Loading...
HomeMy WebLinkAbout20140560 Ver 2_Modifications_20170210Carpenter,Kristi From: Ward, Garcy Sent: Friday, February 10, 2017 4:06 PM To: Carpenter,Kristi Subject: FW: Bridge 255 Beaufort County Revised Permit Mod Attachments: Beaufort 255 Narrative for Permit Mod.pdf; Beaufort 255 PCN Revised 2.pdf; Beaufort 255 Revised 2.pdf Kristi Lynn, Call me about this one. It's a long story. Thanks. From: Brame, Bill Jr. Sent: Tuesday, November 22, 2016 8:07 AM To: Tom Steffens <Thomas.A.Steffens@usace.army.mil>; Ward, Garcy <garcy.ward@ncdenr.gov> Cc: Johnson, Jay B <jbjohnson@ncdot.gov> Subject: Bridge 255 Beaufort County Revised Permit Mod Attached is revised documentation and a revised narrative for a permit mod for Beaufort 255. Please do not hesitate to contact me if there are any questions. I have sent hard copies via certified mail. Bill Brame Jr Division Environmental Specialist North Carolina Department of Transportation 252 439 2800 office 252 830 3352 fax bbrame(c�ncdot.qov 105 Pactolus Hwy P.O. Box 1587 Greenville, NC 27835-1587 -, . � - ,, � , � r � � •, ti a Email correspondence to and from this address is subject to the North Garolina Public Records Law and may be disclosed to third parties. Ernail correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third partie,:;. Transportation November 21, 2016 U.S. Army Corps of Engineers RegulaCory Field Office 2407 W. Sth St. Washington,N.C.27889 PAT McCRORY co�e.�o� NICHOLAS J. TENNYSON Secremry NC Division of Environment and NaCural Resources Division of Water Resow�ces, Washington District Office 943 WashingCon Square Mall Washington, North Carolina 27889 Attention: Tom Steffens, Garcy Ward Subject: Request for a permit modification for the replacement of Bridge #255 over Broad Creel< Canal on Terra Ceia Road (SR 1612) in Beaufort County with a culvert. WBS # 176P.2.R.47 The North Carolina Department of Transportation is replacing bridge #255 in Beaufort County with a culvert The cun�ent bridge is located on Terra Ceia Road (SR 1612) over Broad Creek Canal. Broad Creel< Canal is in the Tar-Pamlico Basin, but NCDWR does not claim jurisdiction; therefore the buffer rules do not apply. During construction of this bridge it was determined that additional rip rap would be needed to stabilize the banks. A sketch revision to the existing plan shows the locations of the rip rap and the linear foot of impacts. This past summer the agencies allowed us to stabilize the north slope adjacentto the junction ofa ditch that required immediate attention. Those impacts have not been accounted for yet. After consulting with Mr. Garcy Ward those impacts in addition to the impacts requested have been totaled and were added to the original 210' of impacts and now the new total is 338 linear feet. Included with this letter is permit/sketch revised drawing, and PCN page revision. If you have questions please call me at (252) 439-2800 Cc: Kristi Carpenter, DWR Sincerely, Jay B. Johnson Division Two Environmental Officer �Nothing Compares�� StzlcufNonLCarolinn I DepanmcnlofTmnxpo�laliun I Unismn2 105 Nadolnx Highway NCi9 Greenvflle Nonh Carolinn 27834 I Posl Of7ice Box 1587 I Urecnrflle, Nnnh Caruliun J835 (2>' �439 ?800 Q�oF wA rF9Qc � Y � � fl Y Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑X Section 404 Permit Section 10 ❑ rmit 1b. Specify Nationwide Permit (NWP) number: �4 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑X Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑X 401 Water Quality Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ For the record only for Corps Permit: because written approval is not required? 401 Certification: ❑ Yes ❑X No ❑ Yes ❑X No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank � Yes ❑X No or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h 0 Yes ❑ No below. 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Beaufort 255 2b. County: Beaufort 2c. Nearest municipality / town: Pantego 2d. Subdivision name: N/A 2e. NCDOT only, T.I.P. or state project no: 176P.2.R.47 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. N/A 3c. Responsible Party (for LLC if N/A applicable): 3d. Street address: 105 Pactolus Highway NC 33 P.O. Box 1587 3e. City, state, zip: Greenville, NC 27835 3f. Telephone no.: 252-439-2800 3g. Fax no.: 252-830-3341 3h. Email address: jbjohnson@ncdot.gov Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑X Other, specify: Division 2 Environmental Officer 4b. Name: Jay B. Johnson 4c. Business name North Carolina Department of Transportation (if applicable): 4d. Street address: P.O. Box 1587 4e. City, state, zip: Greenville, NC 27835 4f. Telephone no.: 252-439-2800 4g. Fax no.: 252-830-3341 4h. Email address: jbjohnson@ncdot.gov 5. Agent/Consultant Information (if applicable) 5a. Name: N/A 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Beaufort 255 Bridge to Pipe Replacement 1 b. Site coordinates (in decimal degrees): Latitude: 35.603113 Longitude: -76.743975 1 c. Property size: acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Broad Creek Canal 2b. Water Quality Classification of nearest receiving water: C; Sw; NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: NCSR 1612 (Terra Ceia Road) is a paved secondary road. Agriculture dominates the landscape. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 210 3d. Explain the purpose of the proposed project: Bridge to pipe replacement; the existing bridge has deteriorated and needs replacement. 3e. Describe the overall project in detail, including the type of equipment to be used: The 120' long steel plank floor bridge will be replaced with a 3-cell 9' x 13' reinforced concrete box culvert. