Loading...
HomeMy WebLinkAbout20050949 Ver 2_Stormwater Info_20080716viM`KRvi&cizEED To: Ms. Annette Lucas 2321 Crabtree Blvd Raleigh NC, 27604 ATTENTION: Ms. Annette Lucas t35-UQ4Pt V2, LETTER OF TRANSMITTAL DATE: July 16, 2008 PROJECT NO: 03403-0001 TASK NO: 1 RE: Partners Equity Subdivision TRANSMITTAL NO: PAGE 1 OF 1 WE ARE SENDING: ? Originals ® Prints ? Shop Drawings ? Samples ? Specifications ? Calculations ? Other - Quantity Drawing No. Rev. Description I Status 6 I I I Report and Plans for Partners Equity Stormwater Improvements I G Issue Status Code: A. Preliminary B. Fabrication Only C. For Information D. Bid E. Construction F. For Review & Comments G. For Approval H. See Remarks Action Status Code: 1. No Exceptions Taken 2. Make Corrections Noted 3. Other 4. Amend & Resubmit 5. Rejected - See Remarks REMARKS: Please feel free to contact us if you have any questions regarding the plans or our responses, 919- 233-8091. 200 MacKenan Court, Cary, NC 27511 919/233-8091 Fax 919/233-8031 cc: McKIM & CREED, PA oU9 Ppn ° JUL 16 200§igned onathan Hinkle, El S:\3403-Partners Equity Group\0001\10-Comm\LOT_20080716.doc DENR-WAT?ERUUAUTY cti? Updated2-15-07 4.' ''11 STORMWATLR BRAN 1 L r 1 July 16, 2008 Annette Lucas 2321 Crabtree Blvd Suite 250 Raleigh, NC 27604 ENGINEERS DS_ OrtIA ??SURVEY0RS Vl` PLANNERS M&C: 03403.0001 (40.48) RE: 401 WQ certification Partners Equity Group Subdivision ' Dear Ms. Lucas: ' Enclosed you will find five copies of the supplemental information which your office has requested in support of the 401 WQ certification application/ PCN submitted for the Partners Equity Group Subdivision in Smithfield, NC in ' December 2007. The enclosed documents should be considered supplemental to the original application. Please do not hesitate to contact me if you have any questions concerning these documents. ' Sincerely, ' McKIM & C ED A. ' nathan T. Smith PE, CPSWQ CPESC ' cc: file John Shallcross ' Venture IV Building Suite 500 111 `, 1 730 Varsity Drive , 1 l Raleigh, NC 27606 w? ? ? ,looi"? H tir ??F;,;?k??P?Rt3EtPNG ' ?IPNOS WO r?jC1R V? ' 919.233.8091 Fax 919.233.8031 v MCKIM&CREED v www.mckimcreed.com PARTNERS EQUITY GROUP SUBDIVISION STORMWATER MANAGEMENT NARRATIVE FOR NCDWQ 401 CERTIFICATION PARTNERS EQUITY GROUP SUBDIVISION SMITHFIELD, NC MCE#: 3403.0001 Project Manager: Jonathan Smith, PE July, 2008 PREPARED FOR: PARTNERS EQUITY GROUP P.O. BOX 1089 SMITHFIELD, NC 27577 OFFICE: (919) 934-3852 PREPARED BY. MCKIM & CREED, PA 1730 VARSITY DRIVE, SUITE 500 RALEIGH, NC 27606 OFFICE: (919) 233-8091 FAX: (919) 233-8031 v McKIM&CREED v DWQ USE ONLY Date Received Fee Paid Permit Number ' State of North Carolina Department of Environment and Natural Resources Division of Water Quality ' STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION ' 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): Partner's Equi , Group ' 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Mr. John Shallcross, jr ' 3. Mailing Address for person listed in item 2 above: P.O. Box 1524 City:Smithfield State:NC Zip:27577 Phone: (919 1 934-3852 Fax: ( 1 11 H Email:jshallcrossjr@aol.com 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Partner's Equity Group Subdivision 5. Location of Project (street address): North Equity Drive City:Smithfield County:Tohnston Zip:27577 6. Directions to project (from nearest major intersection): From intersection of NC HWY 210 (East Market Street) and Industrial Park Drive head east on Industrial Park Drive (approx. 0.25 miles), Turn north onto North Equity Drive, Site is located approx 0.20 miles down North Equity Drive. 7. Latitude:35° 31' 31" N Longitude:78° 19' 09" W 8. Contact person who can answer questions about the project: of project Name Jonathan Smith, PE; McKim and Creed Telephone Number: (919- ) 233-8091 Email:jsmithQmckimcreed.com II. PERMIT INFORMATION: Form SWU-101 Version 03.27.08 Page 1 of 4 1. Specify whether project is (check one): ?New ?Renewal ®Modification ' 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numberDWQ #970656 and its issue date (if known)unknown 3. Specify the type of project (check one): ?Low Density ?High Density ?Redevelop ?General Permit ?Universal SMP ?Other 4. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ' ?CAMA Major ?Sedimentation/Erosion Control ®404/401 Permit ?NPDES Stormwater III. PROJECT INFORMATION ' 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. ' Retrofitting existing stormwater management system to meet current NSW 401 certification requirements see attached narrative. ' 2. Stormwater runoff from this project drains to the Neuse River basin. 3. Total Property Area: 45.3 acres 4. Total Wetlands Area: 2.64 acres 5. 100' Wide Strip of Wetland Area: acres (not applicable if no wetlands exist on site) ' 6. Total Project Area**: acres 7. Project Built Upon Area: % 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. For high density projects, complete the table with one drainage area for each envineered stormwater device. 1 Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Buffalo Creek Stream Class & Index No. C;NSW Total Drainage Area (so 2,217,204 On-site Drainage Area (so 1,973,268 Off-site Drainage Area (so 243,936 Existing Impervious* Area (sf) Proposed Impervious*Area (sf) % Impervious* Area (total) Impervious* Surface Area Drainage Area 1 Drainage Area 2 On-site Buildings (so On-site Streets (so On-site Parking (sf) On-site Sidewalks (so Other on-site (so Off-site (so Total (so: Form SWU-101 Version 03.27.08 Page 2 of4 1 * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. This is the area used to calculate percent project built upon area (BUA). 10. How was the off-site impervious area listed above derived?Impervious area for entire site was assumed to be 70% as a conservative estimate. IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htm - deed restrictions. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitt ed for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forrris.htm. Form SW401-Low Density Form SW401-Curb Outlet System Form SW401-Off-Site System Form SW401-Wet Detention Basin Form SW401-Infiltration Basin Form SW401-Infiltration Trench Form SW401-Bioretention Cell Form SW401-Level Spreader Form SW401-Wetland Form SW401-Grassed Swale Form SW401-Sand Filter Form SW401-Permeable Pavement Low Density Supplement Curb Outlet System Supplement Off-Site System Supplement Wet Detention Basin Supplement Infiltration Basin Supplement Underground Infiltration Trench Supplement Bioretention Cell Supplement Level Spreader/ Filter Strip/ Restored Riparian Buffer Supplement Constructed Wetland Supplement Grassed Swale Supplement Sand Filter Supplement Permeable Pavement Supplement Form SWU-101 Version 03.27.08 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http://h2o.enr.state.nc.us/su/msi_ms sp htm) ' 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. I ' 'al • Original and one copy of the Stormwater Management Permit Application Form • Original and one copy of the Deed Restrictions & Protective Covenants Form (if required as per Part IV above) ' • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 (Express: $4,000 for HD, $2,000 for LD) P_ ". - payable to NCDENR ,VIA ^?j10s1i? • Calculations & detailed narrative description of stormwater treatment/ management Q V-4- - Copy of any applicable soils report ALA. • Two copies of plans and specifications (sealed, signed & dated), including: - Development/ Project name ' - Engineer and firm -Legend - North arrow ' - Scale - Revision number & date - Mean high water line - Dimensioned property/ project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated ' - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. (ex. designing engineer or firm) ' Designated agent (individual or firm):McKim & Creed: co Tonathan Smith Mailing Address:1730 Varsity Drive, Suite 500 City:Raleigh State:NC Zip:27606 Phone: (919 ) 233-8091 Fax: (919 ) 233-8031 Email:jsmith@mckimcreed.com VIII. APPLICANT'S CERTIFICATION ' I, (print or type name of person listed in General Information, item 2) Mr. John Shallcross, jr certify that the information included on this permit application form is, to the best of my knowledge; correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions ' and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H.1000. Form SWU-101 Version 03.27.08 Page 4 of 4 Signature. Date: 7' ?