Loading...
HomeMy WebLinkAboutNCG030039 DMR SW (23) s "l a E EIVE January 16, 2017 ENGINEERING, INC. FEB 032017 CENTRAL FILES Ms.Lindsey Speed DWR SECTION Daimler Trucks of North America,LLC 11550 Statesville Boulevard Cleveland,NC 27013 Subject: Monthly Sampling—December 2016 NPDES General Permit No.NCG030000/CoC No.-NCG030039` Daimler Trucks of North America,LLC 11550 Statesville Boulevard,Cleveland,North Carolina Shield Project No. 1140111-04 Dear Ms. Speed: Shield Engineering, Inc. (Shield) was unable to collect stormwater samples at the Cleveland facility for the month of December 2016. According to rainfall data collected for the month, rain events occurred on December 4th, 18`x', 25th and 29th, measuring 0.51 inches, 0.18 inches, 0.04 inches, and 0.17 inches, respectively. An additional 0.28 inches, 0.16 inches, 0.11 inches, 0.02 inches, 0.09 inches, and 0.01 inches of rain were measured on December 5th, 6°', 7`�', 8`l', 9th, and 11"', respectively. However, each of these events took place after normal business hours, within 72 hours of the last qualifying storm event,or did not produce enough rainfall to collect a sample. Shield will continue to monitor daily weather conditions and attempt to continue coordination of appropriate staff and resources to facilitate adequate sample collection. Per Section,2 Part IV of General Permit No. NCG030000 Shield will attempt to collect a substitute sample and perform a visual assessment during the next qualifying storm event. A partially completed DMR form is attached to this cover letter for your signature and submittal to the State. Daimler's Cleveland facility remains in Tier Three of the NPDES General Permit No. NCG030000 at SDO#002. The person designated to act as the permittee by Daimler Trucks—Cleveland Facility should complete all "Red" sections of the attached Stormwater Discharge Monitoring Report (DMR). The completed DMR form should then be mailed to the regulatory agency Central Files. Shield greatly appreciates the opportunity to provide environmental services to Daimler Trucks of North America. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at(704)394-6913. Respectfully, SHIELD ENGINEERING,INC, 101111 I 41 door Melinda . Greene rk C.Boland,P.E. Senior Engineer Principal Engineer Attachment: Stormwater Discharge Monitoring Report(DMR) 4301 Taggart Creek Road Telephone 704.394.6913 www.shieldengtneenng cornCharlotte,NC 28208 Fax 704 394.6968 DAIMLER Lindsey Speed Sr.Environmental Engineer Daimler Trucks 11550 Statesville Blvd Cleveland,NC 27013 704 645 5353 Phone January 24, 2017 RECEIVED FEB 0 3 2017 Division of Water Quality Attn: Central Files CENTRAL FILES 1617 Mail Service Center DWR SECTION Raleigh, North Carolina 27699-1617 To whom it may concern: Shield Engineering, Inc. was unable to collect storm water samples for Storm water Discharge Outfalls (SDO) #002 at the Cleveland facility for the month of December. Per Section 2 Part IV of General Permit No. NCG0300 shield will attempt to perform a substitute sample or a visual assessment during the next qualifying storm event. As we reported for the month of March, 2014 the Cleveland facility remains in Tier Three of the NPDES General Permit No. NCG030000. Daimler Trucks Cleveland facility is awaiting notification from the Division of Water Quality as to what changes will occur when entering into Tier Three of the NPDES General Permit. Should you have any questions, please contact me at 704-645-5353 or Iindsey.speed@daimler.com. Sincerely, Daimler Trucks, LLC (Y)60,44-nrP f)- -.&- Lindsey Speed Sr. Environmental Engineer Enclosures Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/16/17 CERTIFICATE OF COVERAGE NO. NCG030039 SAMPLE COLLECTION YEAR 2016 FACILITY NAME Daimler Trucks North America LLC—Cleveland,NC SAMPLE PERIOD ❑Jan-June ❑July-Dec PERSON COLLECTING SAMPLES N/A ® p�, or ® Monthly' December (month) LABORATORY:N/A Lab Cert.#_ RECEIVED TO CLASS ❑ORW DHOW ❑Trout ❑PNA Comments on sample collection or analysis: Samples were not obtained ❑Zero-flow ❑Water Supply OSA due to not enough rainfall/discharge during normal business hours ��g ��( ®Other CENTRAL FILES r)WR SECTION PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 - Part A:Stormwater Benchmarks and Monitoring Results ❑No discharge this period?2 Non-Polar O&G/ Date Sample 24-hour rainfall pH, Total Toxic Outfall No. Colleded1 amount, Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics5 (mo/dd/yr) Inches Hydrocarbons Benchmarks===> _ - 100 mg/L or 50 mg/L4 6.0—9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L a Monthly sampling(instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall,you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on-site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit,Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations,manufacture semiconductors, manufacture electronic crystals,or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample(for metal finishing use the definition as found in 40 CFR 433.11;for semiconductor manufacture use the definition as found in 40 CFR 469.12;for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify,and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver,the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO),I certify that to the best of my knowledge and belief,no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." • e,Yn n 1 n ZevoThs Name(Print nam t?1ztini- Mztnae*- Title Print title) N. P'4 V Siu, (Signature) t (Date)- Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL,<POI, Non-detect, ND,or other similar non-numerical format. When results are below the applicable limits,they must be reported in the format,"<XX mg/L",where XX is the numerical value of the detection limit, reporting limit,etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging>55 gal of new oil per month. No discharge this period?2 Date Sample 24-hour rainfall Outfall No. 1 Collected amount, Non-polar O&G/TPH by (mo/dd/yr) Inches3 EPA 1664(SGT-HEM) Total Suspended Solids pH Benchmarks===> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0—9.0 SU Footnotes from Part A also apply to this Part B *See General Permit text,Table 5,identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 5WU-245,last revised 10/25/2012 Page 2of3 Note: If you report a sample value in excess of the benchmark,you must implement Tier 1, Tier 2,or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑NO❑ IF YES,HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑NO Li REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR, includina all"No Discharge"reports,within 30 days of receipt of the lab results for at end of monitoring period in the case of"No Discharge"reports)to: Division of Water Quality Attn:DWQ Central Files 1617 Mail Service Center Raleigh,North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete. I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations." 1}l'eL)•XP 'eSo (Signature of Permittee) ((D te) Permit Date:11/1/2012-10/31/2017 SWU-245,last revised 10/25/2012 Page 3 of 3