HomeMy WebLinkAbout20160294 Ver 3 - 170203_Phase3-Stream_Binder - 2/3/2017PIN 0609-46-7498
PRELIMINARY T?R'1079PG0653
EXISTING STREAM CHANNEL
NOT FOR PROPOSED STREAM ALGINMENT (UT1). ACTUAL LENGTH TO
CONSTRUCTION r / BE FIELD DETERMINED AFTER POND REMOVAL.
MOUNTAIN VIEW -
EXISTING INLINE POND TO BE REMOVED
MEMORIAL PARK1M
0 ,'`�f _ \ FUTURE STORMWATER CONTROL MEASURE
PIN 0609-46-1645
0D13 1257 PG 0576
/1/111 \of
0 50
I / I I 1 1 \\—\ PR`p OPERTY BOU
NDARY\
�
1" = 50' EXISTING EARTHEN DAM TO BE REMOVED llllp� y/ ,' / �' ,' ,' i I �r �I `\ `\ \\ \ \\
/ zS5b
NATURAL CHANNEL/ STREAMBANK
STABILIZATION TECHNIQUES ALONG
STRAIGHT PORTION OF CHANNEL
X36 \ \ \
PIN \ \ \ \ \ \
MOSEMAN DOUGLAS \ /o; //,r \ \ / /' / / \I 1' (7i1
ROY TRUSTEE
PIN 0609-46-2295
1R ?1,t1 i nl84
—d/ /lrl
GEOLIFTS AS REQUIRED ALONG OUTSIDE CURVE. SEE !
DETAILS ON SHEETS 2 & 3.
EXISTING EARTHEN DAM TO BE REMOVED
Il I / I I l 1
EXISTING STREAM CHANNEL II
FUTURE
VICINITY MAP , 0--o _ /�,'ol
SITE LOCATION
OLD US 70 HWY
uh ti�w�'�,' DEVELOPMENT / , '
�ti ti� r
�4z�
2$58 / 9 1
/ @359 /
iss, Lo
ti
r
Lj
✓ / / / / / / / / I I ----
0 0 o
w / m / /
1 / l / l / / / I hb tiI �hh
I / / ti�
z
LU
--
j
NOT TO SCALE26 / �5
Publish Date: 02/02/17 1 User: S.Stavinoha
Filepath. \\ashevillel\asheville\Projects\Givens Highland Farms\16ac Site Development Phase 3\CADD\STREAM REST-16ac Site Development Phase 3.dgn
'NZANCHOR Figure #1
QEA Site Plan
Anchor QEA of North Carolina, PLLC
NC Firm License No. P-1649 Meadowmont at Givens Highland Farms -Phase 3
Black Mountain, Buncombe County, NC
MOUNTAIN SLOPE
'�Fj
i 11 I I-III1 I I-1 I-
VEGETATED GEOLIFT
SEE DETAIL ON SHEET 3
MOUNTAIN SLOPE PLANTING
PLANT SPACING: 8 FT
BARE ROOT SPECIES LIST:
FLOODPLAIN
BANKFULL BENCH
WIDTH APPROX. 2'
STREAM
BANK
BANKFULL
ELEVATION
=111 � 111111 _ ' -111,1
III1 I �= III_ IIIA
TYPICAL CROSS SECTION.
SEE DETAIL ON SHEET 3
LIVE STAKES
FLOODPLAIN PLANTING
PLANT SPACING: 8 FT
BARE ROOT SPECIES LIST:
qw- my
COMMON NAME SCIENTIFIC NAME
%
COMMON NAME
SCIENTIFIC NAME
%
TULIP POPLAR (LIRIODENDRON TULIPIFERA )
20
RIVERBIRCH
(BETULA NIGRA)
33
AMERICAN SYCAMORE (PLATANUS OCCIDENTALIS)
20
GREEN ASH
(FRAXINUS PENNSYLVANICA)
33
YELLOW BIRCH (BETULA LUTEA)
20
IRONWOOD
(CARPINUS CAROLINIANA)
33
SUGAR MAPLE (ACER FLORIDANUM)
20
BITTERNUT HICKORY (CARYA CORDIFORMIS)
10
NOTE:
AMERICAN HOLLY (ILEX OPACA)
10
PERMANENT SEEDING
SHALL BE APPLIED IMMEDIATELY
FOLLOWING
LAND DISTURBANCE
ACTIVITY.