(? -O r 0 Partners Equity Group Subdivision Stormwater Management Narrative For NCDWQ 401 Certification Introduction The Partners Equity Group Subdivision encompasses 45.3 acres of commercial lots and associated transportation areas in Smithfield, NC. The subdivision is located to the Northeast of the intersection of NCSR 2398 and Venture Drive within a 50.9 acre watershed that drains to Buffalo creek, a tributary to the Neuse River Basin. There are 19 commercial lots in Partners Equity subdivision. The majority of these lots are currently occupied or are in various states of development. Two lots, however (Lots 18 and 19) have not been developed due to areas which have previously been classified as jurisdictional wetlands. This project involves the limited development of portions of lots 18 & 19 resulting in impacts to 1.53 acres of wetlands. It should be noted that development on lots 18 and 19 has been minimized and configured to retain a contiguous area of wetlands along the boundary of these two lots and lots 10 and 11 to the east (see exhibits). Project History 401 WQ certification was originally approved for the Partners Equity Subdivision (as project # 970656) on February 110,, 1998. Extensive research and document tracking was conducted in order to understand the project history and obtain original design parameters. Unfortunately, due to the time which has elapsed since the original 401 ' certification permit was approved, a limited amount of the original application documentation has been located. As a result, information regarding the existing ' conditions of the stormwater management system is based principally on construction drawings prepared in 1999 and supplemented by information provided in a series of communications between the NCDWQ wetlands unit staff and McKim & Creed staff ' between 1998 and 2001. We understand that at the time of original permitting the project was required to meet the section 401 WQ certification requirements in place at that time. To meet these needs a system of vegetated conveyances was designed to route stormwater runoff from individual parcels and into the single large treatment pond at the northeast corner of the project site. This pond was designed to meet both 401 WQ requirements as well as Town of Smithfield stormwater management requirements. We ' understand that 401 WQ certification requirements at that time included treatment and removal of 85% of TSS. This performance standard was accomplished via the stormwater wetpond. The vegetated conveyances were not included in any calculations Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 of pollutant removal. Information concerning the existing condition of the wetpond and ' associated drainage system from the sources described above is summarized below. This information was used where appropriate to determine potential nitrogen removal performance of the existing and proposed stormwater management system "Bottom Elevation =140.00 ft ' Permanent Pool Elevation =143.00 ft Temporary Pool Elevation =145.35 ft Permanent Pool Area = 49,658 sf Drainage Basin = 50.9 acres Impervious Area = 20.4 acres ' Permanent Pool Volume = 89,394 cf Temporary Pool Volume = 281,569 cf Forebay Volume =19,846 cf" R fitti th E i ti t M S S ro ng e e x s ng tormwater anagement ystem In the intervening years since the project was originally approved 401 WQ certification requirements have changed significantly. We understand that current NC 401 WQ certification rules require that projects located within NSW watersheds and resulting in ' impacts to jurisdictional waters must be designed with stormwater BMPs which have been shown to remove nitrogen from runoff with a removal efficiency of 30%. Discussions with NCDWQ staff have revealed that any activities which result in impacts ' to the remaining wetlands on the Project site. Currently, the only stand alone BMP's which have been approved to meet this standard per NCDENR BMP manual (NCDENR ' 2007) are stormwater wetlands, bioretention areas, and wetponds used in conjunction with forested filter strips. Each of these BMP types have certain configuration requirements related to dimensions, configuration, and other design parameters which are necessary in order to be credited with the required 30% Nitrogen removal threshold. As a result of the pre-existing drainage network, configuration of existing development areas, and other site conditions these three pre-approved BMPs are not suitable for use in meeting the requirement for the Partners Equity Group Subdivision. t Difficulties lie in modifying the existing drainage infrastructures and overall sizing since a significant portion of the subdivision is currently either built or under construction. In addition a number of parcels within the subdivision have been sold and are no longer ' owned by the applicant. The design team has taken every effort to look at methods of modifying just the existing pond to get it up to the standard (30% removal of Nitrogen) and found the existing pond to be unsuitable to meet this goal. The pond discharges 1 directly into an existing conveyance channel with no opportunity to utilize a forested ' 2 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits ' July, 2008 filter strip. Conversion of the existing wetpand into a stormwater wetland is not possible ' due to the limited space available adjacent to the pond. Lastly the project site is not a suitable candidate for bioretention concerns over high groundwater and difficulties in retrofitting bioretention cells into existing drainage easements and property ownership ' issues. Where stand alone BMPs aren't suitable to meet pollutant reduction requirements, the ' use of multiple BMPs can be used to enhance overall pollutant removal performance based on the performance of each BMP type. This improvement is a result of the various treatment processes that each BMP uses to treat stormwater. We propose that the existing drainage infrastructure with enhancement of existing facilities as described will be capable of obtaining and/or exceeding 30% reduction of Nitrogen from stormwater runoff. Existing Stormwater System ' Currently, stormwater runoff originating on the site is routed via open conveyances into a manmade pond at the northeast corner of the 50.9 acre watershed. Due to the fact the ' watershed is currently under construction obtaining an impervious percentage for the watershed is not only difficult but also would not accurately depict the ongoing development of the project area. Local planning regulations as administered by the ' Town of Smithfield Planning Department restrict individual lot imperviousness to not greater than 70% (Embler 2008). Therefore the use of 70% imperviousness as a runoff ' calculation input would represent the most conservative methodology for sizing of Stormwater BMP required volume. This imperviousness was used as an input parameter for all water quality calculations. It should be noted that the use of 70% ' imperviousness for calculation purposes does not indicate actual imperviousness of the project area but only maximum imperviousness allowed by local regulations. ' Wet Ponds are typically designed to detain and release, over a 2-5 day period, a water quality volume equal to the runoff from the 1" rainfall event. This component of the wet pond is generally called the temporary water quality volume. Based on the construction documents and other project information as described above, the temporary water quality storage for the pond at site is 147,247 cu ft. The required water quality volume ' (WQV) for the 50.9 ac watershed is approximately 125,642 cu ft as calculated using the Simple Method detailed by NCDENR( 2007, DRAFT). Therefore, the temporary water quality storage of the Partners Equity pond exceeds the NCDENR volume requirement standards by a minimum of 17%. In other terms the effective Temporary Water Quality ' storage in the existing pond is equivalent to the R/O associated with a 1.17" Rainfall. Note that the required water quality volume calculation is based on the maximum ' impervious limit for the entire 50.9 acre drainage basin (70% impervious). However, ' 3 r 1 1 11 1 1 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 BUA for each lot may be lower than this level. In addition, the proposed BUA for Lots 18 and 19 are both less than 70%. Therefore, the use of 70% imperviousness for calculation purposes is a conservative means of calculating WQV. Table 1: Wet Detention Basin Existing Condition Parameter Value Units Watershed Area 50.9 Acres % Impervious 70* n/a Permanent Pond Elev 143 Ft Permanent Pond Volume 92,678 Cu ft Temporary Pool Elev 145.35 Ft Temporary Pool Volume 239,925 Cu ft Temporary Water QualiStora e(WQS) 147,247 Cu ft Required Water Quality Volume** (WQV) 125,642 Cu ft Temporary WQS Equivalent Rainfall 1.17 In. * Maximum allowable impervious area per Town of Smithfield planning dept ( Embler, 2008) ** Per NCDENR design guidelines, R/O from 1" rainfall see design calcs attachment? Currently wetponds are credited with removing 25% of Nitrogen from stormwater runoff by NCENR. Other agencies and organizations credit wet ponds with higher removal efficiencies. Specifically the Center for Watershed Protection recently published a technical memorandum, "The Runoff Reduction Method", using the latest BMP performance data from the mid-atlantic region which credits wetponds with TN removal of 30% or more. The methodology also provides a mechanism for obtaining additional pollutant removal for various BMP types through the use of designs which exceed standard parameters. Wetponds for instance are credited with TN removal of up to 40% if certain additional design parameters are met. As mentioned previously, stormwater runoff originating in the 50.9 acre commercial development is routed to the wet detention pond via an extensive network of open conveyances periodically interrupted by driveway and road crossing culverts. This drainage network originates as shallow grassed swales (See fig 3-7). These headwater swales primarily occur between adjacent lots and exhibit slopes of less than 0.5 % and side slopes of 3:1-5:1. These swales feed into collector swales which generally occur adjacent to and on either side of North Equity and South Equity Drives (figs 8-12). These swales are slightly deeper than the headwater swales and are dominated by grassed vegetation. Some of these collector swales exhibit dense natural vegetation. 