Loading...
HomeMy WebLinkAbout20170186_Cover Att L and Att G_20170214�p aSTATFnN, O jF � Ri1 ,� �: y�' �� STATE OF NORTH CAROLINA DEPARTN�NT OF 'TItANSPORTATION ROY COOPER CiOVERNOR February 14, 2017 US Army Corps of Engineers Raleigh Regulatory Field Office Attn: Mr. David Bailey 3331 Heritage Trade Dr., Ste. 105 Wake Forest, NC 27587 Attention: Mr. Bailey and Mr. Wanucha JAMES A. TROGDON, III SECAETARY NC Division of Water Resources Winston-Salem Regional Office Attn: Mr. Daue Wanucha 450 W. Hanes Mill Rd., Ste. 103 Winston-Salem, NC 27105 Subject: Notification for the replacement of Bridge #210 over LitHe Alamance Creek on SR 3124 (Stewart Mill Road) in Guilford County. WBS # 17BP.7.R.90 Dear Mr. Bailey and Mr. Wanucha, The North Carolina Department of Transportation is scheduled to replace Bridge #210 with a new bridge at the same location. I have included the Attachments G& L with a project description and a set of the project plans. A stormwater management plan is also attached. Please review this project for compliance by your Division. We plan to begin construction as soon as possible. If further information is required, please contact Jerry Parker at (336) 256-2063. Your early review and consideration will be appreciated. Sincerely, ��� '� ��-�-�i�i %Y� j .M. Mills, P.E. Division Engineer, Division 7 Enclosures ec: Tim Powers, NCDOT (electronic copy) Aaron Harper, Field Operations Engineer, Div 7&8 Roadside Environmental Unit, NCDOT 7eremy Warren, NCDOT Bobby Non•is, District 2 Engineer, NCDOT File Copy ` MqilingAddress: Locafian: NC DEPARTMSNT OF TRANSPORTATTON Tetephoi�e; (336) 487-0000 1584 YANCEVILLE STREET DIVISIONOFHIGHWAYS CustomerSernice.• I-877-368-4968 GREENSBORQNC27415-4996 DIVISION 7 OFFICE P.O. BOX 14996 Website: www.ncdotgov GREENSBORO, NC 27415-4996 F.nvlronmental Quality ROY COOPER Governor MICHAEL 5. REGAN Secreta�y S. JAY ZIMMERMAN Dtre�ro, Attachment L: Low Impact Bridge Replacement Process Low Impact Bridge Project No.: B-N/A County Guilford Bridge No.210 over Little Alamance Creek WBS Element Number 17BP.7.R.90 This project is subject to the Low Impact Bridge Process as agreed to on October 6, 2009. This project meets the documentation requirements and approval procedures under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project meets the standards of NCDOT's Minimum Criteria Rules. Date: Februarv 14. 2017 Applicant Name: NCDOT Applicant Address: 1584 Yancevville Street Greensboro NC 27415 Primary Contact for Project: Jerrv A. Parker Phone No.: 336-256-2063 Is this an after-the-fact application: Yes X No River Basin: Cape Fear/Jordan Lake Watershed (03030002) Stream Classification: WS-IV• NSW 16-19-3- 0.5 • 03-06-03 Regulatory Authorization Options for this Activity Federal: USACE Nationwide General Permit 3— Maintenance State: General Water Quality Certification #3687 and/or Buffer Authorization Locai: None Project Description — The project consists of replacing Bridge #210 over Little Alamance Creek on SR 3124 (Stewart Mill Road) and improving roadway approaches. The existing triple-span, 64' L X 18' W, timber deck with timber joists on I-beams, supported by timber caps, timber posts and sills on concrete footings is structurally deficient and wili be replaced with a new 90' L X 30' W, single span, box beam bridge at the same location. An off-site detour will be utilized during construction. There are wetlands located within the project area and <0.01 acres of roadway fill and <0.01 acres of inechanized clearing is proposed. This project also proposes only 46 linear feet of permanent stream impacts associated with bank stabilization. Please note that the -' �'NoYhing �:ompares ".. , Stato ofNoith Camlina � Snvironmontal Qualiry 1617 Mail Service Center � Raleigh, North Camlina 27699-1617 "' . ,� �' 4�2;ss „�� �j u�'�^�.�w�[ ,a'..-�',a �.'� �- .'' `�z h � � � s , y z. i _'.� , .'