HomeMy WebLinkAbout20170187_Cover Att L and Att G_20170214� 57ATE�o,'
�,a ,w=.., No .
?�.
:� �o���'� ` �C
+w.n.rt ,
~W.�`.�.�pP
STATE OF NORTH CAROLINA
DEPART�NT OF TRANSPORTATION
ROY COOPER
GOVERNOR
February 14, 2017
US Army Corps of Engineers
Raleigh Regulatory Field Office
Attn: Mr. David Bailey
3331 Heritage Trade Dr., Ste. 105
Wake Forest, NC 27587
Attention: Mr. Dave Bailey and Mr. Dave Wanucha
7AMES H. TROGDON, III
SECRETARY
NC Division of Water Resources
Winston-Salem Regional Office
Attn: Mr. Dave Wanucha
450 W. Hanes Mill Rd., Ste. 103
Winston-Salem, NC 27105
Subject: Notification for the replacement of Bridge #108 over Haw River on SR 2022
(Linville Road) in Guilford County. WBS # 17BP.7.R.89
Dear Mr. Bailey and Mr. Wanucha,
The North Carolina Department of Transportation is scheduled to replace Bridge #108 with a
new bridge at the same location. I have included the Attachments G& L with a project
description and a set of the project plans. A stormwater management plan is also attached. Please
review this project for compliance by your Division.
We plan to begin construction as soon as possible. If further information is required, please
contact Jerry Parker at (336) 256-2063. Your early review and consideration will be appreciated.
Sincerely,
�� � ?�'�� [��
.M. Mills, P.E.
Division Engineer, Division 7
Enclosures
cc: Tim Powers, NCDOT (electronic copy)
Aaron Harper, Roadside Environmental Field Operations Engineer, NCDOT
Jeremy Warren, NCDOT
Bobby Norris, District 2 Engineer, NCDOT
File Copy
Mailing Address: Location:
NC DEPARTMENT OF TRANSPORTATION Telephone: (336) 487-0000 1584 YANCEVILLE STREET
DIVISION OF HIGHWAYS Customer Service: 1-877-368-4968 GREENSBORO, NC 27415-4996
DIVISION 7 OFFICE
P.O. BOX 14996
GREENSBORO, NC 27415-4996 Website: www.ncdot.gov
��
�:�
�
�� x
���
� � ,.
Environmel�ial
Quality
ROY COOPER
Gonerr:or
MICHAEL S. REGAN
Secreta�y
S. JAY ZIIvIMERMAN
Director
Attachment L: Low Impact Bridge Replacement Process
Low Impact Bridge Project No.: B-N/A County Guilford
Bridge No.108 over Haw River WBS Element Number 17BP.7.R.89
This project is subject to the Low Impact Bridge Process as agreed to on October 6,
2009. This project meets the documentation requirements and approval procedures
under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project
meets the standards of NCDOT's Minimum Criteria Rules.
Date: Februarv 14, 2017
Applicant Name: NCDOT
Applicant Address: 1584 Yanceyville Street
Greensboro. NC 27415
Primary Contact for Project: Jerry A. Parker
Phone No.: 336-256-2063
Is this an after-the-fact application: Yes X No
River Basin: Cape Fear/Jordan Lake Watershed (03030002�_
Stream Classification: WS-V• NSW• 16-(�; 03-06-01
Regulatory Authorization Options for this Activity
Federal: USACE Nationwide General Permit 3— Maintenance
State: General Water Quality Certification #3687 and/or Buffer Authorization
Local: None
ProjeCt Description — The project consists of replacing Bridge #108 over the Haw River on SR 2022
(Linville Road) and improving roadway approaches. The existing triple-span, 18' L X 21' W, timber deck
on timber joists, supported by timber caps timber piles with timber bulkheads is structurally deficient and
will be replaced with a new 70' L X 36' W, single span, cored slab bridge at the same location. An off-
site detour will be utilized during construction. There are wetlands located within the entire project area,
however, disturbance has been minimized where possible, limited to 0.02 acres of proposed fill, <0.01
acres of excavation and 0.29 acres of hand clearing. NCDOT proposes fill slopes at 2:1 to further
minimize the wetland impacts for the project. There are no stream impacts proposed for this project and
no deck drains proposed on this bridge. The project drainage system consists of an inlet pipe system on
the northwest side. Discharge from this pipe outlet will be attenuated on a riprap pad located outside the
riparian buffer areas and will be diffused by existing topographic conditions before flowing to the riparian
�-�"�''T�*1o�hia�g [�r�n�)�ar�s��'=�_�
State of North Carolina � Environmental Qualiry
1617 Mail Service Center � Raleigh, North Carolina 27699-1617
N� . . � � � ��� ��� � � � �
� � �� ��� �,w�� , � �
buffer. The ditch in the southwest quadrant will be retained and lined with toe protection at the fill slope,
the outlet diffuse before entering the buffer and wetland. There are no ditches in the north and southeast
quadrants and the roadway is in a�11 section, therefore the runoff will sheet flow off the pavement
through the grassed shoulder. There are utility relocations proposed with this bridge replacement and the
plans are included. Any associated impacts are within the proposed bridge replacement project footprint.