4 1 1 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 Collector swales from the majority of the watershed flow into one of two cross- connection "wet swales" which convey runoff from South Equity drive across the center of the development to North Equity Drive and into the wet detention pond (figs 9-10). These "wet swales" are generally deeper than upstream conveyances and are dominated by cat-tails, rushes, and other diverse vegetation. These swales were originally designed to provide additional flood control storage during large storm events. Observed standing water within these swales is estimated to range from 0-6". Similar to the grassed swales described earlier these connector swales were not originally intended to provide a water quality function. However, the low slope and presence of water have lead to the conditions which mimic a stormwater wetland. The location of the connector and cross-connection swales is shown on conceptual plan sheet 2. Additional information concerning the drainage network is detailed in the table below. Table 2: Drainage Conveyance System: Existing Condition Parameter Headwater Swale Connector Swale Cross-connection Swale (Wet Swale) Cumulative Length Unknown 5700 1000 (ft) Elevation Range (ft) 146+ 145-146 144-145 Typical Shape Triangular/Parabolic Parabolic/ Trapezoidal Trapezoidal Side slopes 3:1 + 3:1+ 2:1-3:1 Typical Width (ft) n/a 0-2 4-6 Slope (ft/ft) n/a 0-0.02 0-.001 Estimated Bottom n/a n/a 5000 Area (s ft) Typical Vegetation Grassed, Bare, Grassed Misc vegetation: Cattails cattails, rush, wax myrtle As shown in Table 2, swale elevations range from 143' to 147'. As mentioned previously during precipitation events the water level in the wet detention pond varies from permanent pool elevation (143') up to as high as 147' (during flood control events). As a result of the low slope and elevation of the swale system, portions of the swale system are inundated during larger events. This inundation of the wet swales and portions of the connector swales limits velocity of flow during larger events. During runoff caused by rainfall up to and including the water quality storm (1" rainfall) inundation of the open conveyances is limited to the wet swales. 5 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 Proposed Stormwater BMP Retrofits ' In order to improve the pollutant removal performance, particularly nitrogen, of the stormwater management system a number of improvements are proposed for the ' project site. These improvements focus on the existing stormwater wet pond and the connector swale between lots 14 -15 and Lots 13 -16. ' At the time of construction of the wet detention basin, littoral shelf design standards were poorly developed with guidelines generally suggesting water depths ranging from 0-12" and no guidance on required planting soil. Subsequent research and anecdotal experience has indicated that wetland plants do not survive well where normal depths exceed 6" and planted in poor subsoil conditions. The littoral shelf at the Partners Equity likewise exhibits poor vegetation on the basin edges (Fig 1-2). In order to improve the function of the wet detention basin so that it can attain maximum pollutant removal we propose to improve the existing littoral shelf by raising the bottom elevation of the littoral shelf so that it ranges from 142.5' to 143.5'. The soil to be used in raising this ' elevation will be of sufficient quality to ensure vegetation growth. In addition, obligate wetland species will be planted in the submerged portion of the improved littoral shelf ' on a spacing of 3' and a wetland planting mix will be applied to the non submerged portion of the aquatic shelf. Enhancement of the littoral shelf in this fashion will result in a wet detention pond which satisfies littoral shelf design parameters to achieve 25% ' nitrogen removal efficiency as detailed by the current NCDENR BMP design manual. After enhancement activities, littoral shelf area will be approximately 19,653 sq ft. Due to ' the unique configuration of the pond establishment of the littoral shelf results in a considerable portion of the total pond area in a vegetated state. As a result the proposed pond relies heavily on wetland removal processes to accomplish Nitrogen pollutant ' removal. We propose that the wet pond system be considered as a wetland/wet pond hybrid and have utilized the wetland supplement form in this documentation. Note that the modifications proposed with this project do not result in any changes to ' the wet pond configuration which would impact overall wet pond performance but are intended to enhance the nitrogen removal capabilities of the system. Calculations and plan sheets were developed using original construction documents and calculations. As-built conditions are only reflected in assessment of drainage system condition and vegetation establishment. Maintenance of Stormwater System ' All existing and proposed stormwater components discussed above are contained within existing drainage and utility easements. The easement surrounding the ' stormwater pond is held by the applicant (see exhibits) and an Operation and ' 6 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits ' July, 2008 Maintenance agreement was submitted during the original 401 WQ certification. The ' swales and other conveyances on-site have been dedicated to the Town of Smithfield and are maintained by the town. Nitrogen Removal Performance Grassed Swales are currently an approved Stormwater BMP for use in North Carolina (NCDENR 1999). When designed per required guidelines, swales are considered to remove 20% of Nitrogen originating from urban areas. They depend on infiltration, physical filtration by vegetation and adsorption to soil particles for pollutant reduction. As a result, water quality treatment is enhanced by vigorous vegetation and slow velocities. Current design guidelines require that grassed swales provide 100 linear feet of conveyance for each acre of development. Although the total length of headwater ' swales is unknown, linear swale length of all connector swales is approximately 5700' or 111' per acre of development. As a result, the length of connector swales within the development exceeds that required to achieve 20% nitrogen removal credit by 11%. Wet swales are an additional BMP type that combines the conveyance function of a ' swale with the improved pollutant removal function of stormwater wetlands. Wet swales, however, are not currently an accepted stormwater BMP in North Carolina. Some states and regions have accepted wet swales as pollutant removal structures. Yet there are only a few monitoring studies available for review in which wet swales were studied to determine pollutant removal (Strecker, 2003). Clayton and Schueler reviewed 2 monitoring studies and estimated TN removal associated with Wet swales of 40% (1996). Other reviewers have noticed similar removal efficiencies. Generally pollutant removal is believed to be enhanced by introduction of standard pollutant removal mechanisms into the wet swales including; temporary storage of runoff, diversity of ' species, and reduced velocity. Although design standards for wet swales vary widely, the design standards typically require that velocities are limited to less than 2 fps. This ' standard is very similar to accepted design standards for standard stormwater wetlands in North Carolina. Similarly the wet swales in the cross-connection ditches at Partners Equity resemble wetlands in many ways. There are many different design guidelines for ' wetlands including volume capture, depth/area, and surface area/ watershed area ration. Schueler suggests that shallow marsh wetlands should be sized so that wetland area is at least 2% of watershed area to provide sufficient treatment (Schueler, 1992). Sufficient ' treatment however is not defined in terms of nitrogen removal. Other research in North Carolina found that a shallow marsh wetland of 0.4 % of watershed area without a temporary storage component removed 20% of total nitrogen (Bass, 2000). Little information is available on wetlands with smaller area/watershed ration. The cross- connection "wet swales" at Partners Equity fall somewhat between exhibiting wet swale and shallow marsh wetland characteristics. We propose that pollutant removal of the ' 7 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits ' July, 2008 combination of wet swales and upstream vegetated swales is likely exceeding 10/° of ' nitrogen from upstream sources. Pollutant Removal Calculations: i P ll l ffi i d i f l B d b d utant remova o e c ency eterm nations or mu ti- MP systems are escri e as follows (NCDENR, 2007): E=A+B-[(A+B)/100] Where E= total pollutant removal efficiency (%) A= Efficiency of the First or Upstream BMP B=Efficiency of the Second or Downstream BMP As mentioned previously we propose to enhance the existing wet-detention pond so that ' design parameters are sufficient to achieve 25% reduction of nitrogen in runoff. In addition we propose that the existing grassed swales (in conjunction with existing wet swales) provide pollutant removal sufficient to achieve a minimum reduction of 10% of ' Nitrogen from stormwater runoff. As a result that pollutant removal achievable in the proposed stormwater management system will achieve or exceed the following: ' E=25+10-(25*10)/100 ' E=32.5 % It should be noted that these removal percentages are based on conservative estimates of performance for these BMP systems. ' Sediment and Erosion Control Measures will be taken to ensure that no sediment will leave the site during construction. All exposed surfaces will be seeded after final grades are established. The following practices will be implemented on this site: 1. Temporary and Permanent Seeding Temporary and permanent seeding will be used to establish a dense and ' vigorous ground cover in exposed soil areas. 1 8 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 2. Sediment Basin During construction activities the existing wet detention facility will act as a large sediment basin for these construction activities. Upon project completion accumulated sediment will then be removed from the BMP facility. 