Loading...
HomeMy WebLinkAbout20051729 Ver 1_More Info Received_20170206 (2)AFTON RIDGE II, BLDG.1 KANNAPOLIS, NORTH CAROLINA GEOSCIENCE PROJECT NO. CH16.0088.CV PROJECT CALCULATIONS Prepared By: GEOSCENCE GROUP 500 Clanton Road, Suite K Charlotte, North Carolina 28217 Phone (704) 525-2003 Facsimile (704) 525-2051 NC Firm License # F-0585 (Engr.) NC Firm License # C-279 (L.A.) AFTON RIDGE BUILDING 1 EROSION CONTROL Note: Use existing BMP for erosion control skimmer basin. Drainage Areas Initial area = 9.8 acres "Phase 2" area = 15.4 acres Note: The existing riser will be cored in the field to accept the skimmer. Compute 10 Year Discharge Qio = C(Iio)(A) Iio = 7.03 in/hr. C = 0.5 (graded condition) Qio = 0.5(7.03)(15.4) = 54.1 cfs Evaluate Existing Basin Basin Bottom = 612.5 Set bottom for erosion control at elevation = 611.00 Set skimmer invert at elevation = 612 Available Storage Volume at elevation 615 = 71,473 f13 (see attached spread sheet) Temporary Ditches Design ditch 1 and 2 for approximately %2 the drainage area each Qio =54.1 cfs Ditch 1 = Ditch 2 = 27.1 cfs Channel slope = t2% Note: See attached "North American Green" analysis Permanent Ditch 1 Drainage area = 4.9 acres C = 0.3 (grassed) Q10 = 0.3(7.03)(4.9) =10.3 cfs City of Charlotte, NC Disturbed Area (Acres) Peak Flow from 10 -year Storm (cfs) 27720 Required Volume ft3(1800 co 17583 Required Surface Area ft2 (325 srl 71473 Actual Volume ft3 Okay at elev. 615 - see stage storage ca/cs. 32530 Actual Surface Area ft2 Okay at elev. 615 - see stage storage ca/cs. ■Trial Length at Storage Heigth ft Trial Width at Storage Height ft Trial Weir Length ft Trial Depth of Flow ft 88.2 Spillway Capacity cfs Okay at elev. 596 -Skimmer Size (inches) Skimmer Size 0.417 Head on Skimmer (feet) (Inches -Orifice Size (1/4 inch increments) 1.5 5.32 Dewatering Time (days) estimated 2 about 5 days for actual storage 2.5 3 4 5 6 8 11/21/2016 www.wmcis.com/printlanalysis/106337/106338 NORTH AMERICAN GREEN Erosion Control Materials Design Software Version 5.0 Project Name: Afton Ridge II, Bldg.I Project Number: 106337 Channel Name: tsd 1-2 Discharge 27.1 Peak Flow Period 6 Channel Slope 0.02 Channel Bottom Width 0 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class C Vegtation Type Bunch Type Vegetation Density Good 75-95% Soil Type Sandy Loam S150 Tensar International Corporation 5401 St. Wendel-Cynthiana Road Poseyville, Indiana 47633 Tel. 800.772.2040 Fax 812.867.0247 www.nagreen.com Phase Reach Discharg Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern 5150 Straigh 27.1 cfs 5.14 I 1.33 ft 0.03 1.75 lbs/ft2 1.65 lbs/ft2 1.06 STABLE D Unve etated ft/s Unreinforced Vegetation - Class C - Bunch Type - Good 75-95% Phase Reach Discharge Velocity Normal Manning Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern Unreinforced Straight 27.1 cfs 5.14 1.33 ft 0.03 4.2 lbs/ft2 1.65 lbs/ft2 2.54 STABLE Vegetation ft/s Underlying Straight 27.1 cfs 5.14 1.33 ft -- 0.04 lbs/ft2 0.224 lbs/ft2 0.16 UNSTABLE -- Substrate ft/s http://www.ecmds.com/pri nVanalysis/106337/106338 1/1 11/16/2016 Discharge 10. Peak Flow Period 6 Channel Slope .02 Channel Bottom Width 2 Left Side Slope 3 Right Side Slope 3 Low Flow Liner Retardance Class Vegtation Type N Vegetation Density Stress Soil Type 5150 www. cmds.com/print/analysis/106337/106427 NORTH AMERICAN GREEN Erosion Control Materials Design Software Version 5.0 Project Name: Afton Ridge II, Bldg.1 Project Number: 106337 Channel Name: PD1 Tensar International Corporation 5401 St. Wendel-Cynthiana Road Poseyville, Indiana 47633 Tel. 800.772.2040 Fax 812.867.0247 www.nagreen.com Phase Reach ischarg Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern 5150 Straigh 10 cfs 2.78 I 0.81 ft 0.048 1.75 lbs/ft2 1.01 lbs/ft2 1.73 STABLE D Unve etated ft/s http://www.mmds.wm/printlarolysis/106337/106427 1/1 Figure 8.O6b: Design of outlet protection from a round pipe flowing full, maximum tailwater condition (Tw>=0.5 diameter) 3Do T Outlet W = De + 0.4La pipe �4tt::�] i diameter (Cb)g La ,aT.4iLa;ems. 5 D 120 r-- - II M, 50 1100 Discharge (O/sec) a, Ike el Curves may not be extrapolated. Figure 8.06b Design of outlet protectlon from 2 round pipe flowing full. maximum tailwater condition (T.