Loading...
HomeMy WebLinkAboutNC0040070_Compliance Evaluation Inspection_20150526 A 'A NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald van der Vaart Governor Secretary May 26, 2015 Mr. C. Edward Cross, Division Manager City of Gastonia-Two Rivers Utilities P.O. Box 1748 Gastonia, North Carolina 28053 Subject: Compliance Evaluation Inspection Two Rivers Utilities Water Treatment Plant Alum Dewatering facility NPDES Permit NC0040070 Gaston County Dear Mr. Cross: Enclosed please find a copy of the Compliance Evaluation Inspection report for the inspection conducted at the subject facility on May 21, 2015, by Ms. Marcia Allocco of this office. I wish to thank you and your staff for your assistance regarding the inspection. The inspection report should be self-explanatory; however, should you have any questions concerning the report, please do not hesitate to contact me at (704) 235-2204 or marcia.allocco@ncdenr.gov. Sincerely, Marcia Allocco, MS Environmental Senior Specialist Water Quality Regional Operations Division of Water Resources Enclosure: Inspection Report cc: Wastewater Branch MSC 1617 — Central files basement Mooresville Regional Office Location:610 East Center Ave.,Suite 301 Mooresville,NC 28115 Phone:(704)663-16991 Fax:(704)663.60401 Customer Service:1-877-623-6748 Internet:http:!/portal.ncdenr.org/web/wq An Equal Opportunity 1 Affirmative Acton Employer-30%Recycledi10%Post Consumer paper United States Environmental Protection Agency Form Approved. EPA Washington,D.C.20460 OMB No.2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 • Section A:National Data System Coding(i.e.,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 Il 2 [] 3 I N00040070 111 12 1 15/05/21 117 18 u r 19 W 2011 21111111 1111II111111IIIIII I I IIIA IIIIIIIIIII Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved- 6711.0 1 701,LJ 1 71 Iry I 72 I rLI I 731 I 174 75J 11 1 1 1 1 180 Section B:FacilityiData J Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 08:46AM 15/05/21 15/04/01 Two Rivers Utilities WTP Exit Time/Date Permit Expiration Date 313 N Falls St Gastonia NC 28052 09:10AM 15/05/21 19/01/31 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Ed Cross,P0 Box 1748 Gastonia NC 2805317481/704-866-6827/ No Section C:Areas Evaluated During Inspection(Check only those areas evaluated) RI Permit • Operations&Maintenance Records/Reports • Self-Monitoring Program di Sludge Handling Disposal r Facility Site Review • Effluent/Receiving Waters Section D:Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Marcia Allocco MRO WQ//704-683-1699 Ext.2204/ rvl 1171 (- ^ 4 � r ) ne 52AP Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3(Rev 9-94)Previous editions are obsolete. Page# 1 Permit NC0040070 Owner-Facility: Two Rivera Utilities WTP Inspection Date: 05/21/2015 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 • 0 application? Is the facility as described in the permit? • 0 0 0 #Are there any special conditions for the permit? • 0 0 0 Is access to the plant site restricted to the general public? • 0 0 0 Is the inspector granted access to all areas for inspection? • 0 0 0 Comment: The current permit was issued on March 3.2015,with an effective date of April 1. 2015. The permit is set to expire on January 31,2019. The last compliance evaluation inspection was completed on December 2.2010. The Division granted a waiver of the monthly reporting requirement and operator visitations on May 26, 2009. Operations&Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • 0 0 0 Does the facility analyze process control parameters,for ex: MLSS, MCRT,Settleable 0 0 • 0 Solids,pH, DO, Sludge Judge, and other that are applicable? Comment: Since March of 2006 the permittee has pumped the effluent to the Long Creek VWVTP instead of directly discharging into the unnamed tributary to Lonq Creek. The WTP is a permitted industrial user(1064) under the City's pretreatment program and regularly samples the effluent under this program. Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? • 0 0 0 Are the receiving water free of foam other than trace amounts and other debris? 0 0 0 • If effluent (diffuser pipes are required) are they operating properly? 0 0 • 0 Comment: The effluent pipe/weir box was dry with no signs of recent discharge. Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 0 • 0 Is sample collected below all treatment units? 0 0 0 • Is proper volume collected? 0 0 0 • Is the tubing clean? 0 0 • 0 #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 0 • Celsius)? Is the facility sampling performed as required by the permit(frequency,sampling type 0 0 0 • representative)? Comment: The subiect permit would require grab samples for all monitored parameters. Page# 3