3. Outlet Stabilization Structure Outlet stabilization will be installed on the downstream end of the proposed driveway culvert to reduce the flow velocity and to dissipate energy Summary This project involves an impact to jurisdictional waters of 1.53 acres. In order to comply with existing 401 WQ certification rules the stormwater management system for the project site must be designed to remove 30% or nitrogen from stormwater runoff. Due to the existing condition of the existing development including infrastructure and multiple owners standard BMP stormwater management approaches are not suitable. A system of stormwater management is proposed using modified BMPs systems to address the 30% N reduction requirement using a combination of BMP types. As stated previously wet detention basins are "credited" by NCDENR to achieve 25% reduction of nitrogen runoff when designed to current NCDWQ standards, while grassed swales are "credited" to achieve 20% reduction in nitrogen when designed to current standards. We propose to enhance the existing wet detention pond with the modification of the existing littoral shelf to slightly raise the shelf elevation as well as establish diverse wetland species within the littoral zone. These enhancements will result in attainment of the design guidelines necessary to achieve maximum DWQ "credit". We also propose that the existing open conveyance system comprised of grassed headwater swales, grassed connector swales and "wet swales" achieves and exceeds nitrogen removal efficiency of 20%. As a result of these BMPs in series we believe that total nitrogen removal efficiency for the enhanced stormwater management system will exceed the required 30% reduction of nitrogen in stormwater runoff. The resulting stormwater management system will rely heavily on multiple pollutant removal mechanisms including physical filtration, plant uptake, and microbial nitrification and denitrification. The system will be comprised of a diverse natural system including; deep water, emergent aquatic wetlands, shallow land wetlands habitats, and dense vegetation conveyance swales. 1 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 ' References Bass, K. L., 2000. Evaluation of Small In-Stream Constructed wetland in North Carolina's Coastal Plain. Masters Thesis: North Carolina State University, Raleigh, NC Clayton, R, A and Schueler, T. R., 1996, Design of Stormwater Filtering Systems, Center for Watershed Protection, Ellicott City, MD Embler, Paul, 2008, Personal Communication. Hirschman, D., Collins, K., and Schueler, T., 2008, Technical Memorandum: Runoff Reduction Method. Center for Watershed Protection, Ellicot City, MD. NCDENR, 2007, NC Stormwater BMP Manual. North Carolina Department of Environment and Natural Resources, Raleigh, NC. NCDENR, 1999, Stormwater Best Management Practices, N.C. Department of Environment and Natural Resources, Raleigh, NC. Schueler, T. R., 1992, Design of Stormwater Wetland Systems: guidelines for creating divers and effective stormwater wetlands in the mid-Atlantic region. Anacostia Restoration Team, Metropolitan Washington Council of Governments., Washington, DC. i Strecker, E. W, Quigley, M. M, and Urbonas, B., "A Reassessment of the Expanded EPA/ ASCE National BMP Database." In: Proceedings of the World Water and Environmental ' Congress 2003, June 23-26, 2003, Philadelphia, PA Edited by Paul Bizier and Paul DeBarry, ISBN 0-7844-0685-5, ASCE, Reston, Va. 10 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 Representative Photo's from Project Site ,y ?'!y ."u i+?l ? ? SI?J ? 14911 '`' 1) View of outlet structure from west bank of pond January 2007 11 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 12 2) View of southeast corner of pond from west bank January 2007 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 13 3) View of existing "feeder swale" between Lot 2 and 3 looking west. January 2007 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 1 4) View of existing feeder swale between lots 2 and 3 looking west. June 2007 1 14 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 5) View of junction of "feeder" swale and connector swale along South Equity Drive looking northwest. June 2007 15 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 7) View of "feeder swale" between Lots 3 and 4 looking west from South Equity drive January 2007 16 6) View of perimeter "feeder" swale along northwest corner of project site looking east. January 2007 1 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 i 8) View of Road swale along West side of South Equity drive looking south January 2007 v 9) View of road swale along west side of South equity drive looking south January 2007 17 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 18 10) View of Connector swale along south Equity Drive looking north. June 2007 Partners Equity Group Subdivision ' Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 1 1 12) View of "Cross connection wet swale" between lots 15 and 16 looking east January 2007 19 11) View of road swale on East side of North Equity Drive looking south January 2007 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 20 13) View of Cross-connection swale between lots 15 and 16 looking east. June 2007 14) View of Cross-connection "Wet Swale" Between 16 and 17 looking east January 2007 Partners Equity Group Subdivision Stormwater Management Narrative Proposed Stormwater BMP Retrofits July, 2008 21 15) View of Cross-connection swale between lots 16 and 17 looking east June 2007 Permit Number: ' (to be provided by DWQ) Oby D W AT?RO MANTULL-iL ' NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must also be filled out, printed and submitted along with all of the required information. L PROJECT INFORMATION Project name Partners Equitiy Subdivison Stormwater Management Contact name Jonathan Smith Phone number (919)233-8091 Date Drainage area number 111. DESIGN INFORMATION Site Characteristics Drainage area 2,217,204.00 ftz Impervious area 1,552,042.80 ft Percent impervious 70.0%% Design rainfall depth 1.00 inch Peak Flow Calculations 10-yr storm runoff depth 5.80 in 10-yr storm intensity 4.73 in/hr Post-development 10-yr storm peak flow 212.00 ft3/sec Velocity Maximum non-erosive velocity (peak 10-year storm) 5.50 ft/sec Soil characteristics (enter "x" below) Sand/silt (easily erodible) Clay mix (erosion resistant) X Grass Type (enter 'Y' below) Bermuda Tall fescue X Bahiagrass Kentucky bluegrass Grass-legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Conveyance Swale, Seeking Pollutant Credit: Y (Y or N) Maximum velocity for 10-yr storm 5.50 ft/sec Insufficient maximum velocity. Side slopes 3.00 :1 Insufficient side slopes. Max is 5:1. Swale length 5,700.00 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and II 'Project Design Summary, Page 1 of 2 I Swale Characteristics Swale Shape: Enter an 'Y' in the appropriate cell below: Trapezoidal Parabolic V-shaped ' Width of the bottom of the swale Width of the top of the swale Additional Information Is the swale sized for all runoff from ultimate build-out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? ' What is the distance from the bottom of the swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the swale? What is the SHWT elevation? What is the longitudinal slope of the swale? What is the depth of freeboard? ' Form SW401-Grassed Swale-Rev.3 Permit Number: (to be provided by DWQ) X 12.00 ft Y (Y or N) Insufficient sizing Y (Y or N) Insufficient ROW location. 145.00 ft OK 147.00 fmsl 145.00 fmsl fmsl 0.23% OK ft Parts I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Init' Is Pagel Plan Sheet No. Cf? eZ 1. Plans (1" = 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), ' - Grass species, and • - Boundaries of drainage easement. ' CZ 2. Plan details (1 - 50 or larger) for the grassed swale showing: - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build-out, - Grass species, - Off-site drainage (if applicable),and - Boundaries of drainage easement. C Z- 3. Section view of the grassed swale (1" = 20' or larger) showing: ' - Side slopes, - Longitudinal slope, - Freeboard - Swale dimensions, and - SHWT level(s) ' a 4. Supporting calculations (including maximum velocity calculations for applicable storms) N.h% 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. ' A1154, 'V- t 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 1 awn NCDENR Permit Number (to be provided by DWQ) o?oF W a rF9o o -~c STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WETLAND SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all the required information. 