Loading...
HomeMy WebLinkAbout20170172 Ver 1_401 Application_20170217F&WK LETTER OF TRANSMITTAL WDICKSON community infrastructure consultants 401 41h Street, SW, Suite 201 Hickory, North Carolina 28602 828.327.6911 tel. n1 NC DWR, 401 & Buffer Permitting TO: Branch NWR 512 North S u Raleigh, NC 27604 ATTENTION: TO WHOM IT MAY CONCERN 70 1 72 DATE: 2/8/17 NEP Area 2 Water Distribution Systems Project: Mt. Carmel and Tiny Farms RE: Subdivisions PCN Package City of Asheville, NC We are sending via: ® Overnight ❑ Regular Mail ❑ Pick-up ❑ Hand Delivered The following items: ® Correspondence ® Plans ❑ Specifications ❑ Other as listed below: COPIES DATE NO. DESCRIPTION 4 2/8/17 1 PCN Package 2 2/8/17 2 Planset, sheet pages 22" x 34" 2 2/8/17 3 Planset, sheet pages 11" x 17"ffl U 1 2/8/17 4 $240 for review fee r.,9 017 ; I DE&VVA ER RES URCE; 4 1 & SUFfLRFILLIN THESE ARE TRANSMITTED as checked below: ® For Approval ❑ As Requested ❑ Approved as Submitted ❑ Returned for Corrections ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ Forward to Subcontractor REMARKS: COPY TO: Chad Pierce, City of Asheville SIGNED: Jordan Isenhour 1 O�O� W ATF9pG Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 A. Pre -Construction Notification (PCN) Form Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 12 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑X No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑X Yes ❑ No For the record only for Corps Permit: ❑X Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑X No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Asheville 2015 Water Distribution Projects -Group 2: Mt. Carmel and Tiny Farms Sub. 2b. 2c. 2d. 2e. 3. County: Buncombe Nearest municipality /town: Ashevillefif r—:--�u �0_ig a i Subdivision name: Mount Carmel, Lees Ridge U11 f - NCDOT only, T.I.P. or state project no: r Owner Information 40 Q -WATER RES 3a. Name(s) on Recorded Deed: Lees Ridge Subd Park Prop Parcel PIN: 9720300955 RM� DB 1376 PG 0476 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: Common Area, Lees Creek Road 3e. City, state, zip: Asheville, NC 28806 3f. Telephone no.: N/A 3g. Fax no.: N/A 3h. Email address: N/A Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: 4b. Name: David Melton, Interim Director of Water Resources 4c. Business name (if applicable): City of Asheville 4d. Street address: P.O. Box 7148 4e. City, state, zip: Asheville, NC 28802 4f. Telephone no.: (828) 251-1122 4g. Fax no.: (828) 259-5710 4h. Email address: dmelton@ashevillenc.gov 5. Agent/Consultant Information (if applicable) 5a. Name: Jordan Isenhour 5b. Business name (if applicable): WK Dickson & Co., Inc. 5c. Street address: 401 4th St. SW 5d. City, state, zip: Hickory, NC 28602 5e. Telephone no.: 828-327-6911 5f. Fax no.: 828-327-9164 5g. Email address: jisenhour@wkdickson.com Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 972030095500000 1 b. Site coordinates (in decimal degrees): ILatitude: 35.622167 Longitude: -82.625 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: UT to Lee Creek 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: French Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: This portion of the proposed water line will be constructed within an the existing NCDOT right-of-way. The surrounding area is grassed/lightly wooded and is primarily residential. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 490 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to replace and abandon portions of the existing water distribution system in the surrounding subdivisions. 3e. Describe the overall project in detail, including the type of equipment to be used: See attached narrative 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (includingall prior phases)in the past? ❑ Yes ❑X No ❑ Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? Preliminary E] Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? El Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Q Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts w If there are wetland impacts proposed on the site, then complete this question for eachwetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No W6 - [Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 T Excavation UT to Lee Creek PER Corps 8 20 S2 Choose one S3 Choose one - S4 Choose one - S5 Choose one S6 Choose one 3h. Total stream and tributary impacts 20 3i. Comments: See attached narrative Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 Choose one Choose 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then vou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet 61 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. See attached narrative 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. See attached narrative 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑X No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank El Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non -riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ❑X No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: No new impervious surface will be generated as a result of this project 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which localgovernment's jurisdiction is thisproject? ❑ Phase II ❑ NSW 3b. Which of the following locally -implemented stormwater management programs ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been EI Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state -implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ❑x Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State El Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in El Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non -discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes ® No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? North Carolina National Heritage Program database. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NOAA's National Marine Fisheries online database 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC State Historic Preservation Office online database 8. Flood Zone Designation (Corps Requirement) —T— 8a. Will this project occur in a FEMA -designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements; See attached narrative. 