. - , R � z xvz z'"�;,.'n � - � ' 2'��'"v�'i,�'. �� � , . �.,H �f.. ,y..�e,�)..,�.«�''e. ' ._ '.. -,' �: , ,,.s .. .,...- � , „ �. S . existing concrete sills on the south side of the stream will be retained to avoid stream impacts. There are no deck drains proposed on thjs bridge. The project drainage system consists of an inlet pipe system on the northeast side. Discharge from this pipe outlet will be attenuated on a riprap pad located outside the riparian buffer areas and will discharge into an existing grassed ditch for treatment. The embankment of the stream at the outlet of the grassed swale will have rip rap to dissipate any energy prior to discharge into the stream. The ditches in the southeast and southwest quadrants will be retained. There are is a utility relocation proposed with this bridge replacement and the plans are included. One aerial Duke facility will be temporarily moved while the bridge replacement is constructed; the buffer impacts are accounted for within this application and listed below. Proposed Riparian Buffer impacts include 6,507 square feet in Zone 1 and 3,826 square feet in Zone 2 to accommodate the bridge, the roadway realignment and the temporary aerial utility relocation. On June 28, 2016, Bob Lepsic with Arcadis surveyed for the Small whorled pogonia within the project boundaries. There were no specimens found, however potential habitat was present; further, there are no occurrences of this species with 1.0 mile per NCNHP. Therefore, the Biological Conclusion for Small whorled pogonia is No Effect Habitat Present. The Bald Eagle is protected in every county in North Carolina under the Bald and Gold Eagle Protection Act; however, no suitable feeding/water source is located within one mile of the project study area to support Bald Eagle habitat. A�so, Mr. Gary Jordan (USFWS) recently released the Programmatic Conference Opinion (PCO) for the recentiy listed Northern Long Eared Bat (NLEB). This opinion, states in part, that "...it rs the Service's conference opinion that NCDOT acfivities in eastern North Carolina (Divisions 1-8), as proposed, are not likely to jeopardrze the continued existence of the NLEB." Signature: � I � ��� /a "`�-�N/I �� Print Name: .�• � • I"l,� �l5 Title: .I I�ViSiOV� ���fiVle�i� Attachment G, Low/Minimal Impact � ••- '' • - �. . --� TIP NO N�A WBS Element No. neP.ze.so Couniy Guiltord Bridge Number 4002�0 DeSc�iption Bridga No.9� ove� Litlle Alamance Creek on (SR3124) Basin Cape Fear (Jordan) Ciassificatlon WSIV; NSW Stream SIN 16t&&(o.5) Type Perenniel SIZ¢ 20'-90'wide;l0'd5'bankheighl Typ¢ TIMBER OECK ON APP:TIMBERJOISTS, MAIN:I-BEAMS S DOUBLE CHANNEL F�cisting StluCtUle Size 1Q18'3',1(1a,29'0",1@t]'0" Suff. Rating 33z Type 24" Coretl Slab Bntlge Proposed Structure Size i @ �0 fl. USACE (LF) 48 LF pertnanent Stream NCDW�Impacts(LF) � 46LFpermanenl USACE Impact5 (AC) �0.01 pertn.fill, a0.01 machanizetl cleanng Wetlands Non 4041mpacts (AC) o CAMA Impacfs (SF) No ' NC DWQ Buffers Impacis (SF) 6,50� sq. fl. zone �, 3,826 sq.fl. Zone 2 BufferApplicaton Required (Y/N) Yes State Stormwater Permit Requl�ed (YIN) No Habitat Bald Eagle: No Small whorled Yes pogonia T8E SpeciesPresent No Bald Eagle: NoEHect Small whoded �Ert�;�m�PR�� Bio Conclusion pogonia Type None Moratorium Dates None Native/Hatchery No Trout Species Present No Trout Waters Trou[ Conditions (YIN) No WRC Reviewer N/A CAMA AECs No Essential Fish Ha6itaf No Nav. Opening No ❑SCG Permlt No Historic Propel'tles No .4�Ghaeological Resources � �� No � � �� � Tribal Lantls No 4(Q Resources No 6(� [LWCF] Resources No Wild and Scenic River No Federal Lands No NA Area No FEMA Buyout No FEMA Flood Study Yes USTs Haz Mats No Relocatees None LAT 36D54o81 Location LONG -19.631015 ProjectComments � — Nona �-� -. Completed by: ���� B` r"'—� Date: Z- ��� � Lead Enginee . �:ifA_ ` �(i��A''\ Date: ,��^ �^' ! Divisi�on E ironmental Officer �