1. PROJECT INFORMATION Project name Partner's Equity Subdivision Stormwater Management Contact name Jonathan Smith ' Phone number (919)233-8091 Date Drainage area number Wet Pond ' II. DESIGN INFORMATION Site Characteristics Drainage area 2,217,204.00 ft2 Impervious area 1,552,042.80 ftZ ' Percent impervious 70.0%% Design rainfall depth 1.00 inch Peak Flow Calculations ' 1-yr, 24-hr runoff depth 3.20 in 1-yr, 24-hr intensity 0.13 in/hr Pre-development 1-yr, 24-hr runoff 28.00 ft3/sec Post-development 1-yr, 24-hr runoff 123.00 ft3/sec Pre/Post 1-yr, 24-hr peak control 95.00 ft3/sec Storage Volume: Non-SR Waters Design volume (temporary pool volume) 147,247.00 ft3 OK Depth of temporary pool/ponding depth (DP,,,,,,) 28.20 in Insufficient depth of temp. pool. Drawdown time 2.46 days OK Diameter of orifice 6.00 in Drawdown orifice diameter may be insufficient. Please provide adequate supporting calculations. Coefficient of discharge (Co) used in orifice diameter 0.60 (unitless) calculation Driving head (Ho) used in the orifice diameter calculation 2.10 ft OK Storage Volume: SR Waters Parameters 1-yr, 24-hr depth in Pre-development 1-yr, 24-hr runoff fts Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided fts 1 Form SW401-Wetland-Rev.2 Parts I and 11. Project Design Summary, Page 1 of 3 Permit Number (to be provided by DWQ) ' Surface Areas of Wetland Zones Surface Area of Entire Wetland 55,725.00 ft2 Insufficient wetland surface area. Shallow Land 10,157.00 ft2 Insufficient shallow land area. The shallow land percentage is: 0.18% ' Shallow Water 10,762.00 ft2 Insufficient shallow water area. The shallow water percentage is: 0.19% Deep Pool Forebay portion of deep pool (pretreatment) 6,355.00 ft2 OK The forebay surface area percentage is: 0.11 % Non-forebay portion of deep pool 28,451.00 ft2 Insufficient non-forebay deep pool area. The non-forebay deep pool surface area percentage is: 0.51 % Total of wetland zone areas 55,725.00 ft2 OK Add or subtract the following area from the zones 0.00 ft2 ' Topographic Zone Elevations Temporary Pool Shallow Land (top) 144.00 fmsl Permanent Pool Shallow Water (top) 143.00 fmsl Deep Pool (top) 142.50 fmsl Most shallow point of deep pool's bottom 140.00 fmsl Deepest point of deep pool's bottom 140.00 fmsl Design must meet one of the following two options: This design meets Option #1, (Y or N) Deep pool is 6inches below SLWT, If yes: SLWT (Seasonally Low Water Table) fmsl This design meets Option #2, Has a clay liner If yes: Depth of topsoil above clay liner in Topographic Zone Depths Temporary Pool Shallow Land 28.20 in Insufficient shallow land depth. Permanent Pool Shallow Water 6.00 in OK Deep Pool (shallowest) 30.00 in OK Deep Pool (deepest) 30.00 in OK Planting Plan ' Are cattails included in the planting plan? N (Y or N) OK Number of Plants in planting plan recommended: Herbacious (4'inch diameter) 1,674 Shrubs/small trees (1 gallon or larger) 1,116 Trees (1.5" dbh) 279 Number of Plants in planting plan provided (several species of each plant type are recommended): Herbacious (4'inch diameter) 5,230 OK Shrubs/small trees (1 gallon or larger) 0 Higher density is recommended. Trees (2.5" dbh) 0 Higher density is recommended. J Form SW401-Wetland-Rev.2 Parts I and 11. Project Design Summary, Page 2 of 3 Additional Information Can the design volume be contained? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? ' What is the length of the vegetated filter? Are calculations for supporting the design volume provided in the application? Is BMP sized to handle all runoff from ultimate build-out? Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? The length to width ratio is: ' Approximate wetland length Approximate wetland width Approximate surface area using length and width provided ' Will the wetland be stabilized within 14 days of construction? Form SW401-Wetland-Rev.2 Permit Number (to be provided by D WQ) Y (Y or N) OK Y (Y or N) OK 0.00 ft Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK 14.84 :1 OK 950.00 ft 64.00 ft 800.00 ft2 60 This approx. surface area is within this number of square , feet of the entire wetland surface area reported above: (Y or N) Parts I and II. Project Design Summary, Page 3 of 3 Permit No. (to be provided by DWQ) 111`. REQUIRED: ITEMS CHECKLIST ' Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a ' requirement has not been met, attach justification. iti s Pagel Plan Sheet No. i C'Z, ts'e.3 .Li) n V?Y CS D e 5- All wetlands: Shallow land depth, shallow water depth, deep pool depth Option 1, no clay liner: SLWT depth Option 2, clay liner: Depth of topsoil on top of liner, liner specifications az a4kc1*J Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Wetland dimensions (and length to width ratio), - Pretreatment system, - Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the wetland showing: - Wetland dimensions (and length to width ratio) - Pretreatment system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build-out, - Off-site drainage (if applicable), - Overflow device, and - Boundaries of drainage easement. 3. Section view of the wetland (1" = 20' or larger) showing: - Side slopes, 3:1 or lower - Wetland layers 4. A detailed planting plan (1" = 20' or larger) prepared by a qualified individual showing: . - A variety of suitable species (not including cattails), - Sizes, spacing and locations of plantings, - Total quantity of each type of plant specified, - A planting detail, - The source nursery for the plants, and - Fertilizer and watering requirements to establish vegetation. 5. A construction sequence that shows how the wetland will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations (including drawdown calculations). 4i)Cc415? 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. a46kftJ nr. A- SW401-Wetland-Rev.2 8. A copy of the deed restrictions (if required). 9. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Part III, page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 Project: Partners Equity Stormwater Improvements • Project No.: 3403-0001 v? M?IQM&CREED Client: Partners Equity Group Location: Smithfield, NC Designer: KAB Date: 11,28.07 Reviewer: JTS Date: 12.04.07 Objective: Determine Water Quality Volume (WQV) using Simple Method TVQv = P * Rip * A 12 Rip = 0.05 + 0.009 Ia Given: Find: Rainfall depth 1 in Rv 0.68 in Wtrshd Area 50.9 ac WQV 125,642 cu ft Impervious % 70 % * * Conservative estimate based on maximum built upon area per Town of Smithfield requirements. Objective: Given current Water Quality Storage (WQS) volume, Find Rainfall equivalent (Simple Method) Given: Find: Perm Pond Vol 89,394 cu ft Temp WQS 147,247 cu ft Temp Pond Vol 281,569 cu ft Rain equiv 1.17 in Findings: Existing pond conditions provide enough temporary storage to meet NCDENR design guidelines (runoff from 1" rainfall). Temporary WQS is equivalent to runoff associated with a 1.17" rainfall. It, F ••? ow O w \~ INAN llrl 1?1, 1/ l? 1 1 1 1 1 Project: t N P Partners Equity Stormwater Improvements 3403 0001 4& McIQM&CREED rojec o.: - v? Client: Partners Equity Group Location: Smithfield, NC Designer: KAB Date: 11.28.07 Reviewer: JTS Date: 12.04.07 Objective: Verify existing BMP storage capacities and ability to meet NCDENR design criteria. Determine Wet Detention Basin storage (Average-end storage volume calc.) Elev ft Areas * Avg Areas Vol c Comments 140.00 21,637 141.00 26,835 24,236 24,236 142.00 32,240 29,538 29,538 143.00 45,568 38,904 38,904 Normal Pool (Const. Plans 7/14/99) 144.00 55,725 50,647 50,647 145.00 79,620 67,673 67,673 145.35 85,684 82,652 28,928 Temp Pool (Const. Plans 7/14/99) 92,678 Permanent Pool Storage Volume 147,247 Temp Storage Volume 239,925 Total Storage Volume (Perm + Temp) * Source Data: Released for construction plans prepared by McKim & Creed, 1999 i i Project: Partners Equity Stormwater Improvements V Project No.: 3403-0001 .? MCFaM&CREED Client: Partners Equity Group Location: Smithfield, NC Designer: JDH Date: 7/16/2008 Reviewer: JTS Date: 7/16/2008 Objective: Determine the Time of Concentration for the project site Time of Concentration Calculation SCS Segmental Method Tc to Wet Pond Sheet Flow Segment ID AB 1. Surface description (Table 3-1) dns grass 2. Manning's roughness coeff., n (Table 3-1) Hi Pt 154 0.240 3. Flow length, L (Total < 300 ft) Lo Pt 150 ft 40 4. Two-year 24-hour rainfall, P in 3.7 5. Land slope, S T, = 0.007(nL)O.8 ft/ft 0.100 6. Travel time, T t P hr 0.06 Shallow Concentrated Flow Segment ID BC 7. Surface description (Paved or Unpaved) Paved 8. Flow length, L Hi Pt 0 ft 0 9. Watercourse slope, S Lo Pt 0 ft/ft #DIV/0! 10. Average velocity, (Figure 3-1) a; = 20.3282( ft/sec #DIV/0! 11.Travel time, T = 16.1345(1-7 V hr 0.00 „ Storm Culvert Channel Flow Segment ID CD 12. Cross sectional flow area, A ft^2 628 13. Wetted perimeter, P ft 12.56 14. Hydraulic radius, R = ft 0.5 15. Channel slope, S S=N/A ft/ft 0.0023 16. Manning's roughness coeff., n 0.0013 17. Channel velocity, V ft/sec 34.6 18. Flow length, L v = 1.49R-7; ft 84 19.Travel time, T t n hr 0.00 Drainage Channels Segment ID DE 12. Cross sectional flow area, A ft^2 20 13. Wetted perimeter, P ft 16.65 14. Hydraulic radius, R = ft 1.20 15. Channel slope, S S=N/A ft/ft 0.0023 16. Manning's roughness coeff., n 0.05 17. Channel velocity, V ft/sec 1.61 18. Flow length, L V = 1.49R"'s"' ft 840 19.Travel time, T t n hr 0.14 Connector Channels Segment ID EF 12. Cross sectional flow area, A ft^2 20 13. Wetted perimeter, P ft 16.65 14. Hydraulic radius, R = ft 1.20 15. Channel slope, S S=N/A ft/ft 0.0023 16. Manning's roughness coeff., n 0.08 17. Channel velocity, V ft/sec 1.01 18. Flow length, L v = 1.49R2"1-"2 ft 500 19.Travel time, T t n hr 0.14 Time of Concentration = 20 min Lag Time = (0.6)(Tc) = 12 min 0 1 1 1 1 Project: Partners Equity Stormwater Improvements Project No. 3403-0001 Client: Partners Equity Group Location: Smithfield, NC Designer: JDH Date: 7/16/2008 Reviewer: JTS Date: 7/16/2008 v McKIM&CREED Objective: Determine the SCS Curve Number for the project site. Curve Number Calculation SCS Method Landuse Soil Group RCN Area Product of RCN Commercial B 92 13.4 1231.5764 Commercial C 94 12.6 1186.5808 Commercial D 95 24.9 2364.5595 Totals Total (Weighted) Curve Number =Total Product/Total Area Estimated Curve Number 50.9 93.96 94 4782.7 OD Cl) O .15O O N ? ? N f? N a T N Z ro N V of In lO O O 7 N 0U) N O T(n N Z j 3 :- (n ? 0 Q. (n 00 -0U a? m 0 (U O Z 0 0 0 0 O 0 N O N 0 o N C0 f`0 y ? N w C zQ ZU ?,11 m cm O m U ? L O m O > Z? T L 7 C Un p T O w, Cy o W o N C L C O ? ? m oa d O U () (D CL O M O 01 U 2 N a) Q m m p j a) Frf L c? o a > --mo w a)-0 c o E m O N 0) 0 co M cn (D O U) 7 -E C M E _ U a) cn d m Q > m C N O i (D U O M _ O m E N L p O m >` a m E N C > j (n U m U ?p N N a) p t/1 w w «+ H p Em m , a)a) N Z N CO y cE Q d a) a) a a) o C 3 U. ? O Z M -O (- L a N 3 m `? O a) N Z U) ? L) C O CL N 0 a) C Q -6 O m L m 3 ai "A 2 a _? C a) w :? o O) o o. v > m `_ m LL 0 m a) 0 0? 