NOTE:
TEMPORARY SEEDING SHALL BE APPLIED IMMEDIATELY FOLLOWING
LAND DISTURBANCE ACTIVITY.
CHANNEL PLANTING
Publish Date: 01/31/17 1 User: S.Stavinoha
Filepath: \\asLevillel\asheville\Projects\Givens Highland Farms\16ac Site Development Phase 3\CARD\STREAM REST-16ac Site Development Phase 3.dgn
PERMANENT SEED MIX SHALL BE ERNST
CONSERVATION SEEDS RIPARIAN BUFFER MIX -
ERNMX-178, OR APPROVED EQUAL APPLIED
ACCORDING TO MANUFACTURERS SPECIFICATIONS.
STREAM BANK PLANTING
PLANT SPACING: 3 FT O.C. MAX. STAKE IN TRIANGLE PATTERN.
LIVE STAKE SPECIES LIST:
COMMON NAME SCIENTIFIC NAME
SILKY DOGWOOD (CORNUS AMOMUM) 20
NINEBARK (PHYSOCARPOS OPULIFOLIUS) 20
BUTTONBUSH (CEPHELANTHUS OCCIDENTALIS) 20
SILKY WILLOW (SALIX SERICEA) 20
BLACK WILLOW (SALIX NIGRA) 20
NOTE:
PERMANENT SEEDING SHALL BE APPLIED PRIOR TO COIR
MATTING.
NOT TO SCALE
tszANCHOR Figure #2
QFA Proposed Stream Channel - Detail
Anchor QEA of North Carolina, PLLC
NC Firm License No. P-1649 Meadowmont at Givens Highland Farms -Phase 3
Black Mountain, Buncombe County, NC
moi
KEY TRENCH \
I � r
i
COIR MATTING
GEI WORKS CONTROL MAT 70 -
WEIGHT 780 G/M2 OR APPROVED
EQUAL. FILL WITH AMENDED
NATIVE SOIL.
RIVER COBBLE
INSTALL 2"-3" DEPTH (MIN.)
STREAMBANK
APPROX. 3'
CONTAINER PLANT MATERIAL INSTALLED
ABOVE/BEHIND COIR MATTING.
2' BOTTOM WIDTH
3 I 3" MIN. AMENDED NATIVE MATERIAL
— BLENDED INTO NATURAL GRADE.
N" — AREA SHALL BE SEEDED AND COVERED
WITH WEED FREE STRAW.
AMEND AND IRRIGATE SOIL AS NEEDED.
– COIR MATTING
GEI WORKS CONTROL MAT 70 - WEIGHT 780 G/M2
OR APPROVED EQUAL. INSTALL BELOW COBBLE
I= CHANNEL AND ALONG NEWLY CONSTRUCTED
BANK. TIE INTO KEY TRENCH AT TOP OF BANK.
LIVE STAKE OF NATIVE SPECIES (TYP.)
SECTION VIEW SEE PLANTING DETAIL ON SHEET 2.
STREAM WATER SURFACE
ELEVATION (APPROXIMATE)
TOP OF BANK
FLOW
I -IH I I IIVV
FRONT VIEW
(STAGGERED SEAMS)
INSTALLATION SPECIFICATIONS:
1. CLEAR ANY WOODY DEBRIS BELOW TOE PRIOR TO INSTALLATION.
2. LIFTS ARE CONSTRUCTED FROM BOTTOM TO TOP. ALIGNMENT OF LIFTS SHALL BE STAKED OUT PRIOR TO CONSTRUCTION FOR APPROVAL BY CLIENT/ENGINEER.
3. LAY COIR FABRIC PERPENDICULAR TO STREAM CHANNEL, OVER AN AREA THAT CAN BE COMPLETED AND STABILIZED DURING THAT WORKING DAY.
4. COIR FABRIC SHALL BE ROLLED OUT LENGTHWISE, PERPENDICULAR TO THE STREAM CHANNEL, SUCH THAT IT EXTENDS FROM 2/3 THE WIDTH OF THE GEOLIFT, MEASURED FROM THE NEAR BANK TOWARD THE
CHANNEL. DOWN -GRADIENT SECTIONS OF COIR SHALL OVERLAP UPHILL SECTIONS WHEN INITIALLY LAID OUT, WHERE APPLICABLE.