>_ 0.5 diameter). / Ye s� II I . _ ------------------------- &- I 1111 ( r I Iiii I I / ;III I 1 it r \Bea\ ;ISI IlM P I M lli ii \? II IIII r/ II IIIIIII ? __ __ '.ice______ �_�:_______• � __ _ Illiii fl _ -�Q1g8 _ __ --$ _—__--_�� �,�,�•�,_ ter,—��_ ��)Jl \�'y — wK,—/ tee° INITIAL AREA SKIMA i= 9.8 \� SCALE: 1"=100' t / CONCRETE HEADWALL / INV. 645.44 a nv I.," 111 J w )j k d ;•Y�, _w Nfl i P Yw W Y11¢ I � YaeKaup I .IL. Y2Y+P1� I I °R w>Kp I 1111 ( r I Iiii I I / ;III I 1 it r \Bea\ ;ISI IlM P I M lli ii \? II IIII r/ II IIIIIII ? \ II III11\ II I � JillI Iltill Illiii Jill Ij1�l I;I 11 I�Jill 1 fIl \111 fl _ -�Q1g8 _ __ --$ _—__--_�� �,�,�•�,_ ter,—��_ ��)Jl \�'y — wK,—/ tee° INITIAL AREA SKIMA i= 9.8 \� SCALE: 1"=100' t / CONCRETE HEADWALL / INV. 645.44 a nv I.," 111 J w )j k d ;•Y�, _w Nfl i P Yw W Y11¢ I � YaeKaup I .IL. Y2Y+P1� I I °R w>Kp Permit No. (to be lowided by OWQ) I. PROJECT INFORMATION Project name AFTON RIDGE II, BLDG 1 Contact person Phone number Date Drainage area number II. DESIGN INFORMATION W ATF9OG T_ NCDENR q o Drainage area STORMWATER MANAGEMENT PERMIT APPLICATION FORM Impervious area, post -development 401 CERTIFICATION APPLICATION FORM %impervious WET DETENTION BASIN SUPPLEMENT Design rainfall depth This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required Information. I. PROJECT INFORMATION Project name AFTON RIDGE II, BLDG 1 Contact person Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 670,824 ft' Impervious area, post -development 483,516 fl' %impervious 72.08 % Design rainfall depth 1.0 in Storage Volume: Non-SAWaters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1 -yr, 24 -hr runoff Post -development 1 -yr, 24 -hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prepost control of the lyr 24hr storm peak flow required? 1 -yr, 24 -hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1 -yr, 24 -hr storm Pre -development 1 -yr, 24 -hr peak flow Post -development 1 -yr, 24 -hr peak flow Pre/Post 1 -yr, 24 -hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the pens. pool elevation) Top of 1011 vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 39,131 f? 39,131 ft OK, volume provided is equal to orin excess of volume required. it' ft' 11 to is Y (Y or N) 2.9 in NA (unitless) NA (unitless) 7.26 in/hr OK 7.85 fa/sec 3.97 lts/sec -3.88 ft /sec 618.62 fmsl 617.50 fmsl na fmsl 618.00 final 617.50 rmsl 613.00 final final 613.00 It N (Y or N) final Form SW401-Wet Detention Basin-Re,118112 Parts I. 811. Design Summary, Page 1 of 2 Permit No. (to be provided by DWty IIDESIGN.INFORMATION ." Surface AreasArea, Vegetated shelf slope temporary pool 37,294 ft Vegetated shelf width Area REQUIRED, permanent pool 16,838 it Insufficient shelf length. SAIDA ratio2.51 (unitless) 6 :1 Area PROVIDED, permanent pool, m, 24,101 ft, OK Area, bottom of 1Oft vegetated shelf, kr ,w 24,101 ft Trash rack for overflow & orifice? Area, sediment cleanout, top elevation (bottom of pond),.. 16,444 fe OK Volumes Y ft Volume, temporary pool 39,131 fts OK Volume, permanent pool, \(,asym 22,902 ft Recorded drainage easement provided? Volume, forebay (sum of forebays if more than one forehay) 16,030 its OK Forebay %of permanent pool volume 70.0% % Insufficient forebay volume. SAIDA Table Data Drain mechanism for maintenance or emergencies is: SLUICE GATE Design TSS removal 90 % Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SAIDA ratio 2.51 (unitless) Average depth (used in SAIDA table): Calculation opfion 1 used? (See Figure 10-2b) (Y or N) Volume, permanent pool, 4 --ow 22,902 fit? Area provided, permanent pool, 24,101 IF Average depth calculated 3.32 it OK Average depth used in SAIDA, 4„ (Round to nearest 0.5fl) 3.5 it OK Calculation option 2 used? (See Figure 10-2b) (Y or N) Area provided, permanent pool, 4.,. 24,101 if Area, bottom of 1Oft vegetated shelf, Aa, "r 24,101 if Area, sediment cleanout top elevation (bottom of pond), &,a 16,444 fe "Depth" (distance b/w bottom of 101t shelf and top of sediment) 4.50 ft Average depth calculated 3.32 ft OK Average depth used In SAIDA, 4„ (Round to down to nearest 0.511) 2.3 ft Insufficient Check calculation. Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice(if circular) 3.00 in Enter either diameter of orifice or area of non -circular office, Donotenter Area of orifice (if -non -circular) 0.04 in' both diameter and area fora circular orifice. Coefficient of discharge (Co) 0.65 (untless) Driving head (H,) 0.381t Drawdown through weir? N (Y or N) Weir type (uniffess) Coefficient of discharge (C�) (unNess) Length ofweir (L) it Driving head (H) ft Pre -development 1 -yr, 24 -hr peak flow 7.85 fts/sec Post -development 1 -yr, 24 -hr peak flow 397 Osec Storage volume discharge rate (through discharge orifice or weir) ft'/sec Storage volume drawdown time 2.87 days OK, draws down in 25 days. Additional Information Vegetated side slopes 3 :1 Insufficient side slopes. Vegetated shelf slope 6 :1 Insufficient shelf slope. Vegetated shelf width 6.0 ft Insufficient shelf length. Length of towpath to width ratio 6 :1 OK Length to width ratio 6.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided Y ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all mnoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: SLUICE GATE Fara SW401-Wet Detention Basin-Rev.94/1 a/12 Parts I. a II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 Page/ Plan Initials Sheet No, SG C2.2 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. SG C4.1 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, - Permanent pool dimensions, - Forebay and main pond with hardened emergency spillway, - Basin cross-section, - Vegetation specification for planting shelf, and - Filter strip. SG C4.1 3. Section view of the wet detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. SG C2.2 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. SG C2.2 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. SG C2.2 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. SG CALCS 7. The supporting calculations. SG COPY 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part III. Required Items Checklist, Page 1 of 1 POINT PRECIPITATION FREQUENCY ESTIMATES �d I FROM NOAA ATLAS 14 'k CONCORD NORTH CAROLINA (31-1975) 35.4167 N 80.6006 W 698 feet from PiecD t n- requency Atlas oiA-�e�iiiled States" NOAA Atlas 14, Volume 2, Version 3 G.M. nonnin, D. Martin, R Lin, T. Parzybok, M.Yekta, end D. Riley NOAA, National Weather Service, Silver Spring, Maryland, 2004 Extracted: Wed Jan 28 2009 Precipitation Frequency Estimates (inches) ARI 5 10 15 30 60 120 12 4 7 10 20 30 45 60 - 3 hr. 6 hr 24 hr 48 hr' �� - �I Ja (years) min'. min min min min min - - hr - - d� d� c7 da F1 Fo.40 0.64 0.80 1.09 F,.36 L58 1.69 2.05 2.4 .2.88 3.38 131.719 14.37 1.5.00 6.71 8.24 10.38 12.38 0.47 0.76 0:95 1.31. 1.65 1.91 2.04 2.4T, 2.94 .48 4.07 4.55.5.21 5.95 7.92 9.70 12.16' 14.46: �` I ' 0.55 0.88 1.11' 1.58 2.03 2.37 2.55 3.08 3.68 4.37 5.08 5.62 6.35 7.16 9.36 11.28 13.89 16.32 10 0.60 0.97 1.22F1 77 2.31-2.72 0.05' 2.93 3.56 4.27 5.07 5.87 6.46 7.25 8.11 10.48 12.51' 15.23 17.78 25 0.67 1.06 1.35 2.00 2.66' 3.17 3.45 4.201 5.086.01 6.94: 7.62 8.49 93-F12.01 14.12 16.96, 19.65 50 0.71 1.13 1.43 2.15 2.92 3.51 3.86.4.71 5.7316.77 7.79 8.54 ` 9.48 10.38, 13.19 15.36 18.27 21.06 100 0.75 1.19 1.50 2.30 3.17 3.84 4.26 5.23 6.40 .55 8.66 9.47.10.50 11.39 14.39 16.58 19.55' 22.41 200 0.78 1.24 1.56 2.43 3.41 4.17 4.68 5.76 7.10 8.35 9.56 10.44 11.54 12.42; 15.61 17.80 20.80 23.74 500 0.82 1.29 1.63 2.59 3.72 4.60 5.24 6.48 8.07 9.45 10.80 11.78 12.98 13.82 17.26 19.44 22.44 25.46 1000 0.84 1.33 1.67 2.70 3.94 4.92; 5.68 7.05 8.85 10.32 11.78 12.83 14.12 14.91 18.54 20.70 23.67 26.76 Precipitation Intensity Estimates (in/hr) ���� 60 120 3 hr 6 hr 12 24 48 4 7 10 20 30 45 60 (years min min min m n min mine hr hr hr � da lid 11� r 14.80 3.833.192.191.360.790.560.340.200.120.070.040.030.020.010.01'0.010.01 I� ` 5.66 4.54 3.80, 2.62 1.65 0.96 0.68 F -41 F -24 0.14 0.08 0.05 0.03; 0.02 0.02 0.01,[o-61755-1 -- I ' 6.60 5,29 4.46 3.17 10 7.26 58- 3.55 2.03 1.19 0.85 2.31 1.36 0.98 0.51 0.31 018 0.1110.06 0.04 0.03 0.02 0.02 0.01 0.01 0.59 0.35' 0.21 0.12' 0.07 0.04, 0.03 0.02 0.02 0.01 0.01 25 8.00 6.38 5.39 3.99 2.66 1.58' 1.15 0.70 0.42 0.25, 0.14 0.08 0.05' 0.04 0.03 0.02 6.62061 50 8.5 6.78' 5.72.4.31.2.92' 1.75 1.29 0.79 0.48' 0.28' 0.15 0.09 0.06 0.04 0.03 0.02 oo2F.ol 100 8.98 7.13 6.01 4.60 3.17 1.92 1.42 0.87 0.53 0.31 0.18 0.10 0.06. 