0 (uaN 3 Eo U= cc o a E? m a) a)?E9 Z -0 a) co O) Q) L o w L p p N .N m O tm/1 m a ??? _ 2 o> 3 ?O-L(n Q O C6 J 2 N Y) L C A) T O.TY Ztt E a)- O O N O m CD 16 E 7 m N E d a) T m N 2 ? Q ' O 'O c O N m N FL N o C/) (n O a j C m a) m N L C a4 p- m N 'C - , n O) a) O O C O O N Q m 0 0 .L-. m O c .S E rn3 o. ) U) -o ?5 -0 p O_ a) w> Cn (D _ Z a) o 'p_ a) m OR a) ._ m O> O E O O O U) 3: L O HL _ O O C/) U) m in a) E E L p F- 0.E o O N m N Q O O C m U m m L T Cn >^ 0 0 H ? cl N m a ? m = N °) m 3 m y a m N a o n Cn m m C C m E m O 2 ?, a) T LL O 0 a) w H N m 0 a) m m N 0 - d) it al N N > _ O c C7 C'/) O U - > O v) O E! U) M n 0 -Oj O J d m U. O > v Z a L) "a \ O U 11 1 O N {4 LU n IffI ( O 'n O V a ? r LLl J Q o a a o co (n a) ' w d o m Q a `m p c c a d ns a O a °o n U) 3: o ca O O a) -Fo a 42 -6 ? cl 0 L?j a U n w a Q° ci ° 3 O _ a m a) a _ = Li L O a) C C O (D > O o o U Q U) > 3 T to ` '0 m > E2 w _C N O U -0 > L Y Q1 U_ a __ O + C U) o m m U U C7 U7 J J 2 2 :E a in? co w (n (n Un co (n u) m a c ? c - L) ® ?{ 4 O O ) + .. ICI o ?% a !li m p a co . Q cn 00 M O u O O N N ? a) O) r m a T m O N C3 T (? a) O Q ? O ?U m c O m z Q U ayi ` L ? N O = N a) ? > ? y C 7 m O Z U ?I' Soil Map-Johnston County, North Carolina Partners Equity Subdivision Map Unit Legend Johnston County, North Carolina (NC101) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI GoA Goldsboro sandy loam, 0 to 2 8.1 16.8 ' Gr Ly NoA Ud - - ' Totals for Area of Interest (AOI) USDA Natural Resources Conservation Service percent slopes Grantham silt loam 23.5 48.7% Lynchburg sandy loam 12.0 24.9%0 Norfolk loamy sand, 0 to 2 1.0 2.0% percent slopes Udorthents, loamy 3.7 7.6% 48.3 100.0% Web Soil Survey 2.0 National Cooperative Soil Survey 7/16/2008 Page 3 of 3 UCUGLbL UUtl Gtbt UGLGLbt uvy Gtbt UyS Ltbt UCVGLbt JUVLLbL y '4 N j I j R I f t h 4 '3- o H . _ V . jI . w ? ???r I • ?f m A <. x„ ^ I m ?? s T s- • 'ord. ,?'sz? ? ? .qi. .. +? _ ?.? -?# ""'. it ?;,?.? ,. - ? •* nflR ZEoF. inR rn41 nZ/zcFr nb97CR9 nQQ7CFS nRb7C'rP nnb7£ft£ 00 v Ow O O N ? N I? f0 a d LL O Cl) of 0 T N 7 Cl C? N O N ? 0 ow - a? 0 Q (n 00 -0U a? C 0 m o Z 0m °v °o 0 0 ? N VN o lo NCO CD -r- f6 t6 N a N C m O zQ ZU `?1?1 m C O ca U 0 0 Z >; O C ? 7 > O U I =3 o N >' C ? L o O' uJ I CL N 0 m O C U m 0 U) (i 0) O 0 a 2 N N O co C U O to a) Q N f6 ? a) L C L... O O > U 0) _0 a) a 0 C ? E U O d f0 a co M 7 C U) a) o' .? 0 (D a W C 0) E 3 C 7 'C C 0) - U a) Z f1 > Q N C O L U O M N 4 0 O >? a m E 0 C CO U m U o N N a) p 1 w _ m `?m nZ Z ?N cL,E(n Q ama) Qa>>o _? L) D C) ZM a r =off 3N cc o o (n m m 0< Q) L f6 aa) 2 0 a) c 7 p) 0 a'- l> O U 7 N L p _ O U a M d a) Z m a) 0 a) ri N E o c Q 0 m E-0 0 fn ma) w L to 0w a Q (a C C .C O 3 7 J a) p N p L a) -5 3 N 0 0- L N L a) C E Z N- N C O N O c 6 G al a C N T N f9 (0 (0 a a O O) a) C O N N N N 7V) a> . f0 N f9 0 Q O a O O a [6 O U N N O (/) V. Q) a j C cc N a) d L d p N .. N W CL f6 N 0) _ a) p - () O C -0 O` ? Q Ca 0 7 N Z+ C.C C E L) -5 aa) U1 a) N O.Qp p 7 O U) > - ( O > O E U) U Y U) U) U. O m m m m 0r ? m a) L) L_ 0 O 0 Z LLI 0 W J a Z m N C CO L) L 6 1 j m D O N a _ = N L O C Q O. 6 N Q N (D N N N C 2 N y Q ? LO W ?_ ?_ tr Q Q CO CO U U ? -O Z N w m N U m u) C '? O Of a) of Z) a) ?p (n W C d l0 = i0 m LL CL y LL t 0 W Y . L] O ` o to 0 N \ !` t IY )n (L 3 o v C) O 0 N N () r ? I? (9 CL T a? Z oW N p T C/) a) o > ? w o a U) O L O 0U 0 m z U U) > U ? 3 N O = U) O d ? m 3 a is O Z U ?I? Hydrologic Soil Group-Johnston County, North Carolina Partners Equity Subdivision Hydrologic Soil Group Hydrologic Soil Group- Summary by Map Unit - Johnston County, North Carolina Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 3oA ! Goldsboro sandy loam, 0 B 8.1 16.8% to 2 percent slopes Gr Grantham silt loam D 23.5 48.7% Ly Lynchburg sandy loam C 12.0 24.9% NoA Norfolk loamy sand, 0 to 2 percent slopes B 1.0 2.0% Ud Udorthents, loamy B 3.7 i 7.6% Totals for Area of Interest (AOI) 48.3 100.0% Description ' Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. r Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer ' at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Natural Resources Web Soil Survey 2.0 7/16/2008 Conservation Service National Cooperative Soil Survey Page 3 of 4 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Hydrologic Soil Group-Johnston County, North Carolina Partners Equity Subdivision Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie-break Rule: Lower USDA Natural Resources ? Conservation Service Web Soil Survey 2.0 National Cooperative Soil Survey 7/16/2008 Page 4 of 4 Project: Partners Equity Stormwater Improvements V Project No.: 3403-0001 v, M`CIQM&CREED Client: Partners Equity Group Location: Smithfield, NC Designer: JDH Date: 7/16/2008 Reviewer: JTS Date: 7/16/2008 Objective: Runoff Routing through wet pond structure for the 1 year rainfall event 1 Year Calcs for Wet Pond Watershed De scri tion Area 5 1 acres Hydraulic L 146 4 ft 4 elev. 9 ft Rainfall Data 24 hr. P 3. 2 in peak i 2.7 5 in/hr Inputs Time of Concentration Outputs Tc 20.3 min Rainfall Data g 108 in G & H Values obtained from Johnston County h 19 in/hr Stormwater Design Manual Pre CN 60 Rational Equation Rational C 0.2 Qp 28.0 cfs Time to Peak Tp 32.35 min NRCS Curve Number Method S 6.67 Q 0.41 in Qvol 75447 ft' Rational E uation Qp 123.0 cis Time to Peak Tp 45.8 min 17624 Orifice Radius 3 in Center Elev. 1, 32 5 ft Cd 0.60 Storage Below 167981.28 ft' 0.02 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.04 0.00 0.00 11659223 2.50 142.50 0.00 0.00 0.06 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.08 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.1 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.12 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.14 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.16 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.18 0.00 0.00 116592.25 2.50 142.50 0.00 0.00 02 0.00 0.01 116592.25 2.50 142.50 0.00 0.00 Peak Pre-Inflow 28.0 Peak Weir Flow 54.8 Max WSE 146 16 Weir Length 25 ft Elevation 145.35 ft Cw 3.0 Storage Below 336166.0 ft' C NO Ii C O a a? r- 'IT WSE (ft) ? v r r T T T T T T T N1 C E v E w' ?I o, Q? O 0 0 6 n I O O O O O O O O O N O co co ? N N T T T (S13) MOB= Project: Partners Equity Stormwater Improvements Project No. 3403-0001 4:$?MCIQM&CREED Client: Partners Equity Group Location: Smithfield, NC Designer: JDH Date: 7/1612008 Reviewer: JTS Date: 7/16/2008 Objective: Runoff Routing through wet pond structure for the 10 year rainfall event 10 Year Calcs for Wet Pond Watershed De scription Area 51 acres Hydraulic L 600 ft A elev 9 ft Rainfall Data 24 hr. P 5.8 in peak i 4.73 in/hr Inputs Time of Concentration Outputs Tc 20.3 min Rainfall Data g 205 in h 23 in/hr Pre CN 60 Rational Equation Rational C 0.2 QP 48.2 cfs Time to Peak Tp 82.40 min NRCS Curve Number Method S 6.67 Q 1.79 in Qvol 331105 ft' G 8 H Values obtained from Johnston County Stormwater Design Manual Rational E uation QP 212.0 cfs Time to Peak Tp 53.3 min Ks 32568 6368 (ft) (ft`) (ft') (ft') (ft) (ft) Description Countour Elev Countour Area Incr Vol Accum Vol Stage In S In Z Z est bottom 140 21,637 0 0 0.000 141 26,835 24236 24236 1 10.0956 0.0000 0.809 142 32,240 29537.5 53773.5 2 10.8925 0.6931 1.434 143 45,568 38904 92677.5 3 11.4369 1.0986 2.120 144 55,725 145604 238281.5 4 12.3812 1.3863 4.178 145 79,620 67672.5 305954 5 12.6312 1.6094 5.000 145.35 85,684 28928.2 334882.2 5.35 12.7215 1.6771 5.335 shelf bottom 146 97,244 59451.6 I 394333.8 6 12.8850 1.7918 6.000 normal pool 147 114,612 105928 500261.8 7 13-1229 1.9459 7.119 Weir Length 25 ft Elevation 14535 ft Cw 3 Storage Below 336166.0 ft Orifice Radius 3 in Peak Pre-Inflow 48.18 Center Elev. 143.25 ft Peak Weir Flow 162.44 Cd 0.6 Max WSE 147.02 Storage Below 167981.28 ft' 0.02 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.04 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.06 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.08 0.00 0.00 116592.23 2.50 142.50 0.00 0.00 0.1 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.12 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.14 0.00 0.00 116592.24 2.50 142.50 0.00 0.00 0.16 0.00 0.00 116592.25 2.50 142.50 0.00 0.00 0.18 0.00 0.01 116592.25 2.50 142.50 0.00 0.00 0.2 0.00 0.01 116592.26 2.50 142.50 0.00 0.00 17624 WSE (FT) 00 I` ti M M LO LO M M N d ?t ,It IT It C O C O CL a? 0 ---1 W. CO O LL L N 0 d 4-- 0 i? I 0 c a? n O O O O O O O LO C) 0 C) LO LO N N ?- e ' Project: Partners Equity Stormwater Improvements Project No.: 3403-0001 Client: Partners Equity Group Location: Smithfield, NC ' Designer: JDH Date: 7/16/2008 Reviewer: JTS Date: 7/16/2008 v? McIQM&CREED I' Objective: Determine the temporary storage drawdown time for the wet pond structure. Drawdown for Wet Pond om Elevation 140.00 ft sl Stage, Zi 5.35 ft sl Elevation 145.35 ft qiv orifice 6.0 in orifices 1 0.6 !rt 0.00 ft :rt Elevation 150 ft DWQ Method (1/3 Ddving Head) Permanent Pool Volume 167,981.28 cu ft Temporary Pool Volume 336,165.97 cu ft Driving Head 2.10 It Orifice Size 6.00 in Qorifice 0.79 cfs Draw Down 2.46 days 1 0 331867.66 5.30 145.30 1.18 2 0 327636.00 5.25 145.25 1.16 3 0 323471.25 5.20 145.20 1.14 4 0 319373.66 5.16 14516 1.12 5 0 31534147 5.11 145.11 1.10 6 0 311380.95 5.06 145.06 1.08 7 0 307486.35 5.02 145.02 1.06 8 0 303659.92 4.97 144.97 1.04 9 0 299901.92 4.93 144.93 1.02 10 0 296212.59 4.89 144.89 1.01 11 0 292592.21 4.84 144.84 0.99 12 0 289041.01 4.80 144.80 0.97 13 0 285559.26 4.76 144.76 0.95 14 0 282147.20 472 144.72 0.93 15 0 278805.11 4.68 144.68 0.91 16 0 275533.21 4.64 144.64 0.89 17 0 272331.79 4.60 144.60 0.87 18 0 269201.07 4.56 144.56 0.85 19 0 266141.32 4.52 144.52 0.83 20 0 263152.80 4.49 144.49 0.81 21 0 260235.74 4.45 144.45 0.79 22 0 257390.40 4.42 144.42 0.77 23 0 254617.04 4.38 144.38 0.75 24 0 251915.89 4.35 144.35 0.73 25 0 249287.22 4.32 144.32 0.71 26 0 246731.25 4.28 144.28 0.69 27 0 244248.25 4.25 144.25 0.67 28 0 241838.45 4.22 144.22 0.65 29 0 239502.10 4.19 14419 0.63 30 0 237239.44 4.16 144.16 0.61 31 0 235050.71 