8c. What source(s) did you use to make the floodplain determination? FEMA Flood Insurance Maps David Melton Applicant/Agent's Printed Name Applicant/Agen 's Signature Date (Agent's signature is valid only if an authorization letter from the applicant isprovided.) Page 10 of 10 PCN Narrative Asheville 2015 Water Distribution Projects Group 2: Mt. Carmel and Tiny Farms Subdivisions for the City of Asheville, NC Nationwide Permit 12 Pre -Construction Notification Name and Address of the Applicant: City of Asheville c/o David Melton (Interim Director of Water Resources) PO Box 7148 Asheville, NC 28802 PCN Section B. Project Information & Prior Project History Item #3e: Project Description and Equipment The project consists of the installation of approximately 26,500 linear feet of 6 -inch water line throughout the Mount Carmel and Tiny Farms Subdivisions. The proposed system will connect to several existing water mains surrounding the project area. These connections include an existing 8 - inch water line along Odonald Road, an existing 6 -inch water ling along Mt. Carmel Road, and a proposed 6 -inch water line along Lees Creek Road that will connect to an existing 6 -inch water line located north of the intersection with Erwin Hills Road. The combined connections to the existing system will provide greater redundancy to the project area along with improved water quality. Typical equipment expected to be used includes, but is not limited to; track hoe excavator, backhoe, frontend loader, etc. The alignment for the proposed water lines were determined based on the existing water line locations, existing buildings, existing infrastructure such as overhead power lines, roadways, underground utilities, and topography. PCN Section C. Proposed Impacts Inventory Item #3i: Description of Proposed Stream Impacts There will be no permanent stream impacts. There will be one temporary stream impact of 20 linear feet. A temporary stream crossing is not proposed as the adjacent NCDOT road and 60" CMP culvert provides a means to transport equipment and material across the stream. The construction details contained in the plan drawings depict stream bank and bed stabilization. While rip -rap is proposed within the stream bed, it will be placed beneath a 6" thick layer of 50/50 mix of in situ soil material and #5 stone. Additional stream crossings do occur at the unnamed tributary crossing at Holly Hill Drive and at the Lees Creek crossing on Lees Creek Road as shown on the included USGS figure. However, these crossings occur above the existing culverts in both locations, and do not require any temporary or permanent stream impacts. PCN Section D. Impact Justification and Mitigation Item #la & #1b: Avoidance and Minimization To minimize impacts to surface water resources during project construction and maintenance; sediment and erosion control measures are included in the project's final design plans; in locations where water line installation across streams uses "open cut" method, crossings will be as close to perpendicular as possible, completed during low flow events, and monitored at least every three months for maintenance during the first 24 months following construction and annually thereafter; insecticides and herbicides will not be used within 100 feet of perennial streams or within 50 feet of intermittent streams or within floodplains associated with those streams. Ductile iron pipe will be used for the 6 -inch water line material and will be installed inside of a 14 -inch diameter steel encasement pipe as an additional safeguard and to facilitate any future repairs without the need of complete excavation. Ongoing on-site construction inspections will ensure that construction contractors are following all approved plans. PCN Section F. Supplementary Information Item #Sb: Flood Zone Designation Portions of the proposed water line are located in the FEMA 100 -year floodplain of Lees Creek. The water line will be installed below grade at the crossing of the unnamed tributary of Lees Creek. 2 State IZiYay 213 Mars -Hill Marshall N � 9at'�as o�a4 G 3 xj;-Iwav 63 e�eesterty� Project Area, Woodfin nonP�e���0 •N �at< Asheville r4o w zllq Interstate 40 E Smoke Par k HWY a ton v IP Biltmore Forest�3' Ui a x o � U Mills_ -River Montreat tl 140 Black Mountain E state St r Old Fort °� Chimney Rock Village may S� Lake Lure Fletcher 3 a x R°6 -R v 2 fey z d Cq Laurel Park Hendersonville NEP Area 2 Water Distribution Systems Project: Mt. Carmel and Tiny Farms Subdivisions Vicinity Figure City of Asheville, NC January, 2017 Legend Municipal Boundaries Buncombe County, NC NEP Area 2 Water Distribution Systems Project: Mt. Carmel and Tiny Farms Subdivisions USGS Figure Leicester and Weaverville Quad Maps City of Asheville, NC January, 2017 Legend Proposed Water Line ...... Existing Water Line 0 Peet 0 150 3110 600 900 1,200 WDIICKSON ��GOLDEN TRE�C` DAVIDADR ,l C FOSTER ESTATE DR O \ o° — 1 v AM ANG DR � 0��04 O vCRAFT Dk V / l � A VELVET RHA TIPPERARY DR / x- ,, x o w � _ WS1 (T) UT -Lee Creek 0-7x w (20 LF) Qq -7 11 pl� qa SR I �a4 i C1R BEN LIPPEN RD \titt�PC'C ctAt` ' JF7� T, � I Q LU NEP Area 2 Water Distribution Systems Project: Mt. Carmel and Tiny Farms Subdivisions Soils Figure City of Asheville, NC January, 2017 Legend Proposed Water Line ..... Existing Water Line Soil Type �J CkB2 ® CkC2 CkD2 Ct1B Ct1C EvD2 ® EvE2 EwD ExD FrA TaB [ TaC TmB TmC Ud ®UfB ® Ux yWaC2 �i WaD2 N F -t 0 150 wo wo %0 1,200 �DIICI<SON i m 1 a7 Q .r i � Oti4 t�c4 C FOSTER ESTATE DR O \ o° — 1 v AM ANG DR � 0��04 O vCRAFT Dk V / l � A VELVET RHA TIPPERARY DR / x- ,, x o w � _ WS1 (T) UT -Lee Creek 0-7x w (20 LF) Qq -7 11 pl� qa SR I �a4 i C1R BEN LIPPEN RD \titt�PC'C ctAt` ' JF7� T, � I Q LU NEP Area 2 Water Distribution Systems Project: Mt. Carmel and Tiny Farms Subdivisions Soils Figure City of Asheville, NC January, 2017 Legend Proposed Water Line ..... Existing Water Line Soil Type �J CkB2 ® CkC2 CkD2 Ct1B Ct1C EvD2 ® EvE2 EwD ExD FrA TaB [ TaC TmB TmC Ud ®UfB ® Ux yWaC2 �i WaD2 N F -t 0 150 wo wo %0 1,200 �DIICI<SON Legend Proposed Water Line • •� Existing Wa ter Line ■ Zone A, AH, AO,. A99, V ■ Zone AE, Zone AE 1% Annual Chance Flood Hazard Contained in Structure Zone AE Floodway Zone X, 1% Annual Chance Flood Hazard Contained In Channel, Floodway ■ Zone AE, Community Encroachment Area c ■ Zone VE Zone X, 0.2% Annual Chance Flood Hazard, 0.2% Annual Chance Flood Hazard Contained In Channel PZone X, 1% Annual Chance Future Conditions, 1% Annual Chance Contained In Structure ■ Zone X, 1% Future Conditions Contained in Channel, Community Encroachment Area IJ 9G Zone D Q i C j open water � R Zone X J� ALO z AMANGELA o� z � •$^ �0 4� � sW 4 '•. ] o� o 4� CRAFT DR N � O d � NrGV� L�`CES'CER �Cw 4� reek CNIL�SI vv yELVET RIDGE -Po TIPPERARY DR C4 p a m W S1 (T) UT -Lee Creek (20 LF) oU i NrC��F,na ►U 04 NEP Area 2 Water Distribution Systems Project: Mt. Carmel and Tiny Farms Subdivisions Flood Figure City of Asheville, NC January, 2017 no reet 0 150 300 600 %() 1.200 �DIICKSON eomm.mw m�,oa,ucm,a oonwn.— (D MAILBOX NOTICE TO CONTRACTOR THE CONTRACTOR SHALL IMMEDIATELY CONTACT W.K. DICKSON & CO., INC. @ 828.327.6811 IF ANY DISCREPANCIES ARE FOUND IN ELEVATIONS SHOWN. THE UNDERGROUND UTILITIES SHOWN HEREON WERE FIELD LOCATED BY NC SURVEY, P.C. FROM JANUARY, 2016 TO JUNE, 2016. THE ACCURACY OF FIELD MARKED UNDERGROUND UTILITIES IS +/- 30 INCHES HORIZONTALLY, UNLESS OTHERWISE INDICATED. THE DEPTH OF THESE UTILITIES IS UNKNOWN, UNLESS OTHERWISE INDICATED. THE UNDERGROUND UTILITIES WERE LOCATED USING A SOKKIA SET 48 TOTAL STATION USING THE NC GRID (NAD 83/2007) DATUM HAVING AN ACCURACY OF +/-1:75M. PLEASE NOTE THAT N.C. LAW REQUIRES THAT THE NC ONE CALL CENTER BE NOTIFIED PRIOR TO PERFORMING ANY EXCAVATION. CALL 811 OR 1-8W-832-4949 OR VISIT W W W.NCOCC.ORG. NEP AREA 2 WATER DISTRIBUTION SYSTEMS PROJECT MT. CARMEL AND TINY FARMS SUBDIVISIONS Know whars below. Cell before you dig CITY OF ASHEVILLE, NC JAN 2017 CITY OF ASHEVILLE CONTRACT NO.: WC -15-16-002 !