Loading...
HomeMy WebLinkAbout20170167 Ver 1_17BP 12 R 13_hyd_permit_package_20170207/.wo' � I�II�;hWc1y North Carolina Department of Transportation 51vYtYlWilff'1" ��� ,,,,,.,�,,, Highway Stormwater Program \=� STORMWATER MANAGEMENT PLAN �`"'�� (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.12.R.13 TIP No.: County(ies): Gaston Page 1 of 2 General Project Information WBS Element: 17BP.12.R.13 TIP Number: Project Type: Bridge Replacement Date: 1/22/2017 NCDOT Contact: Trish Beam - Division Environmental Supervisor Contractor / Designer: HNTB North Carolina, P.C. / James A Byrd, PE Address: 1710 E. Marion St. (US 74 Business) Address: 343 E. Six Forks Road PO Box 47 Suite 200 Shelb , NC 28151 Ralei h, NC 27609 Phone: 704 480-9044 Phone: 919 424-0437 Email: dbeam ncdot. ov Email: 'ab rd hntb.com Cit ITown: McAdenville Count ies : Gaston River Basin s: Catawba CAMA County? No Wetlands within Project Limits? No Pro'ect Description Pro'ect Len th lin. miles or feet : 0.09 Surrounding Land Use: Urban / Residential Proposed Pro'ect Existin Site Pro'ect Built-Upon Area ac. 0.32 ac. 0.29 ac. Typical Cross Section Description: 2- 12' asphalt paved lanes with 2' curb and gutter section, 8' sidewalk and grass 2- 12' asphalt paved lanes with 4' concrete sidewalk. Existing drainage discharges shoulders. All drainage structures are to be replaced in a manor that replicates the directly into the surface water in all four quadrants. existing drainage patterns. In the northeast quadrant the outlet of the existing drainage system is pulled back from the pond and a grass lined 'V' ditch is proposed. Annual Avg Daily Traffic (veh/hr/day): Desi n/Future: TBD Year: TBD Existin : 4400 Year: 2014 General Project Narrative: State project 17BP.12.R.13 involves the replacement of Gaston County Bridge #0008 on SR 2209 (Wesleyan Dr.) over an Unnamed Tributary of the South Fork Catawba River. (Description of Minimization of Water The existing bridge consists of 1@ 25' - 5", and 1@ 25' - 8", reinforce concrete deck on I-beams. It is to be replaced with a 1@ 60' - 0" Cored Slab Bridge at the same location. Quality Impacts) All stormwater from the bridge and roadway approches will be collected by a storm drainage systems and discharged into the surtace waters as it presently does. In the northeast quadrant however, an effort to gain grass swale treatment has been made by pulling back the existing drainage outfall and providing a 30' grass lined 'V' ditch to treat runoff as it approaches the pond. Waterbody Information Surface Water Body (1): UT to the South Fork Catawba River NCDWR Stream Index No.: 11-129-(15.5) NCDWR Surface Water Classification for Water Body Primary Classification: Water Supply V(WS-V) Supplemental Classification: None Other