Loading...
HomeMy WebLinkAboutNC0022691_Authorization to Construct_20170210Water resources ENVIRONMENTAL QUALITY ROY COOPER Govenror MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director February 10, 2017 Mr. Andrew Luter Chief investment Officer Yes AF Utilities EXP, LLC 1900 16th Street, Suite 950 Denver, Colorado 80202 SUBJECT: Authorization to Construct A to C No. 022691 A03 Yes AF Utilities EXP, LLC Autumn Forest WWTP Dear Mr. Luter: A letter of request for an Authorization to Construct was received January 9, 2017, by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 0.082 MGD Autumn Forest WWTP, with discharge of treated wastewater into the unnamed tributary to Reedy Fork Creek in the Cape fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of a new drum -based chemical feed system (aluminum chloride) for total phosphorus reduction consisting of two (2) 9 GPD at 110 PSI adjustable chemical feed pumps, piping, and controls; spill deck with 88 gallon containment capacity; housed in an existing electrical building; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NCO022691 issued October 1, 2016, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0022691. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may State of North Carolina I Environmental Quality ; Water Resources 512 N. Salisbury Street 11612 Mai] Service Center I Raleigh; North Carolina 27699-1612 919 807 6464 Mr. Andrew Luter, Chief Investment Officer February 10, 2017 Page 2 of 3 be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Winston-Salem Regional Office, telephone number (336) 776 - 9800, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Division of Water Resources, WQ Permitting Section — NPDES, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class Il, III and N facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. Mr. Andrew Luter, Chief Investment Officer February 10, 2017 Page 3 of 3 The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Sincerely, S. ay Zimmerman Director, Division of Water Resources cc: DWR/Winston-Salem Regional Office, Water Quality Programs Central Files NPDES File ecopy: Scott Huismann, P.E. Maryland Apex Engineering, PC Email: shuismann@apexcos.com Without Engineer's Certificate attached: Guilford County Health Department Yes AF Utilities EXP, LLC Autumn Forrest WWTP Authorization to Construct No. 022691A03 Issued February 10, 2017 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Autumn Forrest Wastewater Treatment Plant, located in Guilford County, hereby state that, to the best of my. abilities, due care and diligence was used in the observation of the following construction: Installation of a new drum -based chemical feed system (aluminum chloride) for total phosphorus reduction consisting of two (2) 9 GPD at 110 PSI adjustable chemical feed pumps, piping, and controls; spill deck with 88 gallon containment capacity; housed in an existing electrical building; in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environmental Quality. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature Date Registration No. Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DEQ/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617