STATE OF NORTH CAROLINA
DEPARTN�NT OF 'TItANSPORTATION
ROY COOPER
CiOVERNOR
February 14, 2017
US Army Corps of Engineers
Raleigh Regulatory Field Office
Attn: Mr. David Bailey
3331 Heritage Trade Dr., Ste. 105
Wake Forest, NC 27587
Attention: Mr. Bailey and Mr. Wanucha
JAMES A. TROGDON, III
SECAETARY
NC Division of Water Resources
Winston-Salem Regional Office
Attn: Mr. Daue Wanucha
450 W. Hanes Mill Rd., Ste. 103
Winston-Salem, NC 27105
Subject: Notification for the replacement of Bridge #210 over LitHe Alamance Creek
on SR 3124 (Stewart Mill Road) in Guilford County. WBS # 17BP.7.R.90
Dear Mr. Bailey and Mr. Wanucha,
The North Carolina Department of Transportation is scheduled to replace Bridge #210 with a
new bridge at the same location. I have included the Attachments G& L with a project
description and a set of the project plans. A stormwater management plan is also attached. Please
review this project for compliance by your Division.
We plan to begin construction as soon as possible. If further information is required, please
contact Jerry Parker at (336) 256-2063. Your early review and consideration will be appreciated.
Sincerely,
��� '� ��-�-�i�i %Y�
j .M. Mills, P.E.
Division Engineer, Division 7
Enclosures
ec: Tim Powers, NCDOT (electronic copy)
Aaron Harper, Field Operations Engineer, Div 7&8 Roadside Environmental Unit, NCDOT
7eremy Warren, NCDOT
Bobby Non•is, District 2 Engineer, NCDOT
File Copy `
MqilingAddress: Locafian:
NC DEPARTMSNT OF TRANSPORTATTON Tetephoi�e; (336) 487-0000 1584 YANCEVILLE STREET
DIVISIONOFHIGHWAYS CustomerSernice.• I-877-368-4968 GREENSBORQNC27415-4996
DIVISION 7 OFFICE
P.O. BOX 14996 Website: www.ncdotgov
GREENSBORO, NC 27415-4996
F.nvlronmental
Quality
ROY COOPER
Governor
MICHAEL 5. REGAN
Secreta�y
S. JAY ZIMMERMAN
Dtre�ro,
Attachment L: Low Impact Bridge Replacement Process
Low Impact Bridge Project No.: B-N/A County Guilford
Bridge No.210 over Little Alamance Creek WBS Element Number 17BP.7.R.90
This project is subject to the Low Impact Bridge Process as agreed to on October 6,
2009. This project meets the documentation requirements and approval procedures
under NEPA, as defined by FHWA, for Low Impact Bridge Replacements. This project
meets the standards of NCDOT's Minimum Criteria Rules.
Date: Februarv 14. 2017
Applicant Name: NCDOT
Applicant Address: 1584 Yancevville Street
Greensboro NC 27415
Primary Contact for Project: Jerrv A. Parker
Phone No.: 336-256-2063
Is this an after-the-fact application: Yes X No
River Basin: Cape Fear/Jordan Lake Watershed (03030002)
Stream Classification: WS-IV• NSW 16-19-3- 0.5 • 03-06-03
Regulatory Authorization Options for this Activity
Federal: USACE Nationwide General Permit 3— Maintenance
State: General Water Quality Certification #3687 and/or Buffer Authorization
Locai: None
Project Description — The project consists of replacing Bridge #210 over Little Alamance Creek
on SR 3124 (Stewart Mill Road) and improving roadway approaches. The existing triple-span,
64' L X 18' W, timber deck with timber joists on I-beams, supported by timber caps, timber posts
and sills on concrete footings is structurally deficient and wili be replaced with a new 90' L X 30'
W, single span, box beam bridge at the same location. An off-site detour will be utilized during
construction. There are wetlands located within the project area and <0.01 acres of roadway fill
and <0.01 acres of inechanized clearing is proposed. This project also proposes only 46 linear
feet of permanent stream impacts associated with bank stabilization. Please note that the
-' �'NoYhing �:ompares ".. ,
Stato ofNoith Camlina � Snvironmontal Qualiry
1617 Mail Service Center � Raleigh, North Camlina 27699-1617
"' . ,� �' 4�2;ss „�� �j u�'�^�.�w�[ ,a'..-�',a �.'� �- .'' `�z h � � � s , y z.
i
_'.� , .'. - , R � z xvz z'"�;,.'n � - � '
2'��'"v�'i,�'. �� �
,
. �.,H �f.. ,y..�e,�)..,�.«�''e. ' ._ '.. -,' �:
, ,,.s .. .,...- � , „ �. S .
existing concrete sills on the south side of the stream will be retained to avoid stream impacts.