Stream Classification: Impairments: Aquatic T&E Species? Comments: NRTR Stream ID: Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? Yes Deck Drains Discharge Over Buffer? No Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? No (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the (If yes, provide justification in the General Project Narrative) General Project Narrative) HI hWa North Carolina Department of Transportation s"� �StOYC lwc`�tPY ��,�I ,,,,,.,�.,, Highway Stormwater Program STORMWATER MANAGEMENT PLAN — (Version 2.07; Released October 2016) FOR NCDOT PROJECTS WBS Element: 17BP.12.R.1 TIP No.: County ies): Gaston Page 2 of 2 Swales Station & Coordinates Surface Base Front Back Drainage Recommended Actual Longitudinal Rock BMP Sheet (Road and Non Road Water Width Slope Slope Area Treatm't Length Length Slope Q2 V2 Q10 V10 Checks Associated w/ No. Pro'ects Bod it (H:1 H:1) ac ft (ft) % cfs f s cfs f s Used Buffer Rules? 4 13+60.5 RT (1)UT to the 0.0 2.0 2.0 0.7 70 30 1.00°/ 2.6 1.8 3.4 1.9 No No 35.258 / -81.076 South Fork Additional Comments Notes: Site constraints prevent the use of 3:1 Side Slopes and additional length. 6 BANK STABILIZATION WETLAND & STREAM IMPACTS HNTB NOflTH CAROLINA, P.C. PROIECTREFERENCENO. SHEETNO. DETAIL 1 DETAIL 2 �INTB 3a3 e. six Forks aoad, suite zoo � O see DETAIL 1 VBP.12.R.13 4 BANK STABILIZATION SPECIALLATERAL'V'DITCH � Raleigh, Nol'th Ca1'Olina 27609 � � No� �o s�ale� Top of Bonk 1 No� ra s�oie� CLASS 'll' RIP-RAP ._� _ N C L i C e n S e N 0: C- 1 5 5 4 RNJ SHEET NO. sFr �m;,,� �.5:� ESL 25 TON$ --�TEMP. SHORING ROADWAY DESIGN HYDRAULICS �I I� � i � ,. . � ��i EST. 45 SYGF ___ Proposed Hoiu�al � N �urol �� � .. ,_� � � _ ENGINEER ENGINEER -� - , O NOT � /li BqNK $TABILIZATION -� NAD 83� 78" RCP-III �����d ��a 2o Ft �����d �, 0 1• �����d � r ,�� � �1'd1p TII I ROJECT U.BI .12.R13 NSRs zoo� 623 DI TURB �eme.rie e.�si��y Z��4 _ �ry_ !.D' �/ SEE DETAIL 1 � � J ' / �r� ' , � CLA55 'll' RIP-RQ.P �,�°^d ^^'^, °- ,.° F,. esT. zs roNs =Lf- POT STA.16 +89.41 ryaa o, ���e, c�a=, ��� R�, �ap u�e ��" REMOVE �� � �� EST. 45 SYGF END CONSTR UCTION PROM -L- STA.13+60 TO STA.13+90 (RT) - -- _ FROM L- STA.13t13 TO STA.13+33 LL '� { WALLF�_ -' � . , ,, Faonn � srn.i3+73 ro srn.ia+os �r. '� €A�= I� �� BEGIN /END SAFt'i`' �-rNCE -L- STA. 14 50 � _ �_���, � � ���le '���� . �, ��_� a� , � " O - O - - � � � � � � If ;_ PERMANENT $TREAM IMPACT$ - 27 LF , BEGI11l TIP PRO ECT 17.BP12.R13 I I-- -- -_ � � N remaoxaxv srxenm imrnas - ze iF DOCUMENT NOT CONSIDERED FINAL CH KU RETAINING WALL IMPACTS (POND� = 0.00 Ac/0 SF =, -L- POC STA. IZ �' OO.00 - _- -- -_ . PUE --T ?uE :� PUE TeMaoanuv sueFnce wnrea �Manas �voNo� = o �F UNLESS AL� SIGNATURES COMPLETED ;EtK2F __ ___ , R I ' S95 �tRE �E�T _ - / - � i - _ - _ --- . � , HORD I ,� - J i i -L- POC STA 11 +75.00 , �.o --- ------ ` _ : E E E S F / I�� F� F . , , BEGIIV COIVSTRUCTION .