-FR n A ?n, WK DICKSON NO.: 20150198.00.1-11 Vicinity Map NOT TO SCALE �D CKSON CWnmuniN intrashicture COnsultu is LEGEND Sheet Number EXISTING PROPOSED - - - - -- - - GIS PROPERTY BOUNDARY COVER ------ PROPERTY BOUNDARY ---- -ww- RIGHT -OF -WAV MT. CARMEL SUBDIVISION PAVING AREAS -39ACK-- SETBACK - - - - -PE PERMANENT EASEMENT - PE - CE CONSTRUCTION EASEMENT - CE - -^�-- PERMANENT DRAINAGE EASEMENT -PDE- - INDEX CONTOUR -100- - - - INTERVAL CONTOUR 96 LINE 'B' -STA. 0+00 TO STA. 9+50 STORM DRAINAGE PIPE o MID STORM DRAINAGE STRUCTURE C.9 OO STORM DRAINAGE MANHOLE • - HYDROLOGIC FEATURE - -X FENCE -X- TT GUARDRAIL T T -I--�-- RAILROAD LINE ---}-- T SIGN T C.15 I CURB AND GUTTER DAVLYN CT. AND MELISSA CT. CAB CONCRETE WALKIPAD l- DAVID CT. AND WESTMONT DR. - N - FORCE MAIN - FM - - GRAVITY SEWER - ss - UNE'N - STA. 10+00 TO STA 20+W SANITARY SEWER MANHOLE • uoo SANITARY SEWER CLEAN OUT CARDINAL DR. - - -w- - - BOTTOM OF BANK - BB - ---�---- TOP OF BANK -TB- LINE'O' - STA 20+00 TO STA 23+08t DITCH LINE - - -- �• OVERHEAD WIRE -OW- C.27 UNDERGROUND ELECTRIC - UE - -ro FIBER OPTIC CABLE - FO - - . UNDERGROUND GAS G - - - a - - - UNDERGROUND GAS (GIS) C.31 T UNDERGROUND TELEPHONE - UT - .0- POWER POLE / }i LIGHT POLE X E- GUY WIRE DA WATER DETAILS SHRUB UNE WATER DETAILS IVY-� TREE LINE Yl - K - WATER UNE - W - - - - - WATER UNE (GIS) D.7 KPe GATE VALVE N 011 EXISTING WATER METER D.10 PRESSURE REDUCING VALVE STATION DETAIL METER REPLACEMENT WITH NEW CONNECTION SEWER DETAILS METER RELOCATION WITH NEW SERVICE LINE . -- WATER SERVICE - W - AIR RELEASE VALVE 'Cr FIRE HYDRANT 14 TEMPORARY SILT FENCE 11111- ® TREE 0 O SHRUB O ary x SPOT ELEVATION ELE x BENCHMARK ELEVATION CHECK DAM INLET PROTECTION RIP -RAP (D MAILBOX NOTICE TO CONTRACTOR THE CONTRACTOR SHALL IMMEDIATELY CONTACT W.K. DICKSON & CO., INC. @ 828.327.6811 IF ANY DISCREPANCIES ARE FOUND IN ELEVATIONS SHOWN. THE UNDERGROUND UTILITIES SHOWN HEREON WERE FIELD LOCATED BY NC SURVEY, P.C. FROM JANUARY, 2016 TO JUNE, 2016. THE ACCURACY OF FIELD MARKED UNDERGROUND UTILITIES IS +/- 30 INCHES HORIZONTALLY, UNLESS OTHERWISE INDICATED. THE DEPTH OF THESE UTILITIES IS UNKNOWN, UNLESS OTHERWISE INDICATED. THE UNDERGROUND UTILITIES WERE LOCATED USING A SOKKIA SET 48 TOTAL STATION USING THE NC GRID (NAD 83/2007) DATUM HAVING AN ACCURACY OF +/-1:75M. PLEASE NOTE THAT N.C. LAW REQUIRES THAT THE NC ONE CALL CENTER BE NOTIFIED PRIOR TO PERFORMING ANY EXCAVATION. CALL 811 OR 1-8W-832-4949 OR VISIT W W W.NCOCC.ORG. NEP AREA 2 WATER DISTRIBUTION SYSTEMS PROJECT MT. CARMEL AND TINY FARMS SUBDIVISIONS Know whars below. Cell before you dig CITY OF ASHEVILLE, NC JAN 2017 CITY OF ASHEVILLE CONTRACT NO.: WC -15-16-002 !-FR n A ?n, WK DICKSON NO.: 20150198.00.1-11 Vicinity Map NOT TO SCALE �D CKSON CWnmuniN intrashicture COnsultu is 10 O o C Ugra a CJ Of cc U) Z 0 Lu O ~ 0 Q W co QN Z Q 0 -i Lu LJJ CC :D c Q _m a cr LLl Z Z (n � w Lu 3 � a J Q z LL cc W r O ° = U 0 0] N z 5 z ui �3 zz o o a 0 FILE PATH: RLE�PATH WKD PROJ. NO.: 20150198,00.1-I1 Sheet List Table Sheet Number Sheet Title GENERAL G.1 COVER 0.2 OVERALL PROJECT MAP G.3 WATER METER RELOCATIONS - MT. CARMEL RD. GA MT. CARMEL SUBDIVISION PAVING AREAS G.5 TINY FARMS R. WWSION PAVING AREAS TIPPERARY DR. AND MT. CARMEL DR CA LINE W - STA 0+00 TO STA. 9+60 C.2 LINE W - STA 9+50 TO STA 20+00 C.3 LINE W - STA 20+00 TO STA 30.00 CA LINE'W - STA 30+00 TO STA 40+00 C.5 UNE'W - STA. 40+00 TO STA 50+00 C.6 LINE W - STA 50+00 TO STA. 54+391 WICKLOW DR. C.7 LINE 'B' -STA. 0+00 TO STA. 9+50 C.8 LINE'B'-STA 9+50 TO STA. 16+24& SCOTTLYN DR. C.9 LINE 'C' - STA 0+00 TO STA 9+881 KILKENNY DR. C.10 LINED' -STA. 0+00 TO STA 9+911 LEES CREEK RD. - NORTH C.11 LINE'E'- STA. 0+00 TO STA, 9+931 LEES CREEK RD. - SOUTH C.12 LINE 'I' - STA 0+00 TO STA 7+00 CA3 UNEP- STA. 7+00 TO STA 13+721 WATERFORD CT. C.14 LINE G' - STA 0+00 TO STA. 7+751 KILDARE PL AND SCOTTLYN CT. C.15 I LINE 'H' - STA 0+00 TO STA 3+35t LINE T - STA 0000 TO STA. 2+851 DAVLYN CT. AND MELISSA CT. CAB LINE'S - STA. D+00 TO STA 3+491 UNE W - STA. 0+00 TO STA 3+264 DAVID CT. AND WESTMONT DR. C.17 I UNE'L' - STA. 0+00 TO STA. 3+021 UNE'W - STA 0+00 TO STA. 1+103 KEYSTONE DR. AND KEYSTONE DR EXTENSION CAB LINE W - STA. 0+00 TO STA. 10+00 C.19 UNE'N - STA. 10+00 TO STA 20+W C20 UNE W - STA 20+00 TO STA 30+00 C21 LINE'N'- STA. 30+00 TO STA. 39+141 CARDINAL DR. C.22 LINE'O'-STA. 0+00 TO STA. 10+00 C23 LINE ICY - STA 10+00 TO STA 20+00 C.24 LINE'O' - STA 20+00 TO STA 23+08t HOLLY HILL DR. AND FIELDCREST CIR. C.25 UNEP - STA. 0+00 TO STA 9+50 C26 LINE'P - STA 9+50 TO STA 19+00 C.27 UNE'P-STA 19+00 TO STA 29+00 C.28 LINE P' - STA 29+00 TO STA 39+00 C.29 UNE P' - STA. 39+00 TO STA. 48+903 FIELDCREST CT. AND HOLLY HILL DR. C.30 LINE 'a -STA. 0+00 TO STA 2+581 LINE'R'-STA 0+00 TO STA. 3+07* HOLLY HILL CT. C.31 LINE'S' - STA 0+00 TO STA. 8+70& WONDU VIEW CT. C.32 UNE T- STA D+W TO STA 5+331 N. CARDINAL DR C.33 LINE 'U' - STA 0+00 TO STA. 8+25t DETAILS DA WATER DETAILS D2 WATER DETAILS D.3 WATER DETAILS DA NOTES D.5 EROSION CONTROL DETAILS DA EROSION CONTROL DETAILS D.7 STREAM STABILIZATION DETAILS D.8 CITY OF ASHEVILLE DETAILS D.9 CITY OF ASHEVILLE DETAILS AND TRAFFIC CONTROLaDETAILS D.10 PRESSURE REDUCING VALVE STATION DETAIL 0.11 SEWER DETAILS 10 O o C Ugra a CJ Of cc U) Z 0 Lu O ~ 0 Q W co QN Z Q 0 -i Lu LJJ CC :D c Q _m a cr LLl Z Z (n � w Lu 3 � a J Q z LL cc W r O ° = U 0 0] N z 5 z ui �3 zz o o a 0 FILE PATH: RLE�PATH WKD PROJ. NO.: 20150198,00.1-I1 Mill -P! SEQUENCE OF CONSTRUCTION RECOMMENDATIONS: 1. INSTALL PROPOSED WATER LINES AND NEW SERVICE LINES. 2. FILL WATER LINES. PRESSURE TEST AND DISINFECT. 3. THE EXISTING WATER LINES THROUGHOUT THE PROJECT AREA MUST REMAIN IN SERVICE UNTIL PROPOSED WATER LINES ARE TESTED AND ACTIVATED. AT WHICH TIME WATER SERVICES CAN BE TRANSFERRED TO THE PROPOSED LINES. 4. TEMPORARY SERVICE INTERRUPTIONS TO THE EXISTING WATER LINES ARE ALLOWED TO MAKE FINAL TIE-INS. CONTRACTOR SHALL PROVIDE THE CITY AT LEAST 5 BUSINESS DAYS NOTICE BEFORE INTERRUPTING SERVICE. CONTRACTOR AND OWNER SHALL NOTIFY PROPERTY OWNERS OF SERVICE INTERRUPTIONS. 