0.05 Fo3' 0.02 0.02 0.02 200 9.37 7.43 6.25 4.86'3.41 2.08 1.55 0.96 0.59 0.35 0.20 0.11 0.07 005 0.03' 0.02 0.02 0.02 500 9.82 7.76 6.51 5.18 3.72 2.30 1,74 1.08 0.67 0.39 0.22 0.12 0.08 0.06 0.04 0.03 0.02 0.02 1000 10.12 7.97 6.67 5.40 3.94 2.46 1.89 1.18 0.73 0.43' 0.25 0.13 0.08' 0.06 0.04 0.03 0.02 0.02 MAV " in p2 GZ yN^ pN M M m M M.bCAV eW � � 3 m y m 'a T v 2 r'n y 'o 2N d � N y 'o y m a� 3 z o � Z Qc � a z Md[.Ib eW 4I. O� 13 z LU 0 W J CL Q 0 A C d Uq U m a a�y r m m v 0 3 c q q J alio a:o�`° m 'MN a E q m E ��� 3��;r c c w -0 m w O N m m d O Q m y Ma 0 0 'W c m m q q m m NmE V`Cmpap TMC nq J V E L) mU OLm-QL w ZVJ LLm Lrom•L.ELo mzv 3=W mot : c. moycm m °a c 03 m c �m L) �. o EDmy L a a m K_i'.° ami-iam °m 2Cc m,, m '^0 3 N0 oe ry° my am m m nat E m N J fn q °_ Cp C m q U> L q m C m 0 z7E m6a tJm C qy OYOm £ mm 3o2'ma and m W m E owTc oc may £;am° ya Q� .`�'_ T E �_ m m E m J c c 0 m y n m w N m O O C 0:.2 a� m N J T m m m L m J ami m Ramo n??:°maJ� '¢'> m2 �`m `mN m EmE aE m'3U �na<u rS wio w`o a- Fc�E`o N LL O t M m 6 $C J m 0 O p L a mry N N > i�v v 0 G yygg O 3 r m a m o � m o a a° j m Z m w n o ?� Q S Q n O m m y y >. m a n O 16 a � m m m •o m m U U O O '9 � � E E a � m m m m vi m A T 2 N Soil Map—Cabanus County, North Carolina Map Unit Legend afton 2016 USDAUSDA Natural Resources Web Soil Survey 11!9/2016 Conservation Service National Cooperative Soil Survey Page 3 of 3 Cabarrus County, North Carolina (NCO25) Map Unit Symbol Map Unit Name Acres In AOI Percent of AOI ChA Chewacla sandy loam, 0 to 2 7.01 12.5% percent lopes, frequently flooded CuB2 Cullen ay loam, 2 to 8 percent! G 8.9 16.0% slopes, moderately eroded CuD2 Cullen day loam, 8 to 15 29.61 53.4% percent slopes, moderately IF eroded MeB Mecklenburg loam, 2 to 8 —I 3.2 5.8% percent slopes PoF 1 Poindexter loam, 15 to 45 6.6 11.9% percent slopes W Water 0.21 0.4% Totals for Area of Interest— — �- —55.5 100.0% afton 2016 USDAUSDA Natural Resources Web Soil Survey 11!9/2016 Conservation Service National Cooperative Soil Survey Page 3 of 3 BMP 2 — "Re- Design" Note: BMP Design based on NCDENR BMP design manual prior to Revisions of 1.3.2017 Note: Design Storms 1 Year — 24 Hour — Rainfall = 2.88" 10 Year — 24 Hour — Rainfall = 5.07" 50 Year — 24 Hour — Rainfall = 6.77" Note: Pass 50 year storm with 12" of freeboard. Pre -Developed Condition Drainage area = 14.2 acres = 0.022 mit Tc = 30.4 min. (see attached spread sheet) Lag = 0.304 hrs. Curve Number Soil Type = Cullen (see attached report) Hydrologic Soil Group — C Land Use 50% Wood — CN = 70 50% Open Space — CN = 74 Composite CN = 72 Results of HEC -1 Analysis Qi = 7.851 cfs Qio = 27.409 cfs O� NL rn wN u W O DO J Q� oo- O O d II O W w J ~ zw O wo 0- z O LLJ �z x- 00 0 J C F C LL �I v; U ,s Ln o a i9 z G I O C n U L CO M � I +I = (n � O M G co W � Q O 0' O = Z J H O m cn N Q W ,,, W Q o m W W of 0 co x WU z Q Q o � 0- W z00 0 0 X N c _ N 9 0 u J C F C LL U a i9 G C L = � G o C W > Q O W :2 CJ W � Z n First 300' manning's n for sheet flow(table 3.1 TR -55) smooth surfaces(conc.,asphalt, gravel, or bare soil) 0.011 — Head= 11.00 � --id- — - Fallow(no- resue)T---- � I - I 0.05 mannings= 0.24 Cultivated Soils - - P2= 3.12 in Length= 300 ft +Residue c over <20% 'Residue Ccover>20% — ._. 0.06 0.17 So=H/L= 0.037 ft/ft --_ _.._ .. - _. Eqn 3.3 TR55 Grass Tt=0.o07(nL)^0.8/P^.5`So^.4 - Short grass praire 0.15 Tt= 0.46 hr Dense grass 0.24 Shallow Concentrated Flow Bermudagrass 0.41 Range. I 0.13 L= 600 ft _ - h= 47 ft Woods -- s-= 0.078 ft/ft Li ht underbrush j 9 o.4 - -- - V=16.1345 s^ 0.5 - -- -- �i Dense underbrush -- 0.8 V= 4.516 fps _ T=L/(3600V) (3.15)= 0.037 hr. L= 4_00 ft h= 14 ft -- V = [1.49(R)^2/3(S)1/2]/n (3.25) from analysis of channel r =a/p - 1.3f - -- - s= 0.03ft/ft -- - n_= 0.04' V [1 49(R)^2/3(S)1%2])n= 7.68 fps J T=L/(3600V) (3.15) 0 014 hr. Compute travel time `-- Tc=Tt1 + Tt2.... Tn _I' - - Tc= Compute travel time Tc=Tt1 + Tt2 ..Tn ----- -- Tc - -- Developed by: Scott Gregory 11/9/2016 NEC -1 INPUT LINE ID....... 1....... 