5. AMENDED NATIVE SOIL SHALL BE USED AS FILL MATERIAL FOR THE TOP LIFT. THE AREA ABOVE THE TOP LIFT SHALL BE TOP DRESSED WITH A MINIMUM OF 3" OF TOPSOIL AND BLENDED INTO THE NATURAL
GRADE. THE AREA SHALL THEN BE SEEDED AND COVERED WITH WEED FREE STRAW. AMEND AND IRRIGATE SOIL AS NEEDED.
6. MATERIAL SHALL BE CAREFULLY PLACED IN THE LIFTS AND COMPACTED OVER THE AREA UNTIL A THICKNESS OF 12". APPLY SEED TO TOP AND OUTSIDE OF SOIL INSIDE THE LIFT SO IT SHALL HAVE THE
OPPORTUNITY TO GERMINATE THROUGHT THE COIR MATTING.
7. COIR FABRIC EXTENDING FROM BENEATH THE COMPACTED SOIL SHALL BE TIGHTLY AND CAREFULLY WRAPPED, AND STAKED WITHIN A KEY TRENCH AND USING APPROPRIATE STAKES, STARTING AT THE PIECE
OF COIR FURTHEST DOWN SLOPE AND MOVING UP SLOPE ONE PIECE AT A TIME.
8. WRAPPED COIR SHALL EXTEND OVER THE COMPACTED SOIL LIFT TOWARD THE BACK OF THE BANK SO THAT PLACEMENT OF REMAINING SOIL SHALL PINCH IT IN PLACE.
9. LIVE BRANCHES SHALL BE HARVESTED FROM THE TIPS OF SPECIFIED TREE SPECIES BRANCHES THAT SHOULD BE FIVE TO EIGHT FEET IN LENGTH. LIVE BRANCHES SHALL BE PLACED GROWTH END OUT AND
ROUGHLY ADJACENT TO ONE ANOTHER SUCH THAT ONE TO TWO FEET EXTENDS BEYOND THE COIR WRAPPED LIFT. OUTSOURCED LIVE STAKE MAY BE USED. PROVIDE ENGINEER WITH SUPPLIER AND PLANT TYPE
BEFORE PLACING ORDER.
VEGETATED GEOLIFT
Publish Date: 01/20/17 1 User: S.Stavinoha
Filepath. \\ashevillel\asheville\Projects\Givens Highland Farms\16ac Site Development Phase 3\CADD\STREAM REST-16ac Site Development Phase 3.dgn
GGER SEAMS AND
RLAP FABRIC 6" IN
I -LIFT. OVERLAP
,LL FACE
NNSTREAM
WATER
SURFACE
ELEVATION
NOT TO SCALE
tszANCHOR Figure #3
QEA Proposed Stream Channel - Detail
Anchor QEA of North Carolina, PLLC
NC Firm License No. P-1649 Meadowmont at Givens Highland Farms -Phase 3
Black Mountain, Buncombe County, NC
STA
•
•GEd•111151DON
IN P
- - !
30 /-E-�-�•
E90901 .0
�
WAMIN
FLOW
I -IH I I IIVV
FRONT VIEW
(STAGGERED SEAMS)
INSTALLATION SPECIFICATIONS:
1. CLEAR ANY WOODY DEBRIS BELOW TOE PRIOR TO INSTALLATION.
2. LIFTS ARE CONSTRUCTED FROM BOTTOM TO TOP. ALIGNMENT OF LIFTS SHALL BE STAKED OUT PRIOR TO CONSTRUCTION FOR APPROVAL BY CLIENT/ENGINEER.
3. LAY COIR FABRIC PERPENDICULAR TO STREAM CHANNEL, OVER AN AREA THAT CAN BE COMPLETED AND STABILIZED DURING THAT WORKING DAY.
4. COIR FABRIC SHALL BE ROLLED OUT LENGTHWISE, PERPENDICULAR TO THE STREAM CHANNEL, SUCH THAT IT EXTENDS FROM 2/3 THE WIDTH OF THE GEOLIFT, MEASURED FROM THE NEAR BANK TOWARD THE
CHANNEL. DOWN -GRADIENT SECTIONS OF COIR SHALL OVERLAP UPHILL SECTIONS WHEN INITIALLY LAID OUT, WHERE APPLICABLE.
