLA55 B RIP RAP � l i i / �� � C 55 II RIP RAP � � \ � � � � � \ � ' � � _ _ - - VERTICAL SCALE HORIZONTAL SCALE � �- F-. I \ � �'�' � IAND B�OME�NDIFFUSE FLO \ I EST. 2 TONS� \ / / � � � TO ELEV. 822.0( YP. � � \� \ � � �\ \ \ � \ 83 _ _ � 1 2 2 5 � �`_ u� � ) �' P �' P' S' P 5' P' � � � \ _ _ - - - -830-- - - � \ �:. � - I / �Q10� 4. cfs \ � � EST. 7 SY 6EOTE%TILE 1 � �\\ / 2 I I / -(SYFFUCTURE PAY ITEM) � \ � \\ \ \ \ \ \ � � \ � � - � � - - ' �� �� � �`�� �� \ ��\--_ / � I V10� 1.7lfps(�eN-ERSOVIE) \ \ � � � � �I � � � �� � � � � �\\\ � �� \\ \ �\ � �-�� �\ __I�______ _ �\ .._ � -���C � �'-"-�.5� � � �\ � / I �\\{ � \ \ � \ \ �� �� \e2s� �\\\,,____ � � � - - - - � - - / � roe vRareaioN � \ � � � _ �"�'-� PERMIT DRAWING � ,' � - � � iP � see eT a n � � � � � � ��.� �, I i � � r � a _ \ � � � � � � _ , � _ _ - SHEET 3 OF 7 � / �I �� � � I I 1 i � � � � � � � GLI \ \ � \ \ \ _ J / / _ _ / ' ' I - _ \`� \ \ \ \ E ST. 5 Y PSRM / � � � pl OL 0.6 f _ _ � I l l ��� i � � )� � // I � � � � \ \ � \ � _ � \ � \ � � � � , � � � \ - - � / ' �\ -. � � � l � � VL0-1.1 fps� � ' .�..�� il I � / � � ` \ \ � � _ _ - � \ � � � � � � - � � � � � m � � �� i/ � ---i -� �\� � � .. , � \ � �� � (N'ON-E,R�SN 61 r - ��1� �����(�/ - N ,.�,.:;� ,� \ � � \ l �_- r � \ �� �, \ \ \ U ` � / � ue I . . - f I�. � \ \ � ` � � i / / � SEE TATE BTION � _ .\ �H \ \ .,� \ � GI� �� ( I I � I I, �^ . _ oOE�,oue rue � r ��vu� � roe���rue � ` ` r�`�-�1���\ \ � / i � � � �$`� � � E �i• l I�� � � i�\ �� \� �J� D , ... \\ ��/ / � � , — � � R p , — � � � pF�p�p � \ \. P ` � , - � 1 -� V% � �/ � �\ � � � ..,. ���.,., / � \ /� /� iiE- � _ _ _ � � \ EI - g� LT � - __ - i \\�1i� ��// - _ � _ - -M�e/� / � � � t _ _ � _� g�� . - �. \ HP . . � /�/ � P � \ � EST 55 TONS 61P aA� � . _ - .. \ � ao_ _ \\ 1 I . : _ _ _ _ � � - . .. ^-C , �'4r�;;-\ . - . �,;".�' "'_ � t EIP / o % �\ � i esr. ns,sr �eorexTue � �\, � � ��"' „ _ - - - -' - n � - - _ � _ ��°0 r� � i�� � vio ���o � � i / � - - - - \ L� snNe Aiw -A--'7�9 ��i � i ,-- _lr \�\���� " __ _ �-- -- -� -__�-� --- � � �P i � i. � _ _ _` __ --- - i � � �� � i� �' �'�a 2$ / EkISTING 61TCN ENDSHEgE --- --"' ✓� E� ��\ - � � o -- __� _- -- � / � � � � / /AND B�COMES DIFFUSFFCOW �. .,_ i � � . � — II -- --- -- ---�-- -- u �—� — i// 6t� i �. / \ Y �// - to- 3s t �- _--- � ------------" :1.1. II I -_ - r�l- � Hv�uE o� � �g� i - � _ c � 1 �� / �/ V10J 1.S�INON-ERSO�EY`�. __--�$c0 �,-�fr \- �_ ___—_-- \_ �/ /� i /���///--�\\µtB �--\����z/^����� �i 1 �-- � � i e �- � ".,.