5. WATER LINES ABANDONED IN PLACE SHALL HAVE ALL REMAINING VALVES CLOSED AND ASSOCIATED VALVE BOXES REMOVED. MAIN LINE DISCONNECTED AS CLOSE AS POSSIBLE TO EXISTING VALVE. EXISTING LINE PLUGGED, VALVE CLOSED AND BOX REMOVED. ALL METER SERVICES RENEWED AND TRANSFERRED TO NEW WATER LINE. 6. ALL CUSTOMERS WITHIN THE MT. CARMEL SUBDIVISION SHALL HAVE PRVs INSTALLED ALONG WITH THEIR METER REPLACEMENT. PRVS SHALL BE HOUSED IN A BLACK PLASTIC IRRIGATION STYLE METER BOX THAT WILL BE LOCATED IMMEDIATELY FOLLOWING THE METER ON THE CUSTOMER SIDE. SEE RESIDENTIAL WATER PRV LOCATION DETAIL DRAWING D.3 HOLLY HILL DR. LINE "R" SEE DWG #C.30 (307 LF 6" WATER HOLLY HILL CT. LINE "S" SEE DWG # C.31 (500 LF 6" WATER UNE) (170 LF 2" WATER LINE) HOLLY HILL DR./ FIELDCREST CIR. LINE "P" SEE DWG #C.25 -C.29 (4,890 LF 6" WATER LINE) O, FIELDCREST CT. LINE "Q" SEE DWG #C.30 (150 LF 6" WATER LINE) (108 LF 2" WATER LINE) 411111111,/%, NEP AREA 2 WATER DISTRIBUTION SYSTEMS PROJECT MT. CARMEL AND TINY FARMS SUBDIVISIONS PROJECT MAP NOT TO SCALE MELISSA CT. LINE "K" SEE DWG #C. 16 DAVID CT. (236 LF 6" WATER LINE) LINE "L" (90 LF 2" WATER LINE) SEE DWG #C.17 (150 LF 6" WATER LINE) (152 LF 2" WATERLINE) NP PROPOSED GATE SCOTTLYN DR. �� i i VALVE, TYP. LINE "C" SEE DWG #C.9 Po i (968 LF 6" WATER LINE) o 0 DAVLYN DR. c�.00LINE "J" O SEE DWG #C.16 (349 LF 6" WATER LINE) SCOTTLYIN CT. LINE "I" , OP yia SEE DWG *C.15 ` ♦ ,� (132 LF 6" WATER LINE) (153 LF 2" WATER LINE) N N. CARDINAL DR. Iu LINE "U" SEE DWG #C.33got MT. EL R (625 LF 6" WATER LINE) 00 �4L, �+p0 07 +00 �5 0 �A4 CARDINAL DR. LINE "0" SEE DWG #C.22 -C.24 w (2,308 LF 6" WATER LINE) 7 , $ ` �I PROPOSED FIRE HYDRANT, TYP. 5+00 TIPPERARY DR T ./ OD MT. CARMEL DR. c LINE "A" ` SEE DWG # C.1 -C.6 or mp�c}�� oa n (5,439 LF 6" WATER LINE) 75s00 APPROX. LOCATION EXISTING CROSS COUNTF WATER LINE (SEE DWG C.19). WATER LINE TO o BE ABANDONED IN PLACE. CAP AND CLOSE EXISTING VALVES AT BOTH ENDS. KEYSTONE DR./ '* KEYSTONE DR. EXT. or ' LINE "N" SEE DWG #C.18 -C.21 (3,914 LF 6" WATER LINE) +Oo ' FIRE HYDRANT ASSEMBLY W/ 6" G.V., TYPICAL WONDU VIEW CT. LINE "r SEE DWG #C.32 (400 LF 6" WATER LINE) (133 LF 2" WATER LINE) WESTMONT DR. (DEAD END) LINE "M" SEE DWG #C.17 (110 LF 6" WATER LINE) WICKLOW DR. LINE "B" SEE DWG #C.7 - C.8 (1,624 LF 6" WATER LINE) - N - MOP. DATUM: NC GRID NAD W (2011) VERr. DATUM: NAW W KILDARE PL. LINE "H" SEE DWG #C.15 (200 LF 6" WATER LINE) (135 LF 2" WATER LINE) 01 KILKENNY DR. ' LINE "D" ' SEE DWG #C.10 (991 LF 6" WATER LINE) �- WATERFORD CT. ' LINE "G" SEE DWG #C.14 (331 LF 6' WATER LINE) ' (444 LF 2" WATER LINE) LEES CREEK RD. (NORTH) LINE "E" SEE DWG #C.11 „IR (993 LF 6" WATER LINE) PRESSURE REDUCING VALVE (PRV) VAULT LINE "F" LEES CREEK RD. (SOUTH) LINE "F" SEE DWG #C.12 - CA 3 (1,372 LF 6" WATER LINE) EX. FH, TYP. L J PROJECT TOTALS: 25,989 LF# 6" DUCTILE IRON PIPE 1,385 LFt 2" HDPE W/ TRACER WIRE �D CKSON 401 4TH STREET SW SUITE 201 HICKORY, NC 28502 M8211 -327 -Ml MSn327-0164 WWW.WKDK:KSON.COM NC LICENSE NOS -0374 x� W P i ¢ o LLJ Cq z a O `) a S N w o: I I I I I I I -I z UU 'O2 a O U rn W � E- O qg to M 2 > 0) U y U 5 a w mLL O >_tr Z EL F Ir z UU _1 O Q w cr3 N Q U Q (L SEI W z F z z I a p PROJ. MGR.: RH DESIGN BY: CH DRAWN BY: I CH/NS PROJ. DATE: I JAN 2017 DRAWING NUMBER: G.2 OF 49 WKD PROJ. NO.: 20150198.00.HI a C.PJB.M. ' PROPOSED LYNWOOD CIR ---------------- ---------------- MAG NAIL IN PVMT 6" D I,P WATER LINE " - SR I$Bg PROPOSED 20 LF OF 6"WATERLINE; — DAYLIGHT AT CREEK MUST OTHERWISE. @,. Ca -'.._.-.. .. _,v._ _ _ _ _ -- -N_____x____w_____w CONNECT TO EX. W WATER LINE _____-------------------- 00 2: 2092.26 Wco— W------ SERVICE LINE ON THE CUSTOMER SIDE OF THE METER. _.—. LYi VERTICAL ONLY THE PORTION OF THE HYDRANT LOCATED ABOVE GROUND SHALL BE RETURNED. /.g fi / WATER LINES ABANDONED IN PLACE SHALL HAVE ALL REMAINING STA: 9+93 t (LINE E) STA: 53+29 t (LINE / r 7M h LINE DISCONNECTED AS CLOSE AS POSSIBLE TO EXISTING VALVE. v 1 -PROP. RJ MJ 6'k6"x6' EXISTING LINE CAPPED/PLUGGED, VALVE CLOSED AND VALVE SOX REMOVED. ALL METER SERVICES SHALL BE RENEWED AND Wlt-6"GATE VALVE/ END RESTRAINED M.\ IfTINT PI 1 13 60' 0 0 100 YR FLOODPLAIN _,_______ .PROPOSED FIRE •>aosozr4Ww000 \ HYDRANT ASSEMBLY — — --�� -- NEW PRESSURE REDUCING VALVE STATION, SEE DETAIL W31 PROPOSED 55 LF (APPROX.) OF 6RERAIN LINE TO DAYLIGHT AT 11 1 11 1 11 1 11 C.PJB.M. APPROX. 55 LF OF 6" PVC 1. CONTRACTOR SHALL VERIFY LOCATION AND SIZE OF EXISTING WATER LINES AT ALL TIE-IN ---------------- ---------------- MAG NAIL IN PVMT DRAIN LINE PIPED TO 2. ALL WATER METERS, SERVICES, AND RELATED APPURTENANCES SHALL BE SCHEDULED FOR a0o ao' 80' N: 701380.33 DAYLIGHT AT CREEK MUST OTHERWISE. E!922837.56 BE 1% SLOPE OR GREATER FINAL LOCATION TO BE DETERMINED IN FIELD. 2: 2092.26 a Le® cleaz SERVICE LINE ON THE CUSTOMER SIDE OF THE METER. 5. OLD METER ASSEMBLIES SHALL BE REMOVED AND TURNED OVER TO THE CITY OF ASHEVIILE. 6. EXISTING FIRE HYDRANTS ARE TO BE REMOVED AND RETURNED TO THE CITY OF ASHEVILLE. VERTICAL ONLY THE PORTION OF THE HYDRANT LOCATED ABOVE GROUND SHALL BE RETURNED. /.g fi / WATER LINES ABANDONED IN PLACE SHALL HAVE ALL REMAINING STA: 9+93 t (LINE E) STA: 53+29 t (LINE / r 7M h LINE DISCONNECTED AS CLOSE AS POSSIBLE TO EXISTING VALVE. v 1 -PROP. RJ MJ 6'k6"x6' EXISTING LINE CAPPED/PLUGGED, VALVE CLOSED AND VALVE SOX REMOVED. ALL METER SERVICES SHALL BE RENEWED AND Wlt-6"GATE VALVE/ END RESTRAINED M.\ IfTINT PI 1 PROPOSED WATER UNE ` LEES CREEK RD. (NORTH)- LINE 'E' SEE DRAWING C.11 ew•nx ImnA / eo uowvr c l.y rJi PROPOSED WATER LINE MT. CARMEL DR. - LINE W SEE DRAWING C.8 21 21 21 21 Nil �—1S W 1. CONTRACTOR SHALL VERIFY LOCATION AND SIZE OF EXISTING WATER LINES AT ALL TIE-IN ---------------- ---------------- POINTS PRIOR TO ANY PLANNED ACTIVITY BEING SCHEDULED. GRAPHIC SCALE 2. ALL WATER METERS, SERVICES, AND RELATED APPURTENANCES SHALL BE SCHEDULED FOR a0o ao' 80' REPLACEMENT EXCEPT FOR THOSE ALREADY EQUIPPED WITH AMR DEVICES OR NOTED ------------ OTHERWISE. 3. WATER METERS INDICATED FOR RELOCATION SHALL BE RELOCATED TO FRONT OF BUILDING. HORIZONTAL FINAL LOCATION TO BE DETERMINED IN FIELD. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING NEW SERVICE LINES FROM NEW METER LOCATION TO THE NEAREST CONNECTION POINT TO THE EXISTING 20' 0 ,o' 20' SERVICE LINE ON THE CUSTOMER SIDE OF THE METER. 5. OLD METER ASSEMBLIES SHALL BE REMOVED AND TURNED OVER TO THE CITY OF ASHEVIILE. 6. EXISTING FIRE HYDRANTS ARE TO BE REMOVED AND RETURNED TO THE CITY OF ASHEVILLE. VERTICAL ONLY THE PORTION OF THE HYDRANT LOCATED ABOVE GROUND SHALL BE RETURNED. WATER LINE ABANDONMENT: WATER LINES ABANDONED IN PLACE SHALL HAVE ALL REMAINING VALVES CLOSED AND ASSOCIATED VALVE BOXES REMOVED. MAIN LINE DISCONNECTED AS CLOSE AS POSSIBLE TO EXISTING VALVE. EXISTING LINE CAPPED/PLUGGED, VALVE CLOSED AND VALVE SOX REMOVED. ALL METER SERVICES SHALL BE RENEWED AND TRANSFERRED TO THE NEW WATER LINE BY CONTRACTOR. w 100 YR FLOODPLAIN (APPROX. LOCATION) •>aosozr4Ww000 \ 11 1 11 1 11 1 11 tM�S(WrSSaeiMw7ITr"�-- z1Yo�WDan9Dlil.....ia5aeOww((Vv--z=.NLETPROTECTION,TYP,*E ••D DETAIL DW`8 EXISTING 8" WATERLINE �TA. : \� 0v9Ws -.8 UM'i•1N9G0't0P!0I®•\♦• . ,IN.I �—1S W 1. CONTRACTOR SHALL VERIFY LOCATION AND SIZE OF EXISTING WATER LINES AT ALL TIE-IN ---------------- ---------------- POINTS PRIOR TO ANY PLANNED ACTIVITY BEING SCHEDULED. GRAPHIC SCALE MIN. 10' EACH SIDE OF PROPOSED RUNE CROSSING UNLESS CURRENT LNG SEWER PIPE IS DUCTILE IRON. '.DINATE WITH UTILITIES, INC, SEE l+s+llri�`?