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the � Yes ❑X No ❑ Unknown Corps or State been requested or obtained for this property / ro'ect includin all rior hases in the ast? Comments: 4b. If the Corps made the jurisdictional determination, what type � Preliminary ❑ Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for �Yes ❑X No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ❑X No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands Strea X� — tributaries Buffers Open 1�ters PQd Construction ❑ 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of impact Type of wetland Forested Type of jurisdiction Area of number Corps (404,10) or impact Permanent (P) or DWQ (401, other) (acres) Tem ora T W 1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W$ - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - Wg - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial (PER) or Type of Average Impact number intermittent (INT)? jurisdiction stream length Permanent (P) or width (linear Temporary (T) (feet) feet) S1 P Stabilization Broad Creek Canal PER Corps 20 88 $2 P Culvert Broad Creek Canal PER Corps 20 210 S3 P Stabilization Broad Creek Canal PER Corps 20 40 S4 T Diversion Canal Broad Creek Canal PER Corps 20 40 S5 - Choose one - - S6 - Choose one - - 3h. Total stream and tributary impacts 3�s 3i. Camments: 338 linear feet of permanent stream impacts and 40 linear feet of temporary impacts. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Tem ora T 01 - Choose one Choose O2 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse � Tar-Pamlico �tawba �ndleman Oth� 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation impact impact Permanent (P) or required? (square (square Tem ora T feet feet B� - Yes/No g2 - Yes/No g3 - Yes/No B4 - Yes/No B5 - Yes/No gg - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. No wetlands or buffers impacted. Permanent stream and temporary stream impacts are limited to what is needed to install the proposed pipe and stabilize the inlet and outlet end from erosion. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Use of existing roadway to operate construction equipment. 2. Compensato Miti ation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for � Yes ❑X No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this project? ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Usin a Miti ation Bank 3a. Name of Mitigation Bank: Type: Choose one Quantity: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Quantity: Type: Choose one Quantity: 3c. Comments: 4. Com lete if Makin a Pa ment to In-lieu Fee Pro ram 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires � Yes ❑X No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Yes ❑X No within one of the NC Ri arian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes � No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? o�o 2b. Does this ro'ect re uire a Stormwater Mana ement Plan? ❑X Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: Roadway runoff will discharge through vegetated roadway shoulders/fill slopes prior to entering the stream. Vegetated treatment swales are not required for this project. 2e. Who will be responsible for the review of the Stormwater Management Plan? DWR 401 Unti 3. Certified Local Government Stormwater Review 3a. In which local overnmenYs 'urisdiction is this ro'ect? N/A ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW apply (check all that apply): ❑ USMP � Water Supply Watershed � Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Pro ram Review �Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply �ORW (check all that apply): ❑ Session Law 2006-246 QOtheP: NPDES Permit 4b. Has the approved Stormwater Management Plan with proof of approval been � Yes ❑X No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? � Yes � No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the 0 Yes ❑ No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑X No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ SurFace Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in �Yes ❑X No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes ❑X No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes ❑X No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Onsite field investigation by Jay Johnson "No EffecY' 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NCWRC - See attached email 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation � Yes ❑X No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NCDOT HEU Historic Architecture and Archaeology 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: Designed to no-rise standards 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM Maps Jay B. Johnson 11-21-2016 Applicant/AgenYs Printed Name ApplicanUAgent's Signature Date (AgenYs signature is valid only if an authorization letter from the a licant is rovided. Page 10 of 10 NOTESa l) PROPOSED CULVERTo 3@9x13' RCBC ll' BURYJ EXIST lNG BRIDGE: 2@20': l@40'; 2@20', OAL = l20' �l"I�l: 1 G� yt �� OF RS re — -- -- 15 �__._�TB F _ BHOtlD ,' ��f EK Cl+NA(. �- - � C��+ss.tL k� TS NON-STANDARD HEADWALL RETAIN � b� F�k�Z \ � _� � F F F J F F \�\� I /� F�`'� ' � \ 1 � �� i R � � � � � I o 5E r•it_,�o-3-'«.-t-Ep \� �;�- F __ _ _ - - ._ . F �� ' = � �\ � F �� - FF ` F �� 45 TEMP STREAM IMPACTS �O / � ��.�,A�, Y, c � 0.g 5 -�- � - -- PERM STREAM IMPACTS � �{o + 3S 'H� � S.T. Wooten Corporation BRIDGE 06075i STA 12+60.83 L9- SKEW = 25.0° 3C9'X13' RCBC 20 LF OF iNLET CHANNEL IMPROVEMENT 30 LF OF DITCH IMPROVEMENTS EST CIASS 'i' RIPRAP = 100 TONS EST GEOTEXTILE = 160 SY ---T -TB-_ p ---F m �.. ,�.� R..�.. r'.i :c m��owen � n� TEWAR7 •,."" -•._.- PERhUT PLANS PERMIT DRAWING SHEET 6 Of 11 NON-STANDARD WINGWALL TOP SLOPE = 27.5:1 � 67 LF OF OUTLET ��� CHANNEL INPROVEMENT EST DDE = I70 CY EST CLASS 'I' RIPRAP = 125 T GEOTEXTILE = 260 SY E------- E DENOTES IMPACTS IN SURFACE WATER DENOTES TEMPORARY F -E� .� +�A;�_b�_ FP� dll � I a, S s iz'_ � z-- TONS � E ^ 0 0 N � N �f � a Z •� � � .� :� �����