�--' _ _ _ - , � . �, ,,,,���" � � � ^ -� _ _ � ys , � s _ --� � _ � � - - , _ .F - -- - - - BEGIN /END SAFETY FENCE �� E __� -� � � � � �-L- �� -L- STA. 11 - 75 (RT) , � � keMove'� aoaoao " � ' � w� �,/� � PERMANENT STREAM IMPACTS = 2] Lf �0� . CB-G� O .' .�, � -' . . TEMPORARV STREAM IMPACTS = 31 LF , RETAINING WALL IMPACTS �POND) - 00 Ac/0 SF .� i, �- ? F� � / / � / C . O � �- � TEMPORARY $URFACE WATER IMPAGT$ �PON�� = 0 LF � O � � O OOO � �� F _. - - -• ,�;i,R� - . ... i-z� D !�,� O pDE . .. �. . � � � � , . _ � c i s 2a�� RCP-w E E--E �-. � ` r -��> ' S CHORD \— RE OVE � REMOVE - �� —E � � � . -�� - REMOVE EXISTING � � 0 24" RCP-III �� � �� � � .— � � � � ,-�: � ��� � � ----" CB 8 12" CMP ' , F m - � ' - .. � . 15' RCP-III � I - 4 �� -� 4�. . -- -.. � � SCALE: 1' =40� PDE-�j ; Q �\� � �a:b•ts � JS . ��, V � �- •• � � LEGEND CLASS B' RIP-RAP -_- � � :F �,, '= 7�. Zb.��h' % , \, � � esr. i roNs � BEGIN /END SAFETY NCE � � ' ��� � � � ..:,_ � � DENOTES IMPAGTS IN EST.S $YGF _ ' y � sueFnce wnreR -L- STA. 13+93 (RT) � . ��.� � �S (POND) i � �i c�� t�`b' " � DENOTES IMPACTS IN O � li � SPECIAL LAT.'V' DITCH �� SURFACE WATER I �', I � SEE DETAIL Z O PERMANENT STREAM IMPACTS W40 tF � � �DENOTES TEMPORARY - _ � �� � , I 4 REfnINGRWntiREnM cTSP eoNDl = So.oa Ac /o SF IMPACTS W SURFACE WATER I try � �. i TEMP. SHORING TEnnPOItARY SURFnCE WnrER IMPAQS (PONDI = 15 LF d :��s wa_ �' y I I.. /�;�� EELIMrU ifoN��INVFLTMFNTr �i�,'cIDP �+eJ5 I��- ,.__ PERMANENT STREMs IMPACTS = 0 LF - L� "-I TEMPOR4RY STREPM IMPACITS = 14 LF �I" f� r ,-F o NOTES: TEMPOR4RY SURFACE WATEAP�IMPDA'CTS �PONO�A� �93 LF I ' ' 1. WATER SURFACE ELEVATION UPSTREAM OF PROPOSED � CONSTRUCTION SHALL BE MAINTAINED AT EL. = 579A FT. 2. STREAM IMPACTS END AT THE DOWNSTREAM FACE OF THE EXISTING BRIDGE. RIGHT DITCH ----------- : I BRIOGE HYDRAUUC DATA _ _ _—_ ____ ____ __ __ __— __ __ _ _____ L _— -_ -._. - -__ _ __- _. : _,-__ . - _ --_- -___-_ . -. .____ �x rS MATERIAL70: BEREMOVED �DESIGN DISCHARGE = 800 CFS ; - � � �- DESIGN FREQUENCY = 25 YRS _, I ___ � � � � � � � � � �-- -__�______ DESIGN HW ELEVAT�ON = 583J FT -- ----- ,', ', � � � � � � � BASE DISCHARGE = 900 CFS =_- ' _ 62O BASE FREOUENCY = l00 YRS � 'I I I ___ -I I' 620 BASE Hw ELEVATION = 5833 FT - � � OVERTOPPING DISCHARGE _ 1000+ CFS � ' ' - ' '� OVERTOPPING FREQUENCY= � 500 f+J YRS ESURF:�C[[y - 610 OVERTOPPING ELEVATION = 585J FT __ 1- __ __� � � � i � �i STA� 16+84.41 ' �i 610 -1-� _.�.