• 12q FYnio�oti � \/ •rAowl D0000 C\ Herron claair,a a e DLTNP PMRIQA G � STA: 3+42 t � 14 LYPIID00 4iiR 1 -PROP. RJ 45° MJ BEND 8. {LDDa k:3 +5 1 -PROP. RJ 45° MJ BEND STA. 3+84t END RESTRAINED JOINT PIPE STA: 5+49 t 1 -PROP. FIRE HYDRANT -- D PROPOSED 8" D.I.P. WATERLINE ASSEMBLY � (EAST SIDE OPTION) SEE DETAIL W.16 n m m 171 ati \ /—/ ,,_ tee, ,�—�'—' •. j W \\\ ( I nv.zo•T. I PARALLEL TO EXISTING STEEL GASB 11NE; DOUBLE WRAP PIPE WITH 6 MIL. POLYETHYLENE WRAP FROM ) ) ! I I /—STA 3+54t TO STA, 14+22t. SEE p POLYETHYLENE ENCASEMENT NOTES: rooe wvzsn®ire LIL ePPm / eieosioloe00000 t.Pu0loau D•xL�iP •>YWIIOIro00a0 \ / e raro•oon mwP eLouPDSa e io \ Lm►o— 1. CONTRACTOR SHALL VERIFY LOCATION AND SIZE OF EXISTING WATER LINES AT ALL TIE-IN ---------------- ---------------- POINTS PRIOR TO ANY PLANNED ACTIVITY BEING SCHEDULED. GRAPHIC SCALE 2. ALL WATER METERS, SERVICES, AND RELATED APPURTENANCES SHALL BE SCHEDULED FOR a0o ao' 80' REPLACEMENT EXCEPT FOR THOSE ALREADY EQUIPPED WITH AMR DEVICES OR NOTED ------------ OTHERWISE. 3. WATER METERS INDICATED FOR RELOCATION SHALL BE RELOCATED TO FRONT OF BUILDING. HORIZONTAL FINAL LOCATION TO BE DETERMINED IN FIELD. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING NEW SERVICE LINES FROM NEW METER LOCATION TO THE NEAREST CONNECTION POINT TO THE EXISTING 20' 0 ,o' 20' SERVICE LINE ON THE CUSTOMER SIDE OF THE METER. 5. OLD METER ASSEMBLIES SHALL BE REMOVED AND TURNED OVER TO THE CITY OF ASHEVIILE. 6. EXISTING FIRE HYDRANTS ARE TO BE REMOVED AND RETURNED TO THE CITY OF ASHEVILLE. VERTICAL ONLY THE PORTION OF THE HYDRANT LOCATED ABOVE GROUND SHALL BE RETURNED. WATER LINE ABANDONMENT: WATER LINES ABANDONED IN PLACE SHALL HAVE ALL REMAINING VALVES CLOSED AND ASSOCIATED VALVE BOXES REMOVED. MAIN LINE DISCONNECTED AS CLOSE AS POSSIBLE TO EXISTING VALVE. EXISTING LINE CAPPED/PLUGGED, VALVE CLOSED AND VALVE SOX REMOVED. ALL METER SERVICES SHALL BE RENEWED AND TRANSFERRED TO THE NEW WATER LINE BY CONTRACTOR. w 100 YR FLOODPLAIN (APPROX. LOCATION) •>aosozr4Ww000 \ oD � CDS ffnvrri e �r STA 0+00 d19r PROPOSED PRV j SEE DETAIL W.31 A EGIN RESTRAIN D JOINT PIPE ,y8 STA: 0+80 3 (UNE F) _ 4 � � STA: 54+39 (LINE A) es y 1 -PROP. RJ MJ 6"x6'k6" TEE` W/3-8"GATE VALVES � 3 LBPp� aow PROPOSED 40 LF 14"0 x 1=0.250" YArarer STEEL CASING, INSTALSR lT8g LED BY STA: 0+64 t OPEN CUT, SEE DETAIL W.26 1 -PROP. FIRE HYDRANT ASSEMBLY - SEE DETAIL W.i6 STA: 0"69* 1-PROP. RJ 45' MJ BEND STREAM STABILIZATION, — STA:0+78t rSE�ETA\L 1 -PROP. RJ 45° MJ BEND STREA.t\t IMPACT NO. S\ STA. 2+90t � — BEGIN RESTRAINED JOINT PIPE \ \ ®o. RD =Ac* NOTES DWG. D.4 INV=]100.9) F IXa 8 100 YR FLOODPLAIN / (APPROX. LOCATION) PROPOSED LONG SIDE WATER Tai* SERVICE, TYP..� SEE DETAIL W.01 80�� V \ °" - ------:-1r m—P�---------- VERTICAL PROPOSED MME SEPARATION OF ------ftEXISTING -----------��7--------------------� _��,--------- — UTILITIES, UNLESS -----------��—Lt•►�--------------------------- OTHERWISE NOTED, SHALL BE: — -----------P\�—���-------------PPS\�-----------PP�P�---------- — 1'1►�-------------P�——P�PP�------------------- SANITARY SEWER - 18"MIN. — -----------��---.---------------a------------ — WATER LINES - 12* MIN. -----------=e-----------PPS---P�------------------------- • — ----------------------------------------------------------- / 1 1 0+00 0+50 ---------------- ---------------- —------------------ —------ ------------ ------------- --------!�----- --------------- ���� ��—����-------------PPS----P�-- 1 ° DD CKSON ' irltr4nrueWre nn 401 47H STREET SW SURE 207 HICKORY, NC 25802 mez5-327•w„ m528an-91e4 W W W.WKDICI4SON.COM NC LK:FJ4SE NO.F0374 PPOFESSIONAL SEAL I!IIIII�Im z w i U Ir o U > z a O y a ¢ N it 1 1 1 1 1 1 I�I z U W O rn Z a O � > LL g LLI 25 w h U 02 0 5LWL �8~ Z p Q r ZW N W jr Fw- CL w w w N Q J U Q D- w 11, Z J F Z 1— U QZ IIr o ICL PROJ. MGR.: RH DESIGN BY: CH DRAWN BY: CH/NS PROJ. DATE: JAN 2017 DRAWING NUMBER: C.12 OF 49 WKD PROJ. NO.: 20150198.00 11 1 11 1 11 1 11 1 11 1 11 1 1.1 .HI Y u CHECK DAM SIZED TO SUIT CONDI_._..----- 2"X 2" X 36" WOOI STAKES PLACED 5', CROSS PATTI ABOVE S( ./ AND TIED OFF TO STAKE AT BOTH ENDS 1. ALL MATERIAL TO MEET SPECIFICATIONS. 2. INSTALL SEDIMENT TUBES BY LAYING THEM FLAT ON THE GROUND. EXCESS MULCH CAN BE PLACED AT THE UPSTREAM SEDIMENT TUBE SOIL INTERFACE. 3. INSTALL SEDIMENT TUBES SO NO GAPS EXIST BETWEEN THE SOIL AND THE BOTTOM OF THE SEDIMENT TUBES. LAP THE ENDS OF ADJACENT SEDIMENT TUBES A MINIMUM OF 2 FEET TO PREVENT FLOW AND SEDIMENT FROM PASSING THROUGH THE FIELD JOINT. 4. INSTALL ENDS OF CHECK DAM POINTING SLIGHTLY UP THE SLOPE TO PREVENT RUNOFF FROM FLOWING AROUND THE FILTER SOCK. 5. INSTALL SEDIMENT TUBES IN SWALES OR DRAINAGE DITCHES PERPENDICULAR TO THE WATER FLOW AND EXTEND THEM UP THE SIDE SLOPES A MINIMUM OF 1 -FOOT ABOVE THE DESIGN FLOW DEPTH. 6. CHECK DAM SHOULD BE INSTALLED AT LOCATIONS INDICATED ON DRAWINGS. 7. SEDIMENT SHOULD BE REMOVED FROM BEHIND CHECK DAM ONCE THE ACCUMULATED HEIGHT HAS REACHED 1/2 THE HEIGHT OF THE CHECK DAM. 8. LOOSE FILTER MEDIA MAY BE BACKFILLED ON THE UPSLOPE SIDE OF THE SOCK TO ENHANCE PERFORMANCE. 9. CHECK DAM CAN BE DIRECT SEEDED AT THE TIME OF INSTALLATION. FILTER SOCK CHECK DAM NOT TO SCALE G FIGURE 1 INTITIAL ANCHOR TRENCH 10 FIGURE 3 TOP OF BANK TERMINATION EROSION CONTROL MATTING MUST MEET OR EXCEED THE FOLLOWING REQUIREMENTS: 1D0 %COCONUT FIBER (COIR) TWINE WOVEN INTO A HIGH STRENGTH MATRIX THICKNESS - 0.36 IN. MINIMUM. TENSILE STRENGTH - 1740 LBIFT MINIMUM SHEAR STRESS -4.5 LBSWFT FLOW VELOCITY -OBSERVED /2 FT/SEC WEIGHT -23 OZ/SY SIZE - 9.84 FT X 165 FT (180 SY) .C.' OR -0.002 OPEN AREA (MEASURED)- 48% SLOPES- UP TO A MAXIMUM OF 1:1 ysT MAX. WIRE FILTER FABRIC TO BE POLYPROPYLENE -/TIT wy FABRIC MESH NYLON, POLYESTER OR POLYETHYLENE u OPENINGS YARN OF MANUFACTURER TO BE a u m Oy • 36 SQ. IN. APPROVED BY ENGINEER. ELEVATION NOTES: 1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REMOVING AND DISPOSING OF SILT ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE. 2. FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (Q 20% MAX. ELONGATION) OF 301bs/LIN. IN., WIRE FABRIC REQUIRED. 3. IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 501bs/LIN. IN. @ MAX. 20% ELONGATION), WIRE FABRIC IS OPTIONAL, MAXIMUM POST SPACING = 6 FEET. 4. POSTS SHALL BE 1.331b/LF STEEL, MINIMUM, UNLESS OTHERWISE APPROVED BY ENGINEER. 'c) DIRECTION OF FLOW STAKE AT i'- INTERVALS� 11!1111 I I �i!i III I' III -:-11f - - III II LI�.I --fl Ifjj J1 -II( _- II NIL_I I IFI IILr]=11L START NEW ROLL IN CHECK SLOT. OVERLAP 6" MM MUM 1' FIGURE 2 INTERMITTENT CHECK SLOT / BEGINING OF NEW ROLL STAKE AT 1 INTERVALS TEMPORARY SILT FENCE NOT TO SCALE FIGURE 4 TERMINAL ANCHOR TRENCH EROSION CONTROL MATTING INSTALLATION NOT TO SCALE INSTALLATION NOTES: SITE PREPARATION GRADE AND COMPACT AREA. REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL. PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE CITY. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED. SEEDING SEE SPECIFICATIONS FOR SEEDING REQUIREMENTS. APPLY SEED TO SOIL BEFORE PLACING MATTING. WHEN USING PERMANENT LINER, APPLY ADDITIONAL SEED AFTER INSTALLATION AND FILL MAT WITH SOIL. INSTALLATION OVERLAP ADJACENT MATS 3" AND ANCHOR EVERY 18" ACROSS THE OVERLAP. THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE LOWER ELEVATION MAT. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. DO NOT STRETCH TIGHT. ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS. EXCAVATE INITIAL ANCHOR TRENCH 12"X6" ACROSS THE EMBANKMENT AT THE LOWER END OF THE PROJECT AS SHOWN ON SHEET 5. SEE FIGURE 1 FOR INITIAL ANCHOR TRENCH. PLACE 6"x 6" CHECK SLOTS AT 30' INTERVALS ALONG THE EMBANKMENT AND WEIR. SEE FIGURE 2. CUT 4"x 4" TRENCH ALONG TOP OF BANK FORMAT TERMINATION. EXTEND MAT TO THE EDGE OF THE ASPHALT OR 2 TO 3 FEET ABOVE THE CREST IF POSSIBLE. BEGINNING AT THE CENTER OF THE EMBANKMENT AT THE DOWNSTREAM END OF THE AREA TO BE LINED, PLACE THE END OF THE ROLL IN ANCHOR TRENCH AND SECURE WITH BIODEGRADABLE STAKES OR PINS. SEE FIGURE 1. PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 3" OVERLAP. SECURE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND COMPACT SOIL. UNROLL MAT OVER COMPACTED ANCHOR TRENCH, STOP AT NEXT CHECK SLOT OR TERMINAL ANCHOR.UNROLL ADJACENT ROLLS IN SAME MANNER, WITH A MINIMUM OF 3" OF OVERLAP. STAPLE AT 18" INTERVALS ALONG OVERLAP. FOLD AND SECURE MAT ROLLS TIGHTLY INTO CHECK SLOTS. LAY MAT IN CHECK SLOT, FOLD BACK AGAINST ITSELF, ANCHOR THROUGH BOTH LAYERS, BACKFILL AND COMPACT SOIL, CONTINUE ROLLING MAP UPSTREAM. SEE FIGURE 2. BEGIN NEW ROLLS IN CHECK SLOT, AND OVERLAP ENDS MINIMUM OF 1'. SEE FIGURE 4 FOR TERMINATION AT UPSTREAM END. OR WOOD POST FILTER FABRIC 36" MIN. WIDTH COMPACTED; 0 . II Qk- 5� 4" 'fii�-- NOTES 1 FT HEIGHT, 1 FT. BEYOND EDGES STEEL OR WOOD POST -- 36 ABOVE GRADE (MAX) r' i r) 2 a 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN DEPOSITS REACH 30% OF FENCE HEIGHT. 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFFSITE AND CAN BE PERMANENTLY STABILIZED. 3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. FLOW 10 FT. MAX. SPACING WITH WIRE SUPPORT FENCE 10' PONDING HEIGHT 9" MAX (RECOMMENDED) 'D RUNOFF STORAGE HEIGHT � I I I III E I ROCK SECTION DETAIL TRENCH WITH GRAVEL SILT FENCE - WIRE & STONE REINFORCED OUTLET NOT TO SCALE 1 0+00 EROSION CONTROL MATTING TABLES - FILTER FABRIC TINY FARMS SUBDIVISION UNE BEGIN STA LL L. LL F-O� Ff r/ GR GROUND O BEGIN STA END STA LINE A +00 4+50 ANCHOR FABRIC { ASSHOWN N SECTION ysT MAX. WIRE FILTER FABRIC TO BE POLYPROPYLENE -/TIT wy FABRIC MESH NYLON, POLYESTER OR POLYETHYLENE u OPENINGS YARN OF MANUFACTURER TO BE a u m Oy • 36 SQ. IN. APPROVED BY ENGINEER. ELEVATION NOTES: 1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REMOVING AND DISPOSING OF SILT ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE. 2. FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (Q 20% MAX. ELONGATION) OF 301bs/LIN. IN., WIRE FABRIC REQUIRED. 3. IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 501bs/LIN. IN. @ MAX. 20% ELONGATION), WIRE FABRIC IS OPTIONAL, MAXIMUM POST SPACING = 6 FEET. 4. POSTS SHALL BE 1.331b/LF STEEL, MINIMUM, UNLESS OTHERWISE APPROVED BY ENGINEER. 'c) DIRECTION OF FLOW STAKE AT i'- INTERVALS� 11!1111 I I �i!i III I' III -:-11f - - III II LI�.I --fl Ifjj J1 -II( _- II NIL_I I IFI IILr]=11L START NEW ROLL IN CHECK SLOT. OVERLAP 6" MM MUM 1' FIGURE 2 INTERMITTENT CHECK SLOT / BEGINING OF NEW ROLL STAKE AT 1 INTERVALS TEMPORARY SILT FENCE NOT TO SCALE FIGURE 4 TERMINAL ANCHOR TRENCH EROSION CONTROL MATTING INSTALLATION NOT TO SCALE INSTALLATION NOTES: SITE PREPARATION GRADE AND COMPACT AREA. REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL. PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE CITY. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED. SEEDING SEE SPECIFICATIONS FOR SEEDING REQUIREMENTS. APPLY SEED TO SOIL BEFORE PLACING MATTING. WHEN USING PERMANENT LINER, APPLY ADDITIONAL SEED AFTER INSTALLATION AND FILL MAT WITH SOIL. INSTALLATION OVERLAP ADJACENT MATS 3" AND ANCHOR EVERY 18" ACROSS THE OVERLAP. THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE LOWER ELEVATION MAT. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. DO NOT STRETCH TIGHT. ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS. EXCAVATE INITIAL ANCHOR TRENCH 12"X6" ACROSS THE EMBANKMENT AT THE LOWER END OF THE PROJECT AS SHOWN ON SHEET 5. SEE FIGURE 1 FOR INITIAL ANCHOR TRENCH. PLACE 6"x 6" CHECK SLOTS AT 30' INTERVALS ALONG THE EMBANKMENT AND WEIR. SEE FIGURE 2. CUT 4"x 4" TRENCH ALONG TOP OF BANK FORMAT TERMINATION. EXTEND MAT TO THE EDGE OF THE ASPHALT OR 2 TO 3 FEET ABOVE THE CREST IF POSSIBLE. BEGINNING AT THE CENTER OF THE EMBANKMENT AT THE DOWNSTREAM END OF THE AREA TO BE LINED, PLACE THE END OF THE ROLL IN ANCHOR TRENCH AND SECURE WITH BIODEGRADABLE STAKES OR PINS. SEE FIGURE 1. PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 3" OVERLAP. SECURE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND COMPACT SOIL. UNROLL MAT OVER COMPACTED ANCHOR TRENCH, STOP AT NEXT CHECK SLOT OR TERMINAL ANCHOR.UNROLL ADJACENT ROLLS IN SAME MANNER, WITH A MINIMUM OF 3" OF OVERLAP. STAPLE AT 18" INTERVALS ALONG OVERLAP. FOLD AND SECURE MAT ROLLS TIGHTLY INTO CHECK SLOTS. LAY MAT IN CHECK SLOT, FOLD BACK AGAINST ITSELF, ANCHOR THROUGH BOTH LAYERS, BACKFILL AND COMPACT SOIL, CONTINUE ROLLING MAP UPSTREAM. SEE FIGURE 2. BEGIN NEW ROLLS IN CHECK SLOT, AND OVERLAP ENDS MINIMUM OF 1'. SEE FIGURE 4 FOR TERMINATION AT UPSTREAM END. OR WOOD POST FILTER FABRIC 36" MIN. WIDTH COMPACTED; 0 . II Qk- 5� 4" 'fii�-- NOTES 1 FT HEIGHT, 1 FT. BEYOND EDGES STEEL OR WOOD POST -- 36 ABOVE GRADE (MAX) r' i r) 2 a 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN DEPOSITS REACH 30% OF FENCE HEIGHT. 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFFSITE AND CAN BE PERMANENTLY STABILIZED. 3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. FLOW 10 FT. MAX. SPACING WITH WIRE SUPPORT FENCE 10' PONDING HEIGHT 9" MAX (RECOMMENDED) 'D RUNOFF STORAGE HEIGHT � I I I III E I ROCK SECTION DETAIL TRENCH WITH GRAVEL SILT FENCE - WIRE & STONE REINFORCED OUTLET NOT TO SCALE 1 0+00 EROSION CONTROL MATTING TABLES MT. CARMEL SUBDIVISION TINY FARMS SUBDIVISION UNE BEGIN STA END STA. MATTING TYPE LINE BEGIN STA END STA MATTING TYPE A +00 4+50 STRAW NETTING N 0+30 10+00 STRAW NETTING A 4+50 ✓ Kse4���� tial r✓ 'c���e°Be�J°�4ssLi9 _ 11+00 EXCELSIOR A 6+50 7+30 ysT MAX. WIRE FILTER FABRIC TO BE POLYPROPYLENE -/TIT wy FABRIC MESH NYLON, POLYESTER OR POLYETHYLENE u OPENINGS YARN OF MANUFACTURER TO BE a u m Oy • 36 SQ. IN. APPROVED BY ENGINEER. ELEVATION NOTES: 1. THE CONTRACTOR SHALL MAINTAIN ALL SILT FENCING BY REMOVING AND DISPOSING OF SILT ACCUMULATIONS AS DIRECTED BY THE ENGINEER. FILTER FABRIC SHALL BE REPLACED WHEN IT HAS DETERIORATED TO SUCH EXTENT THAT IT REDUCES THE EFFECTIVENESS OF THE SILT FENCE. 