2.......3.......4.......5.......6.......7.......8.......9......10 1 ID BMP 2 2 ID 1 YEAR. 24 ROM STORM PRE -DEVELOPMENT 3 ID GEOSCIENCE GROUP, INC. 4 IT 6 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 RR 8 PE 2.88 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 0.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0.0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 O.OD13 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 0.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PI 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 18 PI 0.0032 0.0032 0.0032 O.OD32 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 0.0051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 0.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 0.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 O.DO27 0.0026 0,0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 0.0021 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PI 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 0.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 KK PRE 35 KO 21 36 BA 0.0222 37 LS 0 72 38 UD 0.304 39 KO 21 40 EZ PAGE 1 * FLOOD HYDROGRAPH PACKAGE (HEC -1) SUN 1998 * VERSION 4.1 + RUN DATE 09NOV16 TIME 11:16:33 ++xx++xxxx+xxsxx+sxxxwwx+++ssxxxxxxwwxxxx EMP 2 1 YEAR 24 HOUR STORM PRE -DEVELOPMENT GEOSCIENCE GROUP. INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN T00 MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 6 IDATE 1 0 ITIME 0000 NQ 2000 NDDATE 9 0 NDTIME 0754 ICENT 19 MINUTES IN COMPUTATION INTERVAL STARTING DATE STARTING TIME NUMBER OF HYDROGRAPH ORDINATES ENDING DATE ENDING TIME CENTURY MARK COMPUTATION INTERVAL .10 HOURS TOTAL TIME BASE 199.90 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION FLOW STORAGE VOLUME SURFACE AREA TEMPERATURE SQUARE MILES INCHES FEET CUBIC FEET PER SECOND ACRE-FEET ACRES DEGREES FAHRENHEIT +xxrxxxrxxxxx++wxxxxxx+xx+++++++++wx+++ + U.S. ARMY CORPS OF ENGINEERS + HYDROLOGIC ENGINEERING CENTER 609 SECOND STREET DAVIS, CALIFORNIA 95616 + (916) 756-1104 + xxx xxx +xx xxx xxx xxx xxx xxx xxx +xr rxx sxx xx+ xrx xxx xxx w+x xxx xwx wxx +xx xxx xxx xxx +wx x++ xxx xxx xxx xxx xrx xxx +++ xxr+xrxxxxxxxx 34 KK PRE 39 KO OUTPUT CONTROL VARIABLES 35 KO OUTPUT CONTROL VARIABLES PRINT CONTROL IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS xxx +rx wxx xxx xxx xwx x++ +xx +++ x+x xx+ x+x rxx wxx xxx xxx xxx rrx xxx xxx xxx x++ +ww +xx +++ +++ xxr w++ +++ ++» +»+ +++ ++» +xxxxxxxx+xxxx 34 KK PRE 39 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS *** NORMAL END OF HEC -1 *** MAXIMUM TIME OF STAGE MAX STAGE RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASLN OPERATION STATION FLOW PEAK 6 -HOUR 24-HOUR 72 -HOUR AREA HYDROGRAPH AT 0. .00 0. 0. 0. .00 HYDROGRAPH AT PRE 8. 10.30 1. 0. 0. .02 *** NORMAL END OF HEC -1 *** MAXIMUM TIME OF STAGE MAX STAGE HydrographN... IPeak Flow Rate(... I Peak FlowDate/Time I Total Volumex... PRE 17.851 Dec 01, 1900 10:24 38.044 HEC -1 INPUT LINEID....... 1....... 2.......3.......4.......5.......6.......7.......8.......9......10 1 ID BMP 2 2 ID 10 YEAR 24 HOUR STORM PRE -DEVELOPMENT 3 ID GEOSCIENCE GROUP, INC. 4 IT 6 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 KK 8 PB 5.07 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 0.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0..0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 D.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PI 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 1B PI 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 0.0051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 D.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 0.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 0.0027 0.0026 0.0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 0.0021 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PI 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 0.