� , � -- - -_ � J/ // / _� il0.,n ' --E i � I /\ / / � � V i � / / G`_ � � _ � � _ � � _ � � \•! BZ 1� _ ➢IlE � � R6 I I `- ��� /i % � �---920---� \lt "' 1 `���:3s/ /i 1 ___, i ' i , ,-' � � --__, ---� --- , � ` ` �.'. ; _ .. ,.. � �/ _��// i� i� S�VA�/P ��\\� � � . � -- � i O \�\ � \\\ � I �� � - � � � � � � � BRC RIVERSIDE LLC ��� � \ � �� � / / / �V ���� � / i � �\ � � / � �,kOO��� O � �v� �,, ��v��uP � � �\ � �� �' 50 100 �\�EE ENLAR�E� , �REA ON � ,' SCALEe I"= 100' HORIZ, NEXT SHEET `��,, / ----�---- ����������� ������ ; ;, I�� ,���������� ���■�.►,�■■■�■ ii'�������■■■ ■■■■■r�fiii���� 9 10 11 PI = 12+40.� EL = 824.11' VC = 330' K = im �������� 12 13 � , ^ _ _ •?g.5• E�s�zazz zre _ --�-�T � �'�g�� � ' i `�I, ------- — _ — � _ 5---' / � 8 ���'I / ,- /.���''— P•,p�y �� � % 9if, / ��� � / �0 PPS16.85' ��/�//� i�/ �' P E PdE �' —�r� s. K�, �-�; � r, � 1� r. .�, � _ ��,�� ��3 =� F.^,=='�--*`���"� ' —� ' / � ' � � i / � � \ / � _ - 1 Z�� ��- �� � ������ �� � / /��' ���/ �� / i� �'i� / l 1 / / +I I 1 I ezi '--_ / li� \� � � / �� ��� /� /'' 1 I`-.. I f 1 1 / i , � � 'ti t' _�� � � �� � < <' ' � LEGEND \�� �� �_ SITE 1 B `� ,;1� w����\`���` � �� �' -- `- _- �' ailP � � � i e2 � � rz �\ � � � �\ � g i � � � � 3� RIPARIAN BUFFER I \� 1 I /� \���i � '� ;� � \\ \\\�� �� �\\\ -BZ 1- ZONE 1 (30'1 I / � 1 � � � y` \ \ � � \ \ � � \ � � -gZ 2- RIPARIAN BUFFER � � � �� �� tiq� \ � A � � �g2 � � � �, zoNe z �zo'1 � i � � �S � �� �� � W � I / \ �� I\ ���I�\�\��\\\�\\�\ ALLOWABLEBRDPGETS ZONE 1 I / \ / I � � � \ � � I I � � �� I $yMIP /l \__ �� // � eN�\ �� I��\�\� \ ����� � - \ � I � � � � � � ALLOWABLE IMPACTS ZONE 1 x � � / �� �� �I\ ��\ � � � (ROAD CROSSWG) ���I � /\\/ ��j �% /�� �� �\ \ � � � \ � \ � � ALLOWABLE IMPACTS ZONE 2 f]�. v' 1Ls V b \ \ (ROAD CROSSING) ,���1�'s �L � � � , _ � ETF / � � EXISTING TRANSPORTATION / \ \ FACILITY 14 15 ������ � •; • ■ ���������� ����I ' : ''� �, ��� ����`����I � � ., �■■■�,�I � �__J■■■��� ■���■�I.