5. AMENDED NATIVE SOIL SHALL BE USED AS FILL MATERIAL FOR THE TOP LIFT. THE AREA ABOVE THE TOP LIFT SHALL BE TOP DRESSED WITH A MINIMUM OF 3" OF TOPSOIL AND BLENDED INTO THE NATURAL
GRADE. THE AREA SHALL THEN BE SEEDED AND COVERED WITH WEED FREE STRAW. AMEND AND IRRIGATE SOIL AS NEEDED.
6. MATERIAL SHALL BE CAREFULLY PLACED IN THE LIFTS AND COMPACTED OVER THE AREA UNTIL A THICKNESS OF 12". APPLY SEED TO TOP AND OUTSIDE OF SOIL INSIDE THE LIFT SO IT SHALL HAVE THE
OPPORTUNITY TO GERMINATE THROUGHT THE COIR MATTING.
7. COIR FABRIC EXTENDING FROM BENEATH THE COMPACTED SOIL SHALL BE TIGHTLY AND CAREFULLY WRAPPED, AND STAKED WITHIN A KEY TRENCH AND USING APPROPRIATE STAKES, STARTING AT THE PIECE
OF COIR FURTHEST DOWN SLOPE AND MOVING UP SLOPE ONE PIECE AT A TIME.
8. WRAPPED COIR SHALL EXTEND OVER THE COMPACTED SOIL LIFT TOWARD THE BACK OF THE BANK SO THAT PLACEMENT OF REMAINING SOIL SHALL PINCH IT IN PLACE.
9. LIVE BRANCHES SHALL BE HARVESTED FROM THE TIPS OF SPECIFIED TREE SPECIES BRANCHES THAT SHOULD BE FIVE TO EIGHT FEET IN LENGTH. LIVE BRANCHES SHALL BE PLACED GROWTH END OUT AND
ROUGHLY ADJACENT TO ONE ANOTHER SUCH THAT ONE TO TWO FEET EXTENDS BEYOND THE COIR WRAPPED LIFT. OUTSOURCED LIVE STAKE MAY BE USED. PROVIDE ENGINEER WITH SUPPLIER AND PLANT TYPE
BEFORE PLACING ORDER.
VEGETATED GEOLIFT
Publish Date: 01/20/17 1 User: S.Stavinoha
Filepath. \\ashevillel\asheville\Projects\Givens Highland Farms\16ac Site Development Phase 3\CADD\STREAM REST-16ac Site Development Phase 3.dgn
GGER SEAMS AND
RLAP FABRIC 6" IN
I -LIFT. OVERLAP
,LL FACE
NNSTREAM
WATER
SURFACE
ELEVATION
NOT TO SCALE
tszANCHOR Figure #3
QEA Proposed Stream Channel - Detail
Anchor QEA of North Carolina, PLLC
NC Firm License No. P-1649 Meadowmont at Givens Highland Farms -Phase 3
Black Mountain, Buncombe County, NC
EXISTING EARTHEN DAM AND INLET PIPE
2350
EXISTING GROUND SURFACE/POND OTTOM
2345 PROPOSED THALWEG CENTERLINE -
APPROXIMATE WATER SURFACE
2340 � ELEVATION OF POND: 2333.4
EXISTING EARTHEN DAM AND OUTLET PIPE
2335
2330
2325
2320
10+00 10+50 11+00 11+50 12+00 12+50
PROPOSED CHANNEL PROFILE
STA 10+00 TO 12+50
HORIZONTAL SCALE: 1"=30'
VERTICAL SCALE: 1 "=10'
Publish Date: 01/20/17 1 User: S.Stavinoha
Filepath: \\ashevillel\asheville\Projects\Givens Highland Farms\16ac Site Development Phase 3\CADD\STREAM REST-16ac Site Development Phase 3.dgn
kZANCHOR Figure #4
0 -EA Proposed Stream Channel - Profile
Anchor QEA of North Carolina, PLLC
NC Firm License No. P-1649 Meadowmont at Givens Highland Farms -Phase 3
Black Mountain, Buncombe County, NC