Loading...
HomeMy WebLinkAboutNC0038377_Special Order by Consent_20161027to � DUKE ENERGY, PROGRESS File: Mayo 12520 B-1 Mr. Danny Smith, Surface Water Supervisor North Carolina Division of Water Resources 1628 Mail Service Center Raleigh, NC 27699-1628 Subject: Duke Energy Progress, LLC. Mayo Electric Generating Plant Special Order by Consent EMC SOC WQ S 10-012 Construction Completion Notification Dear Mr. Smith: Date: 10/19/2016 Mayo Steam Plant Duke Energy Progress 10660 Boston Road Roxboro, NC 27574 Section In accordance with the NC Environmental Management Commission Special Order by Consent, EMC SOC WQ S 10-012, Duke Energy Progress, LLC. (Duke) is hereby submitting this notification that construction of the Dry fly ash reliability project was completed on October 12`h, 2016. This notice fulfills Duke's reporting obligation found in the subject Consent Order's Section 2.b.(3). If you have any questions, please contact Mr. Shannon Langley at (919) 546-2439. I certify, cinder- penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Sincerely, Tom Copolo — Plant Manager Mayo Electric Generating Plant TC/esl Cc: Point Source Branch NC Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617