2. FILTER FABRIC SHALL HAVE A MINIMUM TENSILE STRENGTH (Q 20% MAX. ELONGATION) OF 301bs/LIN. IN., WIRE FABRIC REQUIRED. 3. IF EXTRA STRENGTH FABRIC IS UTILIZED (MIN. TENSILE STRENGTH = 501bs/LIN. IN. @ MAX. 20% ELONGATION), WIRE FABRIC IS OPTIONAL, MAXIMUM POST SPACING = 6 FEET. 4. POSTS SHALL BE 1.331b/LF STEEL, MINIMUM, UNLESS OTHERWISE APPROVED BY ENGINEER. 'c) DIRECTION OF FLOW STAKE AT i'- INTERVALS� 11!1111 I I �i!i III I' III -:-11f - - III II LI�.I --fl Ifjj J1 -II( _- II NIL_I I IFI IILr]=11L START NEW ROLL IN CHECK SLOT. OVERLAP 6" MM MUM 1' FIGURE 2 INTERMITTENT CHECK SLOT / BEGINING OF NEW ROLL STAKE AT 1 INTERVALS TEMPORARY SILT FENCE NOT TO SCALE FIGURE 4 TERMINAL ANCHOR TRENCH EROSION CONTROL MATTING INSTALLATION NOT TO SCALE INSTALLATION NOTES: SITE PREPARATION GRADE AND COMPACT AREA. REMOVE ALL ROCKS, CLODS, VEGETATION, AND OBSTRUCTIONS SO THAT MATTING WILL HAVE DIRECT CONTACT WITH THE SOIL. PREPARE SEEDBED BY LOOSENING 3 TO 4 INCHES OF TOPSOIL ABOVE FINAL GRADE. TEST SOILS FOR ANY NUTRIENT DEFICIENCIES AND SUBMIT SOIL TEST RESULTS TO THE CITY. APPLY ANY TREATMENT SUCH AS LIME OR FERTILIZERS TO THE SOIL IF NEEDED. DO NOT MULCH AREAS WHERE MAT IS TO BE INSTALLED. SEEDING SEE SPECIFICATIONS FOR SEEDING REQUIREMENTS. APPLY SEED TO SOIL BEFORE PLACING MATTING. WHEN USING PERMANENT LINER, APPLY ADDITIONAL SEED AFTER INSTALLATION AND FILL MAT WITH SOIL. INSTALLATION OVERLAP ADJACENT MATS 3" AND ANCHOR EVERY 18" ACROSS THE OVERLAP. THE HIGHER ELEVATION MAT SHOULD BE PLACED OVER THE LOWER ELEVATION MAT. EDGES SHOULD BE SHINGLED AWAY FROM THE FLOW OF WATER. LAY MAT LOOSE TO ALLOW CONTACT WITH SOIL. DO NOT STRETCH TIGHT. ANCHOR MAT USING BIODEGRADABLE STAKES OR PINS. EXCAVATE INITIAL ANCHOR TRENCH 12"X6" ACROSS THE EMBANKMENT AT THE LOWER END OF THE PROJECT AS SHOWN ON SHEET 5. SEE FIGURE 1 FOR INITIAL ANCHOR TRENCH. PLACE 6"x 6" CHECK SLOTS AT 30' INTERVALS ALONG THE EMBANKMENT AND WEIR. SEE FIGURE 2. CUT 4"x 4" TRENCH ALONG TOP OF BANK FORMAT TERMINATION. EXTEND MAT TO THE EDGE OF THE ASPHALT OR 2 TO 3 FEET ABOVE THE CREST IF POSSIBLE. BEGINNING AT THE CENTER OF THE EMBANKMENT AT THE DOWNSTREAM END OF THE AREA TO BE LINED, PLACE THE END OF THE ROLL IN ANCHOR TRENCH AND SECURE WITH BIODEGRADABLE STAKES OR PINS. SEE FIGURE 1. PLACE ADJACENT ROLLS IN THE ANCHOR TRENCH WITH A MINIMUM OF 3" OVERLAP. SECURE WITH BIODEGRADABLE STAKES OR PINES, BACKFILL ANCHOR TRENCH, AND COMPACT SOIL. UNROLL MAT OVER COMPACTED ANCHOR TRENCH, STOP AT NEXT CHECK SLOT OR TERMINAL ANCHOR.UNROLL ADJACENT ROLLS IN SAME MANNER, WITH A MINIMUM OF 3" OF OVERLAP. STAPLE AT 18" INTERVALS ALONG OVERLAP. FOLD AND SECURE MAT ROLLS TIGHTLY INTO CHECK SLOTS. LAY MAT IN CHECK SLOT, FOLD BACK AGAINST ITSELF, ANCHOR THROUGH BOTH LAYERS, BACKFILL AND COMPACT SOIL, CONTINUE ROLLING MAP UPSTREAM. SEE FIGURE 2. BEGIN NEW ROLLS IN CHECK SLOT, AND OVERLAP ENDS MINIMUM OF 1'. SEE FIGURE 4 FOR TERMINATION AT UPSTREAM END. OR WOOD POST FILTER FABRIC 36" MIN. WIDTH COMPACTED; 0 . II Qk- 5� 4" 'fii�-- NOTES 1 FT HEIGHT, 1 FT. BEYOND EDGES STEEL OR WOOD POST -- 36 ABOVE GRADE (MAX) r' i r) 2 a 1. INSPECT AND REPAIR FENCE AFTER EACH STORM EVENT AND REMOVE SEDIMENT WHEN DEPOSITS REACH 30% OF FENCE HEIGHT. 2. REMOVED SEDIMENT SHALL BE DEPOSITED TO AN AREA THAT WILL NOT CONTRIBUTE SEDIMENT OFFSITE AND CAN BE PERMANENTLY STABILIZED. 3. SILT FENCE SHALL BE PLACED ON SLOPE CONTOURS TO MAXIMIZE PONDING EFFICIENCY. FLOW 10 FT. MAX. SPACING WITH WIRE SUPPORT FENCE 10' PONDING HEIGHT 9" MAX (RECOMMENDED) 'D RUNOFF STORAGE HEIGHT � I I I III E I ROCK SECTION DETAIL TRENCH WITH GRAVEL SILT FENCE - WIRE & STONE REINFORCED OUTLET NOT TO SCALE C 1 0+00 EROSION CONTROL MATTING TABLES MT. CARMEL SUBDIVISION TINY FARMS SUBDIVISION UNE BEGIN STA END STA. MATTING TYPE LINE BEGIN STA END STA MATTING TYPE A +00 4+50 STRAW NETTING N 0+30 10+00 STRAW NETTING A 4+50 6+50 FXCEL IOR N 10+00 11+00 EXCELSIOR A 6+50 7+30 STRAW NETTING N 11+00 25+00 STRAW NETTING A 7+30 6+50 EXCELSIOR N 25+00 26+00 EXCEL NOR A 8+50 14+55 STRAW NETTING N 26+00 33+00 STRAW NETTING A 14+55 23+60 MULCWGRASS N 33+00 34+00 EXCELSIOR A 23+ 24+80 STRAW NETTING N 34+00 39+15 STRAW NETTING A 24+U-25+10 MULCH/GRASS I 1 0+00 1 2+85 1 A 25+10 49+00 STRAW NETTING O 0+00 2+00 STRAW NETTING A 49*00 53+30 EXCELSIOR O 2+00 9+00 MULCH/GRASS STRAW NETTING K 1 2+65 1 3+00 O 9+00 21+00 STRAW NETTING B 0+00 16+29 STRAW NETTING O 21+00 22+95 EXCELSIOR C 1 0+00 1 9+65 1 STRAW NETTING D 1 0+00 1 9+00 1 STRAW NETTING +5 3+07 1 MULCH/GRASS E 1 0+00 1 9+80 1 MULCWGRASS S 0+00 0+50 MULCH/GRASS F 0.00 2+85 MULCW RASS F 2+85 5+00 STRAW NETTING F+00 2+85 8+00 MULCWGRASS F 8+00 11+50 STRAW NETTING F 11+50 1 13+20 MULCW BASS F 13+20 ­_ STRAW NETTING T 1 4+00 1 4+WJ I STRAW NETTING G 0«00 3+50 1 MULCH/GRASS G 3+50 5+50 STRAW NETTING G 5+50 7+00 MULCH/GRAS H 1 0+00 1 3+35 1 MULCH/GRASS I 1 0+00 1 2+85 1 STRAW NETTING J 1 0+00 1 2+00 1 STRAW NETTING K I 0+00 2+651 STRAW NETTING K 1 2+65 1 3+00 M LCH/ RASS L 1 0+00 1 3+00 MULCWGRASS M 1 0+000*95 STRAW NETTING M amsI 1+10 I MULCWGRA5- DWK DICKSON Commu' iNreslruclwe coricuBArRs 401 4TH STREET SW SUITE 201 HICKORY, NO 28602 (I)B28-327{6911 (08283279/64 W W W.WKDICKSON.COM NC DCENSE NO.F-0374 4+' v, PpOFIBSIONAI SFAI O o O � U z O Q Illlllllz U w O 'n z o. O ti Ln 2 > Lj N J m Q a z In O 02 J Sa O LL oc cc z z O 'n F Z O Q J w 3 w N Q cc W U D_ Lu z C z F W z O a o PROJ. MGR.:RH DESIGN BY: CH DRAWN BY: CH/NS PROJ. DATE: JAN 2017 DRAWING NUMBER: D.5 OF 49 WKD PROJ. NO.: 20150198.00.1-11 0+00 12a58 STRAW NETTING R 1 0+00 1 1+50 1 STRAW NETTING +5 3+07 1 MULCH/GRASS S 0+00 0+50 MULCH/GRASS S 0+50 2+00 EXCELSIOR S 2+DO 2+85 1 STRAW NETTING S 2+85 5+50 1 EXCELSIOR S 1 2+85 1 5+50 1MULCWGRASS T I 0+00 1 4+00 1 EXCELSIOR T 1 4+00 1 4+WJ I STRAW NETTING U 1 0+00 1 6+90 1 EXCELSIOR DWK DICKSON Commu' iNreslruclwe coricuBArRs 401 4TH STREET SW SUITE 201 HICKORY, NO 28602 (I)B28-327{6911 (08283279/64 W W W.WKDICKSON.COM NC DCENSE NO.F-0374 4+' v, PpOFIBSIONAI SFAI O o O � U z O Q Illlllllz U w O 'n z o. O ti Ln 2 > Lj N J m Q a z In O 02 J Sa O LL oc cc z z O 'n F Z O Q J w 3 w N Q cc W U D_ Lu z C z F W z O a o PROJ. MGR.:RH DESIGN BY: CH DRAWN BY: CH/NS PROJ. DATE: JAN 2017 DRAWING NUMBER: D.5 OF 49 WKD PROJ. NO.: 20150198.00.1-11 1 2"x2"x36" WOODEN STAKES EXCESS SOCK MATERIAL ./ DRAWN IN AND TIED OFF PLACED 5' O.C. CROSS / TO 2"x2" WOODEN STAKE, PATTERN ABOVE SOCK (TYP.) FILTER SOCK / ppb RDAD y 2"x2"x36" WOODEN FLOW 9��GR/ NONK 48x18 flOPO WOR" NSE o STAKES PLACED P?j COARSE AGGREGATE- 5'0.C. GGREGATE-5'O.C. CROSS PATTERN'x STONE SIZE = 2"-3' ROADMrORK se'x 8• R' y CULVERT