��■■I ����i����s� ���i�ii�■■I i�■�■■■■■I ����■■■■■' ����■■■■■' ■■■■■■■■■' ■■■ %'/�/%. ����' . BR/DGE HYDRAUL/C DATA DES/GN DISCHAftGE _ 1800 CFS DESI�Iy FREQUEIyCY = 25 YRS — DESI�N MN ELEVAT/ON = 820.9 Fi _— BASE �ISCHAR�E = 3000 CFS BASE FREQUEN�1' _ lQO YRS BASE HW ELEVAT/ON = 82324 FT OVERT�PP/N� D/SCHARGE = 350Q CFS OVERTOPP/NG FREQUENCY = �00+ YRS OVERTOPPING ELEVAT/ON = 823.8 fT DATE OF SURVEY WS. ELEyATIOA/ AT DATE OF SURVEY = 3-02-20/6 = 8/87 fT u �'�l (✓)� i�, BUFFER IMPACTS PERMIT j�'� PROJECT REFERENCE SHEET NO. I 1 ���� � ROADNG N D S�GN RD 108 �ENGINEER� JS J� �Y �J 30 0 15 30 SCALEa I"= 30' HORIZo ��lls���YJLs� ���� ���� ���� � MOTf mACDONALO 18 E, LlC I LICENSE NO. F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALl SIGNATURES COMPLETED repare n 1 e Office of: M M Pa aa, ,00 MOTT Fuquay-Varina,NC ]J526 MAWONPLG www.mo moc.com 1 �� Engineering BUFFER DRAWING SHEET 4 OF 7 iCaf r�i ic° BZ 1 BZ 2— ETF LEGEN D RIPARIAN BUFFER ZONE 1 (30') RIPARIAN BUFFER ZONE 2 (20') ALLOWABLE IMPACTS ZONE 1 (BRIDGE) ALLOWABLE IMPACTS ZONE 1 (ROAD CROSSINGj ALLOWABLE IMPACTS ZONE 2 (ROAD CROSSING) EXISTING TRANSPORTAION FACILITY BUFFER IMPACTS PERMIT � � , ; � ;,� , , ,� � � , ; , �� � , , �, ��_— � � � � �� -' ,' � � � / / I � � � �/ /� �\ / � \ � I I / / � I �/ / � � i I � � I I � r l i �� � e� � �, I I I / / \ �� ' I � l / 1 / / � �l �� l \. �Q10� 0.6 cf��' N � �� " ; � � ; ,,--- ; � , , ,�,�, , , ►v , ___ i� i �� i� i� i 4� �y t � / �� V��� _�.� Tp$�' N N°-= '� i " ' i � i r' ,'� % i � , (N�i�I�B4SIVE) -----__ , � , , , , m °� ;,�, � �;,��,; � � � ,�����, � � ,���, � ', ' '� , i i � � , � i ' i i � � �� ��E ' ,����, �; � � , � � � �� �� i �� r �iiii i i � � �I � � � i � ' � � i i i � � � i , � N W u �'�l (✓)� i�, j�'� PROJECT REFERENCE SHEET NO. I 1 ���� � ROADNG N D S�GN RD 108 �ENGINEER� JS J� �Y �J MOTf mACDONALO 18 E, LlC LICENSE NO. F0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALl SIGNATURES COMPLETED � repare n 1 e o Offi e of: M M Pa a , ,00 MOTT F na,NC ]J526 MAWONPLG oc.com 1��„�.::,. _ Engineering BUFFER DRAWING SHEET 5 OF 7 iCaf r�i ic° ` � � ( ' � i i i � —__� � �__---`� �� � \ � � � � ` � �t , p, -_ �---' ' ' - � , D E ,, ,DUET �-pUE , �---- -- ---iiiiii/ �� ,�` �� ��' � `��� � � �, i�i ii , � , ���� � � � � � �� i / � ����� � � ///// �� � i� � � i � i � � ` ` ��' %f � j / � j / � V\\\ � \�\\ ////// �� � i � � � � � � , � �, ,� � � � �`� `—, �� // j//�� " �' � i � � � � i //�/�� j/�� �\\ � � — � �-- � � �`��`�` ` �'ii�i'' ��/���/��� �� \ — — —___ �/// � � � � i ii X / / // EIP � - - �� _ ���,�� � , �� � �,, � --- - _--- --- ----- -- - --� _ � �� � i -. - � - -- - - - ;�-�- �.N'� ,�,,�,,I ; , � �;,',', � x � - �-_ ���- - - _ - ; _ �� � ii �_- -; -�_----__ , ��� X� _--- - - - =-- --------- --- _ __, ;, _��_� � - -- - _ -- - =�__ � � -_.