4.14 144.14 0.59 32 0 232936.16 4.11 144.11 0.57 33 0 230896.03 4.08 144.08 0.55 34 0 228930.55 4.06 144.06 0.53 35 0 227039.97 4.04 144.04 0.50 36 0 225224.52 4.01 144.01 0.48 37 0 223484.45 3.99 143.99 0.46 38 0 221820.00 3.97 143.97 0.44 39 0 220231.42 3.95 143.95 0.42 40 0 218718.95 3.93 143.93 0.40 41 0 217282.84 3.91 143.91 0.38 42 0 215923.36 3.89 143.89 0.36 43 0 214640.76 3.88 143.88 0.33 44 0 213435.32 3.86 143.86 0.31 45 0 212307.34 3.85 143.85 029 46 0 211257.12 3.83 143.83 0.27 47 0 210284.99 3.82 143.82 0.25 48 0 209391.31 3.81 143.81 0.23 49 0 208576.50 3.80 143.80 0.20 50 0 207841.02 3.79 143.79 0.18 51 0 207185.42 3.78 143.78 0.16 52 0 206610.40 3.77 143.77 0.14 53 0 206116.83 3.76 143.76 0.11 54 0 205705.92 3.76 143.76 0.09 55 0 205379.47 3.75 143.75 0.07 56 0 205140.60 315 143.75 0.04 57 0 204995.30 3.75 143.75 #NUM! Project: Partners Equity Stormwater Improvements Project No.: 3403-0001 Client: Partners Equity Group Location: Smithfield, NC Designer: JDH Date: 7/16/2008 Reviewer: JTS Date: 7/16/2008 Objective: Runoff for grass swales for the 10 year rainfall event. Calculations for Swale Flows Watershed De scri tion Area 11 acres Inputs Hydraulic L 655 ft Time of Concentration f, A elev. 7 ft Tc 7 min Rainfall Data Rainfall Data 24 hr. P 5.8 in g 205 in G & H Values obtained from Johnston County peak i 6.92 in/hr h 23 in/hr Stormwater Design Manual 60 C l C 0.2 r,al,on. MCIQM&CREED Rational Equation Qp 15.1 cfs Time to Peak Tp 56.33 min Rational E nation Qp .-4 cfs Time to Peak Tp 36.4. min S Q of Project: Partners Equity Stormwater Improvements Project No.: 3403-0001 Client: Partners Equity Group Location: Smithfield, NC Designer: JDH Date: 7/16/2008 Reviewer: JTS Date: 7/16/2008 Objective: Runoff for grass swales for the 1 year rainfall event. Calculations for Swale Flows Watershed De scri lion Area 11 acres v? MCKIM&CREED -- Hydraulic L 655 ft Time of Concentration ©. puts L elev. 7 ft Tc 7 min Rainfall Data Rainfall Data 24 hr. P 5.8 in g 108 in G & H Values obtained from Johnston County peak 4.22 in/hr h 19 in/hr Stormwater Design Manual Pre CN 60 Rational Equation Rational C 0.2 Qp 9.2 cfs Time to Peak Tp 92.48 min NRCS Curve Number Method S 6.67 Q 1.79 in Qv0l 70905 ft' Rational E nation Qp 40.5 cfs Time to Peak Tp 59.8 min 11 Worksheet for Grass Swales Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Normal Depth Left Side Slope Right Side Slope Bottom Width Results Discharge Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope 7/16/2008 2:18:21 PM Manning Formula Discharge 0.030 0.00230 ft/ft 2.00 ft 3.00 ft/ft (H:V) 3.00 ft/ft (H:V) 4.00 ft 53.69 ft3/s 20.00 ft2 16.65 ft 16.00 ft 1.29 ft 0.01442 ft/ft 2.68 ft/s 0.11 ft 2.11 ft 0.42 Subcritical 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft Infinity ft/s Infinity ft/s 2.00 ft 1.29 ft 0.00230 ft/ft 0.01442 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 Worksheet for Connector Swales Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Normal Depth Left Side Slope Right Side Slope Bottom Width Results Discharge Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope 7116/2008 2:18:34 PM Manning Formula Discharge 0.080 0.00230 ft/ft 2.00 ft 3.00 ft/ft (H:V) 3.00 ft/ft (H:V) 4.00 ft 20.13 ft'/s 20.00 ft2 16.65 ft 16.00 ft 0.76 ft 0.11775 ft/ft 1.01 ft/s 0.02 ft 2.02 ft 0.16 Subcritical 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft Infinity ft/s Infinity ft/s 2.00 ft 0.76 ft 0.00230 ft/ft 0.11775 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.066.001 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 IMPERVIOUS: 1.6799/265*100=63.39X ? S i= ? E a ? IMPERVIOUS 75,873 sq. fL = 73,1 sq. f L = 1.6799 acno U J E x x LOT 16 & 19 TOTAL 265 acm ? y 3 ? is 40 Soil Water & Environment Group Research Building I, Centennial Campus 1001 Capability Drive, Suite 312 Raleigh, NC 27604 Ph. (919) 831-1234 Cell (919) 368-2029 Fax (919) 831-1121 a a? IMPERVIOUS SURFACES FIGURE FOR: PARTNERS EQUITY GROUP LOTS 18 do 19 OWNER: PARTNERS EQUITY GOUP REF: PB 50 PG 420 SMITHFIELD TOWNSHIP JOHNSTON COUNTY COUNTY, NORTH CAROLINA 60 30 0 60 120 SCALE 1 "=60' DATE 10-24-07 REVISED 12-4-07 LOT 18 PIN # 2604-10-8014 LOT 19 PIN # 2603-19-8739 w CL N k ?' ?' ? 0 I ' z (?F$dk ?8is z o+° F'O R N?k'S W a$ ?? ki aw ?wo $ yz - ? ? Q a .ss bd• ou 9 w ?z d a(/f ? O?' ?z0 W z ti Z 5 z Qg?? acaio z ?? 00 l F ?? k € I s F k W J Jwz V) » . w 8 ° a= u 8? s$K' ° w ¢ Z zg o Z W W ink 2k Z I - N° ?rc €? .Zo € ka av i 36 Z W -?o Nor s o- J a. (lSb'9d ' LS d) HLaON ltllV? z ° ml= o l^ a'az .o k kk <8 ? K ii z o° a:w, x o oow ? 4pI ? c k? ? b ? m ¢ ? ?RVI ZUS ?, _ Yi hhh???? o N c i- In iH I ? 'tea o c5 €R H ilk z .1B'LL£ M.lZ.B0.Y0S I??w?dG I d I * F? Sd6qm -____-______ ______ _ =?? (q wg- 1 ______._____ ____ V T __ ._ I ?` ?i AA F -g f i is ? Ha I ,I.if 25 Uv.LQYON I N2 si sd W oo z o I 3G 3t I _ I ? I ? 3 / I ??<: a H:z'e? J J O: p : I I \ S ' .''F YPa \ ?% o II I 1 t od Pa §? b ga ?'•• 1..:' n $ 1 3 syH I I Ci J g k w 1 '?+` c r I ? . i u S ?.Um io a0? I \ 1 g2 11 I ? : I IQ+ I <? I a'm gc k li i-u rfi z ?z I I \ ?' .c ?` I I } a" r I w$ r ? ? ? g w? 1 c? am ?. I Vm I ?Rn ? N N I vi P7 m I i I I t kk? z ?Nb ? Z I g am I`?~ iaN I I I tt ig?W `? N -5 I ? : 3 > zom N' I II II II N w C W g I F r'+? I 1 ? ?c I $qa o ^' I II II o? \ I 1 \ zc? a . !^ i M \ I yi I $ _ 1 'oo N z „ m w \ pZ n e U of ? ? ? ? m I u I w x \ v ? ?? J0 ? ? n C 1 I 000K 2 1 6 3 PAGE 5 61 NORTH CAROLINA JOHNSTON COUNTY THIS EASEMENT is made and entered into thi? day of December, 2001, by and between Stuart Simon Properties, L.L.C. [herein "SSP"] and Partners Equity Group [herein PEG"], WITNESSETH: 1 11 C 0 SSP is the owner of the original area designated as Lot 6 of Partners Equity Group Subdivision as shown on the plat of record in Plat Book 50, page 420, Johnston County Registry, by virtue of the deed of record in Book 1385, page 854, Johnston County Registry. PEG owns a substantial portion of the balance of Partners Equity Group Subdivision under the deed of record in Book 1295, page 911, Johnston County Registry. By lease, a Memorandum of which appears of record in Book 1385, page 859, Johnston County Registry, SSP leased to BELASH, LLC, all of Lot 6 of Partners Equity Group Subdivision for a period ending December 31, 2019. BELASH, LLC, joins in this easement to subordinate its interest in Lot 6 to the terms and provisions hereof. By lease, a Memorandum of which appears of record in Book 1385, page 864, Johnston County Registry, BELASH, LLC, leased the same property to Factory Stores of America, Inc., for a maximum period of 25 years (anticipated to terminate no later than December 31, 2019). The Johnston County Board of Education entered into a certain sublease agreement between it as sublessee and Konover Property Trust, Inc., as sublessor, dated May 5, 1999, which lease is scheduled to expire April 30, 2002, and does not appear of record. Konover Property Trust, Inc., was successor by change of name to Factory Stores of America, Inc. Konover Property Trust, Inc., joins in this Easement to subordinate its interest under the aforesaid lease to the terms and provisions hereof. Likewise, the Johnston County Board of Education joins in this Easement to subordinate its interest as lessee to the terms hereof. PEG has conveyed a portion of Lot 5 of Partners Equity Group as platted of record on the plat of record in Plat Book 50, page 420, Johnston County Registry, to SSP. The consideration for that conveyance is the granting of this easement. In consideration of the aforesaid conveyance, SSP agreed to convey to PEG a permanent easement for installation and maintenance of a holding pond for the benefit of Partners Equity Group Subdivision, in general, and to satisfy certain regulatory requirements. NOW, THEREFORE, in consideration of the premises, the sum of TEN DOLLARS and other good and valuable considerations, the receipt and sufficiency of which are hereby acknowledged, SSP, joined by the tiered lessee and sublessees from SSP, does hereby give, A1 NARRON. O'MAL.E AND WMITTINGTON. G.A. SMIt -ELO - BE,om • NORTN CAROLINA 0001 2 1 6 3 .PAGE 5 6 2 Page -2- grant, bargain, sell and convey to PEG, its successors and assigns forever, a permanent easement for the construction and maintenance of a holding pond for the benefit of the entire Partners Equity Group Subdivision as platted of record in Plat Book 50, page 420, Johnston County Registry, such easement to be appurtenant to the entire balance of the said Partners Equity Group Subdivision, its constituent lots, and for the benefit of those lots and for the Partners Equity Group Subdivision as a whole. The area conveyed by this easement is particularly described on Exhibit A which is attached hereto and incorporated herein by reference as if fully set out herein. TO HAVE AND TO HOLD a permanent easement for the purposes herein expressed, as aforesaid, to Partners Equity Group, its successors and assigns forever in as full and ample a manner as SSP is entitled to convey the same. IN WITNESS WHEREOF, SSP joined by its lessee and the tiered sublessees, has executed this Easement this day and year first above written. STUART SIMON PROPERTIES, L.L.C. By: (SEAL) r, Member-M ger J S. Shallcross, J???(SEAL) By: ?Shallcross, J on S. Member-Manager BELASH, L.L.C. By (SEAL) hn S. =Shallcr,,s, Jr., Manager :t 0 • • MARRON. 0-HALE AND WHITTINOTON. P.A, SMITHFIELD - BENSON • NORTH CAROLINA 1 1 1 • 0 Y BOOK 2 1 6 3 :PAGE 5 6 3 Page -3- KONOVERRPPR/OPERTYTRUST, /INC. By: DL ?J k"a V_ -,> LL f.