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 KR PRE 35 KO 21 36 BA 0.0222 37 LS 0 72 38 UD 0.304 39 KO 21 40 ZE PAGE 1 +xxr,xxx++++xxxxxxxxxxxx+++,++x+,xxxxxxx, * FLOOD HYDROGRAPH PACKAGE (HEC -1) JUN 1995 * VERSION 4.1 x RUN DATE 09NOV16 TIME 11:17:42 EMP 2 10 YEAR 24 HOUR STORM PRE -DEVELOPMENT GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN TOO MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 6 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 2000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 9 0 ENDING DATE NDTIME 0754 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .10 HOURS TOTAL TIME BASE 199.90 HOURS ENGLISH UNITS 21 DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT ,xxxxxwxxxxxxw++++++x+++++x+x,x,x,x,x++ U.S. ARMY CORPS OF ENGINEERS HYDROLOGIC ENGINEERING CENTER 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 +++++xxx,x++xx+xxxxrzxxx«+xx+++w+w+x+x+ +++ +++ xxx +++ +++ xxx x++ xxx z*r xx+ ww+ +++ +++ +++ +wx +xr w++ wxx +++ xxx +++ +x+ +++ +++ +++ +x+ ++w xxx +++ +++ xxw ++x +++ xxxxxx+xx xxxxx 34 KK PRE 39 KO OUTPUT CONTROL VARIABLES 35 KO OUTPUT CONTROL VARIABLES PRINT CONTROL IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS ,xxxxxwxxxxxxw++++++x+++++x+x,x,x,x,x++ U.S. ARMY CORPS OF ENGINEERS HYDROLOGIC ENGINEERING CENTER 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 +++++xxx,x++xx+xxxxrzxxx«+xx+++w+w+x+x+ +++ +++ xxx +++ +++ xxx x++ xxx z*r xx+ ww+ +++ +++ +++ +wx +xr w++ wxx +++ xxx +++ +x+ +++ +++ +++ +x+ ++w xxx +++ +++ xxw ++x +++ xxxxxx+xx xxxxx 34 KK PRE 39 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS *** NORMAL END OF HEC -1 *** MAXIMUM TIME OF STAGE MAX STAGE RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN OPERATION STATION FLOW PEAK 6 -HOUR 24-HOUR 72 -HOUR AREA HYDROGRAPH AT 0. .00 0. 0. 0. .00 HYDROGRAPH AT PRE 27. 10.30 5. 1. 0. .02 *** NORMAL END OF HEC -1 *** MAXIMUM TIME OF STAGE MAX STAGE HVdrographN... I Peak Flow Rate(... I Peak FlowDate/Time I Total Volumex... PRE J27.409 Dec 01, 1900 10:24 116.143 z� z 77 � Z 2I1vM TO psi T Gt-�✓. �v17 z� /a Fi z d / lL r I I I li �rti�nE - �lO3a�! ``�©�X i y Ctt-Z46 C�17���� - �34 35 .5 Gini' WQ U/6.i 2 C�7 li 5V 1, ty - 7� I f� ! _ zp �' � ki�2'i 7 {�I�/ ✓ � n F -"-FI L'V � I i -Z. CD t_ * + W - N O R V 0(o 0 O 0 d 0 Ln O O Q (n IJ II Q to D) N ce) O O N N co IN - x CD O (D (D j w Wm r 0 Ll P r E wl" (o wl WI U (No Q xo o m 0 0 0 0 0 0 OD O O m L 0 0 0 0 0 V (A O O 00000 = d J J r N N0 C6 0 0 0 0 0 m M QW o _ 0 0 0 0 0 LD 0 1) (A O " 0 0 0 0 0 m LD I` r-: O I (~D O _ Oi C a� 5 m D N0000Oo^n(�oo. W _ of OCD �.�Oo0o0 0 0 0 0 0 0 o U OI 0�0 MI o L R NI (D0) STI r r r O I N CD t_ N O R V 0(o rr Q IJ II Q co O 00 ce) O O r M'te) co IN - x N N Co O d j w Wm r 0 Ll P r E wl" (o wl WI U (No d xo o m m O N O (�N "LD �.Q' OLL = d J J N U d C6 (o 0y C)d LL 0 7 c WQ (O O O W Lo r �00 060 C) i D Q U� r,: O co (~D O _ Oi C a� 5 m D W _ of OCD U o U OI MI o L R NI `m STI NI m 0 N rn c E 4z y Y = X -N X V r Ln L -Z. w t` 0 N CD t_ R 00 ce) O O r M'te) IN - x U0 m E C O OLL C6 LL N C (O U') Lo r Lo O U� r,: O co _ Oi C m D �W U `m A m OW ' LL O OT N M -q M OOOO I (6m OOOr pi n 000 I cn f: O O O O O O M O 0 0 000000�coo 0 U 00 0 0 0 0 0 0 0 00 Co o00 000'o 'a o 0 � O 0 0 0 0 0 0 0 0 0 I x 0 m CD O o o Cl 0 o Cl) o 0 0 �CD o 0 0 0 0 o r o 0 0 O O O O O O N O 0 0 �i O O O O O O 0 O 0� O 0 O 0 O 0 O <h O O O O O N N M O 0 0 Y L (0 Fn L Y c m a0 OO O O O O LO O O r O O 0 O 0 O 0 O 0 N 0 0 0 M N N O 0 0 U w oatv00 rl0)000 A O N O O C C O O O O O O C L ( ( I pl tnO O o N (o 0 Ovlo0000C 0 0 0 C H c6 a D r O 0 O ( r I N N N 0 0 0 'C O COOOO(D (o ( a 0 N rn c E 4z y Y = X -N X V r Ln L -Z. w t` 0 N WQ stage -storage .xls BMP2 2016 Bottom 613 Elevation Area (ft2) Delta Volume Percent - -- — _ Elevation Volume (ft3) (ft3) Volume 4.9657 - 27472 Volume (ft3j - - ------ 614 3991 - 29172 - Bottom Shelf 617 -- 30872 — — 613 16444 0 — 9760 - -- - -. -. — 616 5769 614 - — - - 9760 50.5% 17319 616 627.0 57216 617 6771 22902 16030 16.3% Bottom 613 Main Pond 0 19314.5 614 Elevation Area (ft2) Delta Volume 4.9657 - 27472 Volume (ft3j (ff3) 29172 - Bottom Shelf 617 -- 