- ��-- 2.95 : -� �� , � _ � --- � i � i � i i - _ i-HEGIr1�RA :-- �-: -- � � - : : � i i � � --- DATE OF SURVEY = �0/26/20/6 -�- STA--12+oo.e — �- - --- ELEV - 585.37 � -= I I_ - PI = 14+00.00 - END GRADE - 6OO W.S.ELEVATION - -- EL = 584.37' = BEGIN 1.5" MILLING _ --- - - AT DATE OF SURVEY = 579.35 FT -� - �_; _ � I AND RESURFACING ��_ __ I ^ j i i i j K= 3 9 I L STk. 95� 50.00 E- �. 60� W.S. EL. � 579:35' , vc = aoo� , ' "� � �: : _ _ ���� � ; SURVEY �0 26-16 � v= so nnPH I 590 - I ! �— _ --- _ � oa ' - - --- — 590 - - ---- � -'— �+�r.z�p4-�- - - - -- - , � �� � �.� � � � � � � � � . . . . � . .. �. �. �. 4 �. � .- � )0.5000% y . j I �JHO � � r END SPECIAL � � � � FJHO � , _ - ----- r , � � �� i � � �f r i- . � j 1:00% � - LAT �>�T _�,-^ i : � -.--� _:�: DIT H RT : — - BM#1 PI ��13+90.00 - 6, _ -L- STA. 17+76.04, 37.96' LT I EI 681:05 i i � 570 - BENCH TIE IN POWER POLE BffiN' $PECIAL'tAi. "V' D1TC-}#' it'-- , 570 ^ ELEV. = 589.75 L� o � . . � wo . _ . . . . . � i. PI -13+60AQ � d i_ i C� � � I � i u.i ....1�.........1 ��.... .. +.... ..I.. +.. . .. - . � ..... .... . p E� - 580.74 . . � I � � . . . , - M . . . �I . . � c"l. . . . . . . . . . �. �. .. � �. i i �� i n� i 1 J�`� - 560 �' mQ t mQ � � � 560 � -� � -- - - - --- , , � � _- i i- - � - i-i _-= � N . . . . -- -- - . I l� � {] -' � ��.. �: �-'- M . � . . . . . . . . . . . . . m � . . . . � . . ZJ . . . . . _..—_ .. .. '--_. ... .--.. .. — —. —.--_ .--. .— __— .— . ' .—. .--. ' .--_. . . w I .. .—'— '-- —_ .. . . .. .— —.. .—'-- I . .— . . _—.. — ..— . .-- --.—.. .—.—. —.—.— '-- — .--.� .. .-- '—_-- .--. —.. .. . —. . . iY. . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . ., . . . . , . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . �V c� 550 550 N� :� �; 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 �, : . 6 BANK STABILIZATION wETLAND & STREAM IMPACTS HNTB NOflTH CAROLINA, P.C. PROIECTREFERENCENO. SHEETNO. DETAIL 1 DETAIL 2 �INTB 3a3 e. six Forks aoad, suite zoo � BANK STABILIZATION SEE DETAIL 1 VBP.12.R.13 4 � SPECIALLATERAL'V'DITCH � Raleigh, Nol'th Cal'Olina 27609 � �"°"° s`°�`� Top of Bonk ���� r� s��ie! CLASS 'll' RIP-RAP .__ N C L i c e n s e N o: C- 1 5 5 4 ww SHEE7 No. , 5, esr. 2s roNs —7EMP. SHORING sFr �m, � � ROADWAY DESIGN HYDRAULICS °�I I� �; i i � � EST. 45 SYGF � Proposed Hoiu�al � N �urol _ � � ENGINEER ENGINEER Ground L'ne 2_p Ft Go�nd 1. \ Ground . .. r- -, � �8�� RCP-III DO NOT . �� � r a rr� ���eia����ir2� aea ��°°d �� M��,o= �.o F�. .��. , DI TURB .�� ��� � � BANK STABILIZATION � NAD 83� � - � �- ' SEE DETAIL 1 �� > > J TII I ROJECT 17.BI .12.R13 NSRS 2007 _- � � CLA55 'll' RIP-RAP i esr.zs roNs =Lf— POT STA.16+89.41 YP � e P P LI�e REMOVE I � � EST.45 SYGF END CONSTRUCTION PROM -L- STA.73+60 TO STA.13+90 (RT) WqLL& �'. � Feonn -�- srn. ia,ia ro srn. is+ss �r. BEGIN /END SAFETY f-ENCE �i PROM -L-STA.13+73 TO S7A.14+05 LT. II. PA� �� � ___ ..i�� . �., � O � I � �' y ��� �i -L- STA. 14 50 (LTl � � � I � BEGI11i TIP PRO ECT 17.BP.I2.R13 � ' i�j �' IJ - "E"�,"E"T STRE"", �""`"`TS . 