___ -,�__ � , ,��� _ - ---- - - -- - - �. � ----------- �= �__ �., � ��� _ -------_ �r ,�, � � , , --- -_ - . '_l � I�I�I � AAAI � _ __-__-- - _ _ _ _ _ _ - _ __ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ - _ _ _ ' ' II \ _ _ _ - - - _ - _ - _ _ _ -_-_ - -_-� .\, � _ . I � I `\ _-_ I � � A AAAA� � I � _------ - I /�I \ ���\ I � - - - - - - - - - - - - - - � �I ' � ' - - - - - - - - - - - - - - - - - - - - - - _ -- � �. --- ------------ --- - � � �� �/� � — �-1 \\ '� , ---- � - - - - ---------- , - II� I I - ' III�I� II�I �� I � ���III�� �, ---------- -----' i�hi �iii �i i I i iu�i� �, --- - - iii�i i�ii �� � i�i� � ---_ --------- � � i� --- ---------- ,�i� i , i iii� i ---- � � i iii '�i i i i ii'��ii -, i i i I i ii i -' �----- , ------ --- - - � ���� �' ' � �,� � , -------- ------ ----------- ------ J � -- _�_____—� ---��_--_--------- _� __�: - r ii � _�- ;,-�\�� ��i i� : ---------___ ----_---_------------- �� i i� � _____________ ti — -- — '-- — -' � ,r �i� i� � ���i �� � �\� ;----- -------__���'-` — ---- _�-_— - �---��-__- � � �' i � ---- - -- ,-. --_---- - �- - -- --- --- —�=� - - - - ---��€ ' _ � -- _ ---- ---� ' --- c" � z�= _� /�' I ��I � �' �� � �-_- - y� — -----E ---------- ' / � i� � � - _ _ _. - - - s .t- - - - - � � � � I I � � \\ \\ �������������/ ��� � \ \ \ �%- ._�---- -- i i � / i � \ _ _ _ _ _ - - _ _ _, — W� ///// / � , - � , - - - - , , � �, , � , - � - !////////////%�`////// � � � , � _ PbE , �� , �RE ,, � � � PDE ' - -- -- , � � i � _ --__ --- __ � �� � � � , _---- -- -- , —�S � --- �--�/'_--- , / �, �� � �--- -- ---- - -- � i � � `� i i i i '� ' <� � i i i � �� ,- � . � , , BZ --------------- ' � � � � 1 � i — _ �� �`� � � �i �i � � �— � � i � � , \ � �� ,_—�� �� i i i i �� i i i i '__. � � � i � i �� �� �� i i i i �� ' � � � ' ' ' �� S ITE 1 � ,.,- ,,\,,,,,---� ;, , , � �� �,, �, ,- , , , __— SWAMP � � ------ , �--- _ , , � � � � -_ � i ,- �� i i � � � i i i � � � � ,' ``�. � i � � �i � � i �� � i � � � � ,� � � i � i � `, � � � : ', � � ', ! 