30872 — — 613 16444 0 - -- - -. -. — 614 - — - - 18194 - - 39897 17319 616 21703 57216 22902 617 24101 80118 Volume Combined Area Delta Elevation (ft2) Volume (ft3) (ft3) Bottom 613 16444 0 19314.5 614 _ 22185 19314.5 4.9657 - - 616 27472 — 68971.5 29172 - Bottom Shelf 617 -- 30872 - - - -' 98143.5 1/26/2017 R EV. SS-DETN.XLS PROJECT: Afton BMP#2 DESCRIPTION: DEVELOPMENT OF STAGE -STORAGE CURVE -PROP. DETN. BASIN OBJECTIVE: TO ILLUSTRATE THE DEVELOPMENT OF THE STAGE - STORAGE FUNCTION FOR THIS SITE. BACKGROUND: THE STAGE -STORAGE FUNCTION RELATES THE ELEVATION OF THE WATER SURFACE (STAGE) TO THE VOLUME OF THE WATER STORED (STORAGE). STAGE -STORAGE EQUATION: S = Ks*ZAb S = STORAGE (ft -3) Z = STAGE (ft) Ks & b = CONSTANTS FOR PARTICULAR SITE VOLUME COMPUTATIONS 1/2612017 COMPUTATION OF ACTUAL STORAGE VOLUME BASED ON CONTOURS USING AVERAGE END METHOD. CONTOUR CONTOUR INCREMENTAL ACC. STAGE ACC. ELEV.(ft) AREA(ftA2) STORAGE (ftA3) STORAGE(ftA3) (ft) STORAGE(ac.ft) 617.5 30053 0 15945 15945 0.37 618 33727 0.5 33196 49141 1.13 619 32664 1.5 37087 86227 1.98 620 41509 2.5 96833 183060 4.20 622 55324 4.5 1/2612017 REV.SS-DETN.XLS SOLVING FOR CONSTANTS Ks & b: SELECT EXISTING VALUES TO MODEL CONSTANTS BY. Z1 = 0.5 Z2 = 4.5 S1 = 15945 S2 = 183060 b = (In(S2/S1))/(In(Z2/Z1)) b = 1.11 Ks = S2/Z2Ab Ks = 34435.59 VALIDATION OF STAGE STORAGE FUNCTION: ACTUAL ACTUAL COMPUTED COMPUTED STORAGE STAGE STORAGE STAGE S(ftA3) Z(ft) S(ftA3) Z(ft) 15945.00 0.5 15945.00 0.50 49140.50 1.5 54026.77 1.38 86227.00 2.5 95287.90 2.28 183060.00 4.5 183060.00 4.50 ...THEREFORE THE STAGE STORAGE FUNCTION IS ADEQUATE 1/26/2017 HEC -1 INPUT LINEID....... 1....... 2 ....... 3 ....... 4 ....... 5 ....... 6 ....... '1 ....... 8 ....... 9 ...... 10 1 ID Post - HMPg2 2 ID 1 YEAR 24 HOUR STORM POST -DEVELOPMENT 3 ID GEOSCIENCE GROUP, INC. 4 IT 6 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 RK 8 PE 2.88 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 D.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0.0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 0.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PI 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 O.D022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 18 PI 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 O.D051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 0.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 D.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 0.0027 0.0026 0.0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 D.DD21 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PI 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 0.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 KK POST 35 KO 21 36 HA 0.0241 37 LS 0 91.3 38 UD 0.05 39 KO 21 4D KK ROUTE 41 KM ROUTE THROUGH CONTROL STRUCTURE 42 RE 1 ELEV 617.5 43 SV 0 0.37 1.13 1.98 4.2 44 SE 617.5 618 619 620 622 45 SQ 0 0.14 0.24 1.33 3.41 45.28 72.63 46 SE 617.5 618 618.62 619 619.4 621.5 622 47 KM TOP DAM = 622.5 48 ST 622.5 1 3 1.5 49 KO 21 50 ZZ PAGE 1 + FLOOD HYDROGRAPH PACKAGE (HEC -1) JUN 1998 * VERSION 4.1 + RUN DATE 29JM17 TIME 14:11:01 P09t - BMP#2 1 YEAR 24 HOUR STORM POST -DEVELOPMENT GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN T00 MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 6 IDATE 1 0 ITIME 0000 NQ 2000 NDDATE 9 0 NDTIME 0754 ICENT 19 MINUTES IN COMPUTATION INTERVAL STARTING DATE STARTING TIME NUMBER OF HYDROGRAPH ORDINATES ENDING DATE ENDING TIME CENTURY MARK COMPUTATION INTERVAL .10 HOURS TOTAL TIME BASE 199.90 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION FLOW STORAGE VOLUME SURFACE AREA TEMPERATURE SQUARE MILES INCHES FEET CUBIC FEET PER SECOND ACRE-FEET ACRES DEGREES FAHRENHEIT +++++xx+++x++x 34 KR * POST 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS 34 KK * POST + 39 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS ++++++++++++++ 40 KK ROUTE 49 KO OUTPUT CONTROL VARIABLES U.S. ARMY CORPS OF ENGINEERS ; HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET DAVIS, CALIFORNIA 95616 * (916) 756-1104 xx+xxxxx+xxx++x++xx++++xxx,x+xxxx,xx«xx IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS MAXIMUM TIME OF STAGE MAX STAGE 619.43 10.70 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA HYDROGRAPH AT 0. .00 0. 