Proposed Riparian Buffer impacts include 4,414 square feet in Zone 1 and 1,447 square feet in Zone 2 to
accommodate the bridge. Of these riparian impacts, 4,107 square feet in Zone 1 and 1,108 in Zone 2 are
also wetland area. On June 28, 2016, Bob Lepsic with Arcadis surveyed for the Small whorled pogonia
within the project boundaries. There were no specimens found, however potential habitat was present;
further, there are no occurrences of this species with 1.0 mile per NCNHP. Therefore, the Biological
Conclusion for Small whorled pogonia is No Effect; Habitat Present. The Bald Eagle is protected in
every county in North Carolina under the Bald and Gold Eagle Protection Act; however, no suitable
feeding/water source is located within one mile of the project study area to support Bald Eagle habitat.
Also, Mr. Gary Jordan (USFWS) recently released the Programmatic Conference Opinion (PCO) for the
recently listed Northern Long Eared Bat (NLEB). This opinion, states in part, that "... it is the Service's
conference opinion that NCDOT activities in eastern North Carolina (Divisions 1-8), as proposed, are
not likely to jeopardize the continued existence of the NLEB. "
Signature: � � / `� '�`� ` � �i
Print Name: �l � 1`� - � � ��. S
�
Title: �i V I 5 i D�1 � V� i Y1�G�2�
Attachment G: Low/Minimal Impact
Bridge Project Data Sheet
TIP NO N/A
WBS Element No. nBP.�.R.es
County Guilford
Bridge Number 400ios
Description Bridge #108 over the Haw River on SR 2022 (Linville Road)
Basill Cape Fear (Jordan)
Classification ws-v; Nsw
Stream SIN 1s-(1)
Type Perennial
SiZO 5055 ft. wide; 5-7 ft. deep
Type TIMBER DECK ON TIMBER JOISTS WITH TIMBER CAPS & PILES, TIMBER BULKHEADS
Existing Structure Size 1@n�e^,1�a7�o^,1@n'a^
Suff. Rating zo.7a
Type 24" Cored Slab Bridge
Proposed Structure
Size 1 �7on.
USACE (LF) o
Stream NCDWQ Impacts (LF) o
USACE Itil paC�.S (AC) 0.02 ac perm. fill, a0.01 ac excavation, 029 ac hand cleadng
Wetlands Non 404 Impacts (AC) o
CAMA Impacts (SF) No
NC DWQ Buffers Im pacts (SF) 4,414 sq. ft. Zone 1,1,447 sq. 8. Zone 2 '
BufferApplicaton Required (Y/N) Yes
State Stormwater Permit Required (Y/N) No
Habitat Bald Eagle:No Small Whorled Pogonia: Yes
T&E Species Present No
Bald Eagle: No Effect Small Whorled Pogonia: No Effect; Habitat Present
Bio Conclusion
T}tpe None
Moratorium
DatOs None
Native/Hatchery No
Trout Waters Trout Species Present No
Trout Conditions (Y/N) No
WRC Reviewer NiA
CAMA AECs No
E�ential Fish Habitat No
Nav. Opening No
USCG Permit No
Historic Properties No
Archaeologicai Resources No
Tribal Lands No
4(� Resources No
6(� [LWCF] Resources No
Wild and Scenic River No
Federal Lands No
NA Area No
FEMA Buyout N/A
FEMA Flood Study Yes
USTs Haz Mats No
Relocatees None
LAT 3s.iaiss4
Location
LONG -80.014345
Project Comments None
Completed by: �--�� Date: 2 � � �� �
Lead q ineer
" G�• Date• � -1 � `" 1 �
Divisi n Env onmental Officer