There are no deck drains proposed on thjs bridge. The project drainage system consists of an
inlet pipe system on the northeast side. Discharge from this pipe outlet will be attenuated on a
riprap pad located outside the riparian buffer areas and will discharge into an existing grassed
ditch for treatment. The embankment of the stream at the outlet of the grassed swale will have
rip rap to dissipate any energy prior to discharge into the stream. The ditches in the southeast
and southwest quadrants will be retained. There are is a utility relocation proposed with this
bridge replacement and the plans are included. One aerial Duke facility will be temporarily
moved while the bridge replacement is constructed; the buffer impacts are accounted for within
this application and listed below. Proposed Riparian Buffer impacts include 6,507 square feet in
Zone 1 and 3,826 square feet in Zone 2 to accommodate the bridge, the roadway realignment
and the temporary aerial utility relocation. On June 28, 2016, Bob Lepsic with Arcadis surveyed
for the Small whorled pogonia within the project boundaries. There were no specimens found,
however potential habitat was present; further, there are no occurrences of this species with 1.0
mile per NCNHP. Therefore, the Biological Conclusion for Small whorled pogonia is No Effect
Habitat Present. The Bald Eagle is protected in every county in North Carolina under the Bald
and Gold Eagle Protection Act; however, no suitable feeding/water source is located within one
mile of the project study area to support Bald Eagle habitat. A�so, Mr. Gary Jordan (USFWS)
recently released the Programmatic Conference Opinion (PCO) for the recentiy listed Northern
Long Eared Bat (NLEB). This opinion, states in part, that "...it rs the Service's conference
opinion that NCDOT acfivities in eastern North Carolina (Divisions 1-8), as proposed, are not
likely to jeopardrze the continued existence of the NLEB."
Signature: � I � ��� /a "`�-�N/I ��
Print Name: .�• � • I"l,� �l5
Title: .I I�ViSiOV� ���fiVle�i�
Attachment G, Low/Minimal Impact
� ••- '' • - �. . --�
TIP NO N�A
WBS Element No. neP.ze.so
Couniy Guiltord
Bridge Number 4002�0
DeSc�iption Bridga No.9� ove� Litlle Alamance Creek on (SR3124)
Basin Cape Fear (Jordan)
Ciassificatlon WSIV; NSW
Stream SIN 16t&&(o.5)
Type Perenniel
SIZ¢ 20'-90'wide;l0'd5'bankheighl
Typ¢ TIMBER OECK ON APP:TIMBERJOISTS, MAIN:I-BEAMS S DOUBLE CHANNEL
F�cisting StluCtUle Size 1Q18'3',1(1a,29'0",1@t]'0"
Suff. Rating 33z
Type 24" Coretl Slab Bntlge
Proposed Structure
Size i @ �0 fl.
USACE (LF) 48 LF pertnanent
Stream NCDW�Impacts(LF) � 46LFpermanenl
USACE Impact5 (AC) �0.01 pertn.fill, a0.01 machanizetl cleanng
Wetlands Non 4041mpacts (AC) o
CAMA Impacfs (SF) No '
NC DWQ Buffers Impacis (SF) 6,50� sq. fl. zone �, 3,826 sq.fl. Zone 2
BufferApplicaton Required (Y/N) Yes
State Stormwater Permit Requl�ed (YIN) No
Habitat Bald Eagle: No Small whorled Yes
pogonia
T8E SpeciesPresent No
Bald Eagle: NoEHect Small whoded �Ert�;�m�PR��
Bio Conclusion pogonia
Type None
Moratorium
Dates None
Native/Hatchery No
Trout Species Present No
Trout Waters Trou[ Conditions (YIN) No
WRC Reviewer N/A
CAMA AECs No
Essential Fish Ha6itaf No
Nav. Opening No
❑SCG Permlt No
Historic Propel'tles No
.4�Ghaeological Resources � �� No � � �� �
Tribal Lantls No
4(Q Resources No
6(� [LWCF] Resources No
Wild and Scenic River No
Federal Lands No
NA Area No
FEMA Buyout No
FEMA Flood Study Yes
USTs Haz Mats No
Relocatees None
LAT 36D54o81
Location LONG -19.631015
ProjectComments � — Nona �-� -.
Completed by: ���� B` r"'—� Date: Z- ��� �
Lead Enginee .
�:ifA_ ` �(i��A''\ Date: ,��^ �^' !
Divisi�on E ironmental Officer