30 0 15 30 SCALEa I"= 30' HORIZo ��lls���YJLs� ���� ���� ���� � n BZ 1 BZ 2— ETF LEGEN D RIPARIAN BUFFER ZONE 1 (30') RIPARIAN BUFFER ZONE 2 (20') ALLOWABLE IMPACTS ZONE 1 (BRIDGE) ALLOWABLE IMPACTS ZONE 1 (ROAD CROSSINGj ALLOWABLE IMPACTS ZONE 2 (ROAD CROSSING) EXISTING TRANSPORTAION FACILITY BUFFER IMPACTS SUMMARY IMPACT BUFFER TYPE ALLOWABLE MITIGABLE REPLACEMENT ROAD PARALLEL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 TOTAL ZONE 1 ZONE 2 SITE NO. STRUCTURE SIZE / TYPE STATION (FROM/TO) CROSSING BRIDGE IMPACT (ft2) (ftz) (ft2) (ft2) (ftZ) (ft2) (ft2) (ft2) SINGLE SPAN 24" CORED SLAB W/ 4.0' DEEP CAPS, 1 1@70' -L- 14+07 to 16+72 X 1081 1081 X 3333 1447 4780 TOTAL: 4414 1447 5861 Rev.Jan 2009 � om H � < � H Z 7o��p r�TI�Cn �z-I=D =�DDm � Z 2 N O � z,���-n • �OH �DDD �� U' o z� m Z � � m� � _ _ � � m � D � z = O p o �7 D � � � � r '-' � D � � �"� Z Z � � � O � �SEEIPBANS A �� �CLEARING LIMITS � \ S� �E '� =�E � R�W ^��� CLEARING LIMITS E� � �E l�� � �E E E � � - � R/W C � � - - - - � - - - - � � SLOPE STAKE LIN� rE.O.P. R/W � � � R/W � l�✓ SLOPE STAKE LINE F Iy B � E.O.P. �-� D - - - ----� � �-� �-� � � � � _F ��`�`` /��------ � �) E ���� E R/W � - � E E �O \ R�W �� E E-'J/ E, ` CLEARING LIMITS i �� �j �. � � �- �•;: _ .���� CLEARING LIMITS , ^ , A �j�, :;:' CLEARING LIMITS ' .• � �• . ��''' �: �. B .. • . D GENERAL NOTES: C � 1. REMOVE TREES OUTSIDE THE CLEARING LIMIT WHEN, IN THE OPINION OF THE ENGINEER, THE UTILITY OF A TREE WILL BE DESTROYED BY THE CONSTRUCTION OR THE CLEARING OPERATION. 2. CLEAR IN ACCORDANCE WITH THIS STANDARD EXCEPT WHERE ADDITIONAL CLEARING IS REQUIRED FOR SAFETY AS SHOWN ON THE PLANS. 3. FOR SECTIONS WITH WIDE MEDIANS WHERE TREES ARE TO REMAIN, CLEAR THE MEDIAN SIDE IN THE SAME MANNER AS ON THE OUTSIDE. CLEAR TO SLOPE STAKE LINE OR CONSTRUCTION LIMITS . � i •� ^ ` � :�' •• '.. : :l:••' �. . . SLOPE STAKE POINT - C� ROAD � SLOPE STAKE POINT J � PART SECTION D-D CONST. LIMIT LATERAL DITCH, CHECK DAM, SILT BASIN, SILT DITCH, - . TEMPORARY DIVERSION - CONST. LIMIT � � '-� � . `• ��.�. •i � SLOPE STAKE POINT � PART SECTION C-C ,;� :+ :' �� �: . . ...• . FENCE � i � ISLOPE STAKE POINT� PART SECTION B-B CONST. LIMIT RISER BASIN � z o� H � H aQ HOCC='�C� LLJ�Hz oo�= wQz�-x QU��H � F— 2 Z W c!)H�OJ O�CAQ Z H � 1 � �� 0� � O L.L � Z Z H ~ �. Qa� o W � J o v ' � o LL O z � _ � � � � _ _ � � � W J �C.'3 Z W 1EET 1 OF 1 S�OPE STAKE POINT —� `} SHEET 1 OF 1 200 ■ 02 SECTION A-/4 CONST. LIMIT ^O� ■ o^ L L