2' " ti, , : 1�= � remaoxaxv srxenm imrnas - ze iF DOCUMENT NOT CONSIDERED FINAL RETAINING WALL IMPACTS (POND� = 0.00 Ac /0 SF -L- POC STA.12 + 00.00 pU'e —T? E� ' : 7UE I Temaoanuv sueFnce wnrea �mancrs �voNo� = o�F UNLESS AL� SIGNATURES COMPLETED 'SEK�F - FiRE GE�- _� R � J HORD , i -L- POC STA 11 + 75.00 S F E , E E F— F BEG71V COIVSTRUCTION - - - - E - - - -- � � � __ ,-_.. �j . - , � . _, - ' _ s �--_�--� � ` � - - . i r. .. . - - - � ...>-�, ` �-. - - - ��.. . .�- - � _ � � - - O � �- . . ��� .,,. � - ., - - � - - _- - - - '- - - BEGIN /END SAFETY FENCE � E _- � �j I � � -L- STA. 11 - 75 (RT) � -L- ,— w� wA /j� C/ , / � keMove ' aoaoao " ` � PERMANENT STREAM IMPACTS = 2] Lf ��C� / 'J� J �B-G� � �E � ' TEMPORARV STREAM IMPACTS = 31 LF '� �, �, RETAINING WALL IMPACTS �POND) - 00 Ac/0 SF � . / i / / � � _ _ . -a . }— � . � TEMPORARY $URFACE WATER IMPAGT$ �PON�� = 0 LF � " - ����-- - ' _ o �,, oo --�—,- _ - w�e, � _. -fz- � /�'�� � � p�E i .. � y p . . �..� .... , � E E ' c i s 2a�� RCP-w i E��E .�-: CHORD � RE OVE � REMOVE - ���� —E � � � .� � �. r � � REM VE EXISTING � � 0 24" RCP-III - � � ' � � .— �� � �� ,-": , ------ CB 8 12" CMP �� .. � �"-'� pA;6°{6 �"?!'' ./$ F / - - �- � ,��, �` ' is° RCP III SCALE: 1"=40� PDE-�j ; � � � oeNores innrncrs iN c�nss�sr� 5� s� F �-�, �� � � gEGIN /END SAFETY NCE g �� ��� � ; �� �� � �����' ��� � LEGEND h . '� � �S � �PONoj E wnreR - -L- STA. 13 +93 (RT) O �6 �� DENOTES IMPACTS IN O . . � SURFACE WATER 'i .. ��_ . SPECIAL LAT. 'V' DITCH SEE DETAIL Z O PERMANENT STREAM IMPACTS W40 tF � DENOTES TEMPORARY _ __ — ' TEr.�PORARY STREnM IMPACTS = 15 LF IMPACTS IN SURFACE WATER O- I �TEMP. SHORING 4 REfnING WntIIMPACTS (POND)= o.oaAc/oSF TEMPORARY SURFACE WATER IMPACiS (PONDI = 15 LF y I _ I�� ,5... W3 i� _... /�"�� EELIM�U if°NCLi,�iNVFLTMFNTr ,'-i�,'cIDP 4e�=G, I �- ,.�_ PERMANENT STREMs IMPACTS - 0 LF I �_ "�I TEMPOR4RY STREPM IMPACTS = 14 LF I �^ NOTES: iEMeoRa.xv sunFrice"w`nTe�PON",P°a�cTs �eoNo�"`="0v's iF � � ' � 1. WATER SURFACE ELEVATION UPSTREAM OF PROPOSED � CONSTRUCTION SHALL BE MAINTAINED AT EL. = 579A FT. 2. STREAM IMPACTS END AT THE DOWNSTREAM FACE OF THE EXISTING BRIDGE. RIGHT DITCH ----------- : I BRIOGE HYDRAUUC DATA _ _ _—_ ____ ____ __ __ __— __ __ _ _____ L _— -_ -._. - -__ _ __- _. : _,-__ . - _ --_- -___-_ . -. .____ �x rS MATERIAL70: BEREMOVED �DESIGN DISCHARGE = 800 CFS ; - � � �- DESIGN FREQUENCY = 25 YRS _, I ___ � � � � � � � � � �-- -__�______ DESIGN HW ELEVAT�ON = 583J FT -- ----- ,', ', � � � � � � � BASE DISCHARGE = 900 CFS =_- ' _ 62O BASE FREOUENCY = l00 YRS � 'I I I ___ -I I' 620 BASE Hw ELEVATION = 5833 FT - � � OVERTOPPING DISCHARGE _ 1000+ CFS � ' ' - ' '� OVERTOPPING FREQUENCY= � 500 f+J YRS ESURF:�C[[y - 610 OVERTOPPING ELEVATION = 585J FT __ 1- __ __� � � � i � �i STA� 16+84.41 ' �i 610 -1-� _.