*A_ President ATTEST: Secretary f THE JOHNSTON COUNTY BOARD OF EDUCATION, ?? nYLQ: `?.'li U ' ' _y •. ; .. A governmental entity • By: (SEAL) Its: ATTEST: NORTH CAROLI`RA- JOHNSTON COUNTY I, Uuir->J AA. 5-z fi't- a Notary Public, in and for said County and State, do hereby certify that JOHN S. SHALLCROSS, JR., personally came before me this day and acknowledged that he is Member-Manager of STUART SIMON PROPERTIES, L.L.C., a North Carolina limited liability company, and that by authority duly given and as the act of the company, the foregoing instrument was signed in its name by him as Member-Manager. Witness my hand and notarial seallstamp, this aUr day of December, 2001. (?u• WlL_ N.P. My Commission expires: 7?ap10L? ?,.•'J?d.AN M• ST?FF 11 NOTARY ? y?• pUBLiG ;•'??,•; HARRO N. O'HALE AND WHITTINGTON. P.A. 0 •,. •11,A;;,,? SMITHFIELD - BENSON • NORTH CAROLINA N 0 ;, 11111111111•v 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 000A 216 3 TALE 5 6 4 Page -4- NORTH CAROLINA JOHNSTON COUNTY I, Y11jTW3 M. sJoaa: a Notary Public, in and for said County and State, do hereby certify that JASON S. SHALLCROSS, personally came before me this day and acknowledged that he is Member-Manager of STUART SIMON PROPERTIES, L.L.C., a North Carolina limited liability company, and that by authority duly given and as the act of the company, the foregoing instrument was signed in its name by him as Member-Manager. Witness my hand and notarial seal/stamp, this /o2e day of December, 2001. V ( a, ,? N.P. My Commission expires: 7fjUJO? ```'? ,Sf??''•, •,\, NOTARY NORTH CAROLINA t * » JOHNSTON COUNTY ? o'• PUBLIC I, V.i11 VA.) M St a Not U y. tarp rr 1 for said County and State, do hereby certify that JOHN S. SHALLCROSS, JR., personally ,c1,ame before me this day and acknowledged that he is Manager of BELASH, L.L.C., a North Carolina limited liability company, and that by authority duly given and as the act of the company, the foregoing instrument was signed in its name by him as Member-Manager. Witness my hand and notarial seal/stamp, this ZO day of December, 2001. Y\ (1•w. ?itr ?"-" N.P. My Commission expires: iJa Cl `l Tp N01A RY "",sets NARRON. 0•NAL6 ANO WHITTINGTON. P.A. SMITHFIELD - BENSON • NORTH CAROLINA .+ • • • 1 ['I 1 BOOK2 16 3 REE5 6 5 Page -5- STATE OF K r0? CiZrc:li,,_ COUNTY OF k1 V , 1, ` CkA ???' Yrn?L a Nqtary Public, in and for said County and State, do hereby certify that lc:4inbaaae me this day and acknowledged that he/she is Personally came before PROPERTY TRUST, INC., a Maryland corporation, and that b authority if KONOVER act of the corporation, the foregoing instrument was signed in its name by its "e.- kk,and the President, sealed with its corporate seal and attested by him/her as its ?y;t? tad?wE Secretary. ? Witness my hand and notarial seal/stamp, this 2-04t-day of December, 2`1001. ees rrrww?tOO??VVV""" N.P. PN ,,.....,,• ?S My Commission expires: FCb. tsf Zcbb kp ,r• ' sr p10TAgy shy NORTH CAROLINA o I * * * i JOHNSTON COUNTY ;syPUBLIC v; 0NAQ91 61?ublic, in and for said County and State, do ereby certify that me this day and acknowledged t t he/she is personally came before COUNTY BOARD OF EDUCATION, a governmental entity, and that by authority duly given and as the act of the corporation, the foregoing instrument was signed in its name by its • Chairman, sealed with its corporate seal and attested by him/her as its Secretary. i Witness my hand and notarial seal/stamp, this A0'` day of December, 2001, My Commission expires: 111 Ull///p?G/ !? NORT r . ,,j 1? ,?urx Mu roregoing certificate/: H CAROLINA -JOHN ..IRrY PubI!C1Notaries Public ore ertlf ed t be correct, l //?/11?1111?,??\ Filed 1bb1pe????II llle??gfffssstration 7nl3 e I this once to aook oC f to 3 day ?i?--- Pa e eUI M. Mass 111 20 at O'clock .M Register of Deeds AssIJ eA Register of eds NARRON, O'HAL.E ANO WHtTTINGTON, P.A. SNITFIELO - DLNSON • NORTH CAROLINA • I ? i HOW 216 31PAR5 6 6 Page -6- EXHIBIT A BEGINNING at a concrete monument set in the eastern right-of-way line of North Equity Drive, the southwest corner of Lot 6 as shown on the plat of record in Plat Book 43, page 469, and as described in deed of Stuart Simon Properties, LLC, recorded in Book 1295, page 911, and from said beginning point the line runs thence with the eastern right-of-way line North Equity Drive North 01 degree 57 minutes 44 seconds East 16.91 feet to a point; thence along the edge of the stormwater retention pond North 69 degrees 35 minutes 18 seconds East 178.33 feet, North 59 degrees 24 minutes 18 seconds East 43.72 feet, North 50 degrees 06 minutes 33 seconds East 47.61 feet, North 44 degrees 40 minutes 15 seconds East 48.97 feet, North 37 degrees 16 minutes 48 seconds East 21.01 feet, North 33 degrees 52 minutes 35 seconds East 102.43 feet, North 04 degrees 01 minute 53 seconds East 49.52 feet, North 22 degrees 36 minutes 23 seconds West 47.82 feet, North 35 degrees 00 minutes 06 seconds West 48.41 feet, North 74 degrees 26 minutes 36 seconds West 44.35 feet, South 89 degrees 35 minutes 56 seconds West 63.96 feet, North 84 degrees 45 minutes 20 seconds West 73.62 feet, North 78 degrees 38 minutes 21 seconds West 44.19 feet, North 70 degrees 56 minutes 50 seconds West 51.94 feet, North 65 degrees 08 minutes 26 seconds West 50.28 feet and North 07 degrees 51 minutes 53 seconds East 15.00 feet to a point on the northern boundary line of Lot 6 with Sunshine Investment Properties, LLC described in deed recorded in Book 1540, page 805; thence with the line of Sunshine Investment Properties, LLC, South 82 degrees 08 minutes 07 seconds East 59.94 feet and South 82 degrees 08 minutes 04 seconds East 400.42 feet to an existing iron stake, control corner, thence with the eastern line of Lot 6 South 04 degrees 46 minutes 21 seconds West 377.84 feet to a concrete monument, the southeast corner of Lot 6; thence as the southern line of Lot 6 South 84 degrees 11 minutes 14 seconds West 414.20 feet to the point and place of beginning, containing 1.731 acres, more or less, according to a plat and survey by L. Dennis Lee, P.A., dated December 18, 2001, and styled "Stormwater Retention Pond Easement Map for the Partners' Equity Group," and recorded in Plat Book 59, page 333, Johnston County Registry. NARRON. 0-MALE ANO WHITTINGTON. P.A. S.IT-IELO - 8ENSON . NORTH CAROLINA i • • f 1 Permit Number: (to be provided by DWQ) ' Drainage Area Number: Stormwater Wetland Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. ' Important maintenance procedures: - Immediately after the stormwater wetland is established, the wetland plants will ' be watered twice weekly if needed until the plants become established (commonly six weeks). - No portion of the stormwater wetland will be fertilized after the first initial ' fertilization that is required to establish the wetland plants. - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet detention basin. ' - Once a year, a dam safety expert will inspect the embankment. After the wet detention pond is established, I will inspect it once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal ' County). Records of operation and maintenance will be kept in a known set location and will be available upon request. i Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. ' The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to wetland erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is ' established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of ' long. approximately six inches. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off-site. ' The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Wetland O&M-Rev.3 Page 1 of 4 L I L I 11 n BMP element: Potential problem: How I will remediate the problem: The forebay Sediment has accumulated in Search for the source of the the forebay to a depth that sediment and remedy the problem if inhibits the forebay from possible. Remove the sediment and functioning well. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. The deep pool, shallow Algal growth covers over Consult a professional to remove water and shallow land 50% of the deep pool and and control the algal growth. areas shallow water areas. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray) - the deep pool and shallow consult a professional. water areas. Shallow land remains flooded Unclog the outlet device more than 5 days after a immediately. storm event. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates s it is necessary. Best professional practices Prune according to best professional show that pruning is needed practices. to maintain optimal plant health. Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth possible. Remove the sediment and of the deep pools. dispose of it in a location where it will not cause impacts to streams or the BMP. Form SW401-Wetland O&M-Rev.3 Page 2 of 4 u C H 0 BMP element: Potential problem: How I will remediate the problem: The embankment A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. The micropool Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Plants are growing in the Remove the plants, preferably by micropool. hand. If a pesticide is used, wipe it on the plants rather than spraying. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Wetland O&M-Rev.3 Page 3 of 4 ' Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the ' performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Partners Equity Group Subdivision BMP drainage area number: Print name:John Shallcross, jr Title: P S D Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Ill Cole G-' Pat n l no ta,%- , a Notary Public for the State of WAO Cae& KA-, County of WOXG , do hereby certify that J Jbiala sl' i c" SSA personally appeared before me this day of , 2bD , and acknowledge the due execution of the forgoing stormwater wetland maintenance requirements. Witness my hand and official seal, `'1011111111111 ?? PE IVN i? `. o?p CARy'?. nj:A t? =U? O r ? • r r Z• r % • V COQ ,`?????? SEAL My commission expires. Form SW401-Wetland O&M-Rev.3 Page 4 of 4 Address:P. O, Box 1524 Smithfield, NC 27577