Loading...
HomeMy WebLinkAboutNC0026000_December 2016 Facility Assessment_20170130Environmentail Quality January 30, 2017 Al J. Leonard J. Town of Tabor City PO Box 655 Tabor City, NC 28463 Tel: 910 653 3458 ROY COOPER Governor I%UCHAEL S. REGAN Secretary Ref: December 2016 Facility Assessment/ Corrective Action Plan/Recommendations Town of Tabor City WWTP; Permit No. NCO026000 Columbus County, North Carolina Dear 1�/[l r. Leonard, On December 07, 2016 the Water Quality Regional Operations Section (WQROS) received the Draft Facility Assessment/Corrective Action Plan prepared by WK Dickson for the Town of Tabor City. The conditions of the triplex influent pump station, flow equalization basin, headworks; aeration basins and clarifiers, aerobic digester and disinfection were assessed and a corrective action plan prepared. We are sharing our observations, providing suggestions,- and requesting pending items according to the facility assessment, our site inspections, and special conditions of permit No. NC0026000. The Town shall address the following comments within 60 days of receipt of this letter. FACI1LITY ASSESSMENT AND CORRECTIVE ACTION PLAN Rnf lent Pumping, Flow EquaUzation Basin, and 1H[eadworrks 1. Install VFD's on the influent pumps and same size motors to allow a constant flow of wastewater into the plant. Schedule: Within six months of CAP and necessary permit approvals. Nothing Compares- State om acres State of North Carolina I Environmental Quality 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 910-796-7215 2. Rotate use evenly between all three influent pumps to cut down on one pump becoming more fatigued and having a potentially shorter useful life. Schedule: Upon approval of CAP. 3. Install automated valves on the piping between the Influent Pump Station and EQ basin to divert flow to the basin as needed so that influent flow to the plant will stay at a constant level. Schedule: Within nine months of CAP and necessary permit approvals. 4. Add a staff gauge to the EQ basin to regulate levels within the basin. Schedule: Within one month of approval of CAP. Replace bar screen in influent wet well with an automated bar screen capable of capturing both large rags and debris and smaller screenings (Auger Monster type system or repair and move current mechanical bar screen to plant influent). Schedule: Within nine months of CAP and necessary permit approvals. The WiRO office believes that actions 1. through S. will result in an increased reliability at the head of the plant, offering solutions to problems the facility has experienced with surcharges at the headworks not capturing large solids such as rags and debris (implementation of item 5. requires an A -to -C). We further agree with automated diversion of excessive flows to the equalization basin, as it was intended in the design. It is worth noting that addressing UI problems within the collection system could mitigate high influent flows that aggravate the problem at the headworks. To illustrate, following the last upgrade completed in 2009, it was reported to and/or observed by Wilmington Regional Office (WIRD) staff that the headworks containing the bar screen would overflow if all three pumps in the expanded and upgraded influent pump station operated, and in some cases, surcharging the entire headwork would occur if two pumps operated over a long period. It appears that the third pump was designed to operate if one of the other pumps failed or be used to divert flow to the side -stream surge basin v constructed during the same upgrade. however, diverting flow to the surge basin requires a valve to be manually operated to initiate the process and again to cease the diversion. Since the operation has been manual, it could lead to excessive flow surging into the treatment system if the ORC is not present to operate the valve. These surges can cause the excessive loss of activated sludge to the chlorine contact chamber and beyond (solid losses have been documented in the past). 