PIPE ABOVE SOCK ROADWAY 6" THICK 12" MIN MINIMUM 8" FILTER SOCK ' WORN AREA 3 OR MORE FEET FROM EDGE OF SOCK STAKING CULVERT INLET- PLANMAINTENANCE: Sp• NOTE- NOT OTE NOT TO SCALE M�iV S ALL WARNING SIGNS SMALL BE A MINIMUM OF 48' x 48' AND REFLECTORIZED WHEN USED AT NIGHT. EXCESS SOCK MATERIAL MAINTAIN THE GRAVEL PAD IN A CONDITION TO Jp(iYS�(E ROAD CLASSIFICATION A PREVENT MUD OR SEDIMENT FROM LEAVING THE DRAWN IN AND TIED OFF 5�� URBAN(40MPHOR LESS) im' CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC Q� TO 2"x2" WOODEN URBAN (45 MPH OR GREATER) 350' 1 CURB STAKE, (TYP.) TOPDRESSING WITH 2 -INCH STONE. AFTER EACH RURAL 5w1 RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. OFF—HIGHWAY CONSTRUCTION SIGNAGE LAYOUT fj CURB IMMEDIATELY REMOVE ALL OBJECTIONABLE NOT TOSGNE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. l�A ,I STORM GRATE I TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NOT TO SCALE 500' Soo' 200't WIRE TIES, (TYP.) Fucww STORM GRATE FLAGMAN 8" FILTER SOCK8TM 8" FILTER SOCK 200't 1020T FLAGMAN ROADWAY ROAD WORK ° a 80-x 24' DRAIN INLET- PLAN OPTION "A" PLAN OPTION "B" PLAN ROADWAY10:1 TAPER I yeNR°u Km ,. ® RL>AD vuoMAN 2Wo CURB 8" EXESS SOCK MATERIAL TO _ FILTER SOCK SECURE MAN WX 24" MINS CONES TRAFFIC ° I 8" FILTER SOCK FLAG BE DRAWN IN AND TIED OFF / TO GRATE WITH RUBBER ROADENG WORK TRAFFIC 2"x2" WOODEN STAKE ROAD oNEIANE FucMAN TIE DOWNS woaK RDAD nHEAo CONES CONES AHEAD AHEAD 100' 1/2 MILE MAX. 100' WARNING SIGN SEQUENCE IN 1�- - -OPPOSITE DIRECTION SAME AS 1 FLAGMAN t CATCH C B A MAX. WORK AREA 200'x MAX. SHOWN ABOVE } CATCH _ - - BASIN WARNING SIGN SEQUENCE IN OPPOSITE DIRECTION SAME AS SHOWN ABOVE i r _ r; BASIN NOTE: _ Jy�.. Q� FUGR� ALL WARNING SIGNS SHALL BE A MINIMUM OF 48' x 48" AND REFLECTORIZED WHEN USED AT NIGHT. ROAD CLASSIFICATION A B C DRAIN INLET- SECTION CURBSIDE SECTION URBAN (40 MPH OR LESS) 100' 1o0' loo' URBAN (45 MPH OR GREATER) 350' 350' 350' NOS. NOTES: RURAL 500' 500' 500' 1. ALL MATERIAL TO MEET SPECIFICATIONS. ALL WARNING SIGNS SHALL BE A MINIMUM OF 2. FILTER MEDIA FILL TO MEET APPLICATIONS REQUIREMENTS. ON -HIGHWAY CONSTRUCTION SIGNAGE LAYOUT /8'x48 AND REFLECTORIZED WHEN USED AT NIGHT. 3. COMPOST MATERIAL TO BE DISPERSED ON SITE, AS DETERMINED BY ENGINEER. NOT TO SCALE SIGNAGE LAYOUT FOR CONSTRUCTION IN AN INTERSECTION INLET PROTECTION NoTTosmE NOT TO SCALE MAINTENANCE DURING THE ESTABLISHMENT PERIOD, CHECK GRASS -LINED CHANNELS AFTER EVERY RAINFALL. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL. INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR DURING OUT -OF -BANK FLOW. 1.6 LBS/SF MIN. SHEAR STRESS STRAW BLANKET OR APPROVED EQUAL, INSTALL PER MANUFACTURER'S RECOMMENDATION V -DITCH W/ MATTING DWK DICKSON m1myummYwm 401 4TH STREET SW SUNE 201 HICKORY, NC 28M 108283278911 M828 -V7-9164 W W W.VMICKSON.COM NO LICENSE NO.F-0374 rWM ��Y Ni 4 Pig p PROF IONAL SEAL 0 Q ¢ F US W U iro ti LU (IIIIIII$ U w 0 1n z a O rn S2 > LU n 1 m y m m zo ¢ o ¢ z O 1j H U ¢ z O Q J W 3 ¢ W N Q U CC a ui z tWJ z F U z a � PROJ. MGR.: RH DESIGN BY: CH DRAWN BY: CH/NS PRO,(. DATE: JAN 2017 DRAWING NUMBER: D.6 OF 49 WKD PROJ. NO.: 20150198.00.HI C7twl 2.0' 1 Li. CREEK CROSSING STABILIZATION NOT TO SCALE CHANNEL SEEDING CONSTRUCTION NOTES: 1, EACH RIP RAP PLACEMENT SHALL BE BEDDED IN LAYER OF FILTER 1. INSTALL EROSION CONTROL EROSION CONTROL MATTING FABRIC. PLACEMENT OF RIP RAP SHALL IMMEDIATELY FOLLOW THE -RYE (GRAN) @ 120 LBMCRE PROTECTION AS SHOWN ON PLAN. THE CONTRACTOR MAY PLACEMENT OF THIS LAYER. KEEP VOIDS TO A MINIMUM AND FORM A DENSE MODIFY OR RELOCATE EROSION SUMMER WELL GRADED MASS OF STONE. DO NOT DISLODGE THE UNDERLYING -GERMAN MILLET @ 40 LBIACRE ADIUS7MENTS FOR UNFORESEEN FlELD IONS. BASEOF FABRIC WHEN PLACING STONE. ALLHA ALL RELOCATION SHALL HAVE 2. MAXIMUM SLOPE OF THE CHANNEL BANK SHALL NOT EXCEED 1.0 FALL ECLANORNEEM0. HORIZONTAL TO 1.0 VERTICAL. FINISHED GRADE OF THE RIP RAP IS -- FILTER FABRIC TOBLEND WITH THE SURROUNDING AREA. MI PERMANENT RIPARIAN SEED X (IDEALLY PLANTED EITHER 3. STABILIZE GRADED BANKS WITH AUG -SEPT OR MARAPR) �l -REOTOP @ 7 LHIACRE 3. INSPECT RIP RAP PERIODICALLY FOR SCOUR OR DISLODGED - MI TCH GRASS @ 50 UNACRE S. INSTALL PLANTS AS DESCRIBED STONES(ESPECIALLY AFTER SEVERE STORMS) AND WEED BRUSH GROWTH. IN PLANTING NOTES ON THIS ROCK TOE 4. THE MINIMUM THICKNESS OF THE RIP RAP LAYER SHALL BE 24 INCHES OF CLASS B. EXIST BANK ������.. � (CLASS B) ALTERNATIVE SPECIES MAYBE USED UPON APPROVAL BY THE ENGINEER MATCH EXISTING STREAM BED GRADE 2.0' 1 Li. CREEK CROSSING STABILIZATION NOT TO SCALE CHANNEL SEEDING CONSTRUCTION NOTES: TEMPORARY SEED MIX 1. INSTALL EROSION CONTROL LATE YANTERIEARLY SPRING MEASURES AND TREE -RYE (GRAN) @ 120 LBMCRE PROTECTION AS SHOWN ON PLAN. THE CONTRACTOR MAY MODIFY OR RELOCATE EROSION SUMMER CONTROL MEASURES TO MAKE -GERMAN MILLET @ 40 LBIACRE ADIUS7MENTS FOR UNFORESEEN FlELD IONS. SUDMGRA99@50 UNACRE (ASA SUBSTITUTE) ALLHA ALL RELOCATION SHALL HAVE THE APPROVAL OF THE FALL ECLANORNEEM0. -RYE(GRAIN)@120 UNACRE 2. CAND GRUB AREA L VASIVE TRASH AND D(OTICIENABNE vecETAnon. MI PERMANENT RIPARIAN SEED X (IDEALLY PLANTED EITHER 3. STABILIZE GRADED BANKS WITH AUG -SEPT OR MARAPR) SEED AND MULGL -REOTOP @ 7 LHIACRE 4. INSTALL COIR FIBER IMT PER MANUFACTURER`S INSTRUCTION. - MI TCH GRASS @ 50 UNACRE S. INSTALL PLANTS AS DESCRIBED SEDGE @ 10 LBIACRE IN PLANTING NOTES ON THIS -RICE CUTGRASS @ 20 L&ACRE SHEET. NOM ALTERNATIVE SPECIES MAYBE USED UPON APPROVAL BY THE ENGINEER STREAM STABILIZATION NOTES NOT TO SCALE GRAVEL SUBSTRATE 50 / 50 MIX OF IN SITU SOIL AND # 5 STONE - TOP OF BANK _ FLOW B OF BANK A GRADE CONTROL ROCK 50 150 MIX EROSION CONTROL MATTING Z3 � O X(. w p I m MAXIMUM - WIDTH OF DISTURBANCE LIMITED TO 15' A STREAM BED CONTROL -PLAN VIEW MATCH EXISTING CHANNEL FULLBANK WIDTH— BANKFULL ELEVATION 04 1.5' MIN. INVERT SET AT PROFILE _ -7 CLASS B / 1 RIP RAP CONTROL MATTING GRADE �,q.•* FILTER-_' FABRIC TYP. GRAVEL SUBSTRATE GRADE CONTROL ROCK 50 / 50 MIX OF IN SITU SOIL 50 / 50 MIX CLASS B 11 RIP RAP AND # 5 STONE STREAM BED CONTROL - SECTION A -A BANKFULL ELEVATION R()TT()M T)F RIFFI F FILTER -- FABRIC GRAVEL SUBSTRATE 50 / 50 MIX OF IN SITU SOIL GRADE CONTROL ROCK AND # 5 STONE 50160 MIX CLASS B 11 RIP RAP STREAM BED CONTROL - PROFILE B B STREAM BED CONTROL DETAIL NOT TO SCALE [Bjjl PRIOR TO ANY LAND DISTURBING ACTIVITIES, CONTRACTOR SHALL CLEARLY MARK WITH ORANGE FABRIC FENCING ALL WETLANDS, STREAMS, SURFACE WATERS, AND RIPARIAN BUFFERS LOCATED ON THE PROJECT SITE WHERE IMPACTS ARE NOT ALLOWED. NO CKSON 401 4TH STREET SW SURE 201 HICKORY, NO 28802 (1)828327.8011 M828-3274164 W W W.WKDICKSON.COM NC LICENSE NO. 74 PRO SEAL Ir UU w c Z a O LU U) 02 Q0 m }}LL N ¢ Z m y � Q QLU W 3 2 � N � y WQ U Q W 6 Z z r LU z a ¢ a o PROJ. MGR.: RH DESIGN BY: CH DRAWN BV: CH/NS PRO,, DATE: JAN 2017 DRAWING NUMBER: D.7 OF 49 WKD PROJ. NO.: 20150198.007HI O U W U O� ¢ IIIIIIIIz