�.- ��-- 2.95 : -� �� , � _ � --- � i � i � i i - _ i-HEGIr1�RA :-- �-: -- � � - : : � i i � � --- DATE OF SURVEY = �0/26/20/6 -�- STA--12+oo.e — �- - --- ELEV - 585.37 � -= I I_ - PI = 14+00.00 - END GRADE - 6OO W.S.ELEVATION - -- EL = 584.37' = BEGIN 1.5" MILLING _ --- - - AT DATE OF SURVEY = 579.35 FT -� - �_; _ � I AND RESURFACING ��_ __ I ^ j i i i j K= 3 9 I L STk. 95� 50.00 E- �. 60� W.S. EL. � 579:35' , vc = aoo� , ' "� � �: : _ _ ���� � ; SURVEY �0 26-16 � v= so nnPH I 590 - I ! �— _ --- _ � oa ' - — --- — 590 — — ---- � —'— �+�r.z�p4-�— — — — -- — , � �� � �.� � � � � � � � � . . . . � . .. �. �. �. 4 �. � .- � )0.5000% y . j I �JHO � � r END SPECIAL � � � � FJHO � , _ - ----- r , � � �� i � � �f r i- . � j 1:00% � - LAT �>�T _�,-^ i : � -.--� _:�: DIT H RT : — - BM#1 PI ��13+90.00 - 6, _ -L- STA. 17+76.04, 37.96' LT I EI 681:05 i i � 570 - BENCH TIE IN POWER POLE BffiN' $PECIAL'tAi. "V' D1TC-}#' it'-- , 570 ^ ELEV. = 589.75 L� o � . . � wo . _ . . . . . � i. PI -13+60AQ � d i_ i C� � � I � i u.i ....1�.........1 ��.... .. +.... ..I.. +.. . .. - . � ..... .... . p E� - 580.74 . . � I � � . . . , — M . . . �I . . � c"l. . . . . . . . . . �. �. .. � �. i i �� i n� i 1 J�`� - 560 �' mQ t mQ � � � 560 � -� � -- — — — --- , , � � _— i i— — � — i—i _—= � N . . . . -- -- — . I l� � {] -' � ��.. �: �-'- M . � . . . . . . . . . . . . . m � . . . . � . . ZJ . . . . . _..—_ .. .. '--_. ... .--.. .. — —. —.--_ .--. .— __— .— . ' .—. .--. ' .--_. . . w I .. .—'— '-- —_ .. . . .. .— —.. .—'-- I . .— . . _—.. — ..— . .-- --.—.. .—.—. —.—.— '-- — .--.� .. .-- '—_-- .--. —.. .. . —. . . iY. . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . ., . . . . , . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . �N cLL 550 550 �� ..� �; 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 �, : . WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fillln Fillln in Clearing in SW SW Impacts Impacts Stream No. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 -L- STA.12+23 TO STA. 12+98 RETAINING WALL < 0.01 1 -L- STA. 12+98 TO STA. 13+71 24" CORED SLAB BRIDGE 0.06 1 -L- STA. 13+21 TO STA. 13+92 BANK STABILIZATION 0.01 27 TOTALS*: 0.01 0.07 27 0 0 *Rounded totals are sum of actual impacts NOTES: 1. Stream impacts end at the downstream face of the existing bridge. 2. Temporary surface impacts in pond where included in the temporary surface water impacts column. 3. There are 1043 SF of temporary surface water impacts in the pond and 2047 SF of temprary surface water impacts in the stream. 4. Permanent surface water impacts in pond represented in the permanent surFace water impacts column (106 SF). 2016 09 09