2/5 V Ac iration Basins and CRairiifien s 6. Move RAS piping from location at end of Clarifier #1 directly adjacent to effluent weir to an area that is more conducive to proper mixing/aeration and longer detention times for RAS flow. Suggested location is North side of Upper Aeration Basin #1 near the start of the tank, directly across from the influent flow weir. Ile -laying this pipe will remove the possibility of short circuiting of the RAS flow. It is believed that this short circuiting may have caused solids over -loading in Upper Clarifier #1. Schedule: Within six months of CAP and necessary permit approvals. While relocation of the RAS piping to the opposite end of the aeration basin will likely remove the possibility of RAS short-circuiting, it does not offer an explanation of the reported low flow or clogging. A hydraulic profile and calculated flow velocities, and an internal evaluation of pipes such as camera inspection would help to insure the proposed solution will alleviate the issue. 7. Install valves on piping and flow meters to be able to control RAS/WAS flow to/from Upper Clarifier #1 (also if there is not a flow meter on RAS/WAS valves for Lower Clarifier #2, install flow meter on that piping as well). Schedule: Within six months of CAI' and necessary permit approvals. Agree. The installation of valves and flow meters in the RAS/WAS lines are necessary to control the plant and are a welcome addition. Implementation of item 7. requires an A -to - C' 8. Dig and replace/reconfigure piping leading into Upper Clarifier #1. Use larger pipe sizes and less severe bend angles to reduce possibility of pipes clogging. Schedule: Within six months of CAP and necessary permit approvals. What piping is the statement addressing? It seems that it refers to the 4" WAS line. Please clarify. Changes in piping configuration are expected to be shown in updated drawings of f the subject treatment unit (i.e. Clarifier #1). Implementation of item 8. requires an A -to -C 9. For Lower Aeration Basin #2: Tie D® level results from D® probe in Lower Aeration Basin #2 to existing VFD's on the three floating aerators. This will allow for more efficient power usage so that aerators are not operating continuously and will only turn on as needed to keep oxygen at required levels. Schedule: Within two months of approval of CAP. Agree. 3/5 Aerrobic Digester and ChRorrine Contact Basin 10. Replace the mixer in the Aerobic digester with a larger size mixer/aerator. This will result in better mixing and aeration for the aerobic digester. Schedule: Within nine months of CAIS and necessary permit approvals. Agree. 11. Coat the walls of the chlorine contact basin with a coal tar epoxy to help protect the basin walls from the corrosive nature of chlorination. Schedule: Within nine months of CAP and necessary permit approvals. To assist with cleaning of the chlorine contact chamber given that filters will not be provided, WiRO recommends to provide dual disinfection system or to install a gating/diversion system to allow half of the unit to be taken off -.line at a time during ideal flow conditions. It is also recommended to switch from gas to liquid disinfection. Otherwise, consider flow paced dosing of chlorination/dechlorination chemicals. PENDING ffTE S 1. Mercury Minimization Ph%n (MMF) F) This is a reminder that a MMP is required by [Special Condition A. (4)]. The condition indicates that the MMP shall be developed within 180 days of the NPDES Permit Effective Date. The MMP should place emphasis on identification of mercury contributors and goals for reduction, and shall be available for inspection. Please provide a copy of the MMP with the response to this letter. 2e Updated Drawings, Specifications, and Operation and Maintenance PRan. r ' During one of our inspections in 2015, it was observed that updated drawing(s) depicting the current/operating units and its hydraulic profile was not available. Part of the CAP submittal should include (1) drawings of the current and proposed layouts (plant view and profiles) of the facility treatment units and their hydraulic profile; (2) Updated Specifications and Operation and Maintenance Plan. 3. Time Lines and Yundinng Avafla kflnllitty Part of the CAP submittal should include realistic timelines for completion of proposed work according to funding acquisition and agency's approvals (i.e. A -to -C, etc). 4/5 If you would like to discuss the CAP before submittal of the final document, please contact me at mc)rella.sanchez-king_@ncdeiir. ov and we can. set up a meeting as needed. Sincerely Mor I Ze ing, Phl), PE . Environmental Program Supervisor III Mater Quality Regional Operation Section Wilmington Regional Office: 127 Cardinal Drive Extension; Wilmington, NC 28405 cc. WK Dickson & Co., Inc. 616 Colonnade Drive 11 Charlotte, NC 28205 I lAtt: Jimmy Holland Central Office File- Attention: John Hennessy WiRO/WQROS file NCO026000 5/5