0. 0. .00 HYDROGRAPH AT POST 47. 10.00 4. 1. 0. .02 ROUTED TO ROUTE 4. 10.70 2. 1. 0. .02 MAXIMUM TIME OF STAGE MAX STAGE 619.43 10.70 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 ............... INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 617.50 622.50 622.50 STORAGE 0. 5. 5. OUTFLOW 0. 100. 100. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W. S. ELEV OVER DAM AC -FT CFS HOURS HOURS HOURS 1.00 619.43 .00 1. 4. .00 10.70 .00 •*^ NORMAL END OF HEC -1 ++* HydrographN... Peak Flow Rate(C... I Peak FlowDate/Time Total Volumex1... POST 46.94.9 Dec 01, 1900 10:06 111.183 ROUTE 3.97 Dec 01, 1900 10:48 112.42 HEC -1 INPUT LINE ID....... 1....... 2.......3.......4.......5.......6.......7.......8.......9......10 1 ID Post - BMP#2 2 ID 10 YEAR 24 HOUR STORM POST -DEVELOPMENT 3 ID GEOSCIENCE GROUP, INC. 4 IT 6 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 KK 8 PS 5.01 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 0.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0.0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 0.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PL 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 18 PI 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 0.0051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 0.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 0.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 0.0027 0.0026 0.0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 0.0021 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PI 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 0.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 KK POST 35 KO 21 36 BA 0.0241 37 LS 0 91.3 38 UD 0.05 39 KO 21 40 KK ROUTE 41 KM ROUTE THROUGH CONTROL STRUCTURE 42 RS 1 ELEV 617.5 43 SV 0 0.37 1.13 1.9B 4.2 44 SE 617.5 618 619 620 622 45 SQ 0 0.14 0.24 1.33 3.41 45.28 72.63 46 SE 617.5 618 618.62 619 619.4 621.5 622 47 KM TOP DAM = 622.5 48 ST 622.5 1 3 1.5 49 KO 21 50 22 PAGE 1 ++++++r+++++++++++++++++++++x**++++++++++ FLOOD HYDROGRAPH PACKAGE (HEC -1) JUN 1998 * VERSION 4.1 RUN DATE 26JAM17 TIME 14:12:50 +++++++*x++++*x+++++*x+++xx++xxxx+xxx+**+ Poet - BMP#2 10 YEAR 24 HOUR STORM POST -O GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND ENO DATES RESULT IN TOO MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 IPLOT 0 QSCAL 0. IT HYDROGRAPH TIME DATA NMIN 6 IDATE 1 0 ITIME 0000 NQ 2000 NDDATE 9 0 NDTIME 0754 ICENT 19 PRINT CONTROL PLOT CONTROL HYDROGRAPH PLOT SCALE MINUTES IN COMPUTATION INTERVAL STARTING DATE STARTING TIME NUMBER OF HYDROGRAPH ORDINATES ENDING DATE ENDING TIME CENTURY MARK COMPUTATION INTERVAL .10 HOURS TOTAL TIMH BASE 199.90 HOURS ENGLISH UNITS DRAINAGE AREA PRECIPITATION DEPTH LENGTH, ELEVATION FLOW STORAGE VOLUME SURFACE AREA TEMPERATURE SQUARE MILES INCHES FEET CUBIC FEET PER SECOND ACRE-FEET ACRES DEGREES FAHRENHEIT +++x*+*++++++++++*x+++r*+++++++++xx **x * * U.S. ARMY CORPS OF ENGINEERS HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 **x *** *++ *** *** *** +** **• *** *** x** *** *** *** *** *** *** *** +** *** *** *** *** *** +** +** *** *** *** *+* +*+ *** *wx xx+xx*x+++++++ +xxx+xxx++xx++ + 34 KK POST 34 KK * POST 35 KO OUTPUT CONTROL VARIABLES 39 KO IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS +xxx+xxx++xx++ + 34 KK * POST 39 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED +++ +++ *++ TIMINT x** +++ *++ **x x++ .100 +++ +++ +++ TIME INTERVAL IN HOURS x++ ++x x++ +r* +x+ xr+ +++ 40 KK ROUTE **+ ++x +** xxx +++ +*x xxx ++r ++w xxx x++ +++ ++x *r* xxx 49 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. NYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS MAXIMUM TIME OF STAGE MAX STAGE 620.59 10.20 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN OPERATION STATION FLOW PEAK 6 -HOUR 24-HOUR 72 -HOUR AREA HYDROGRAPH AT 0. .00 0. 0. 0. .00 HYDROGRAPH AT POST 94. 10.00 9. 3. 1. .02 ROUTED TO ROUTE 27. 10.20 7. 2. 1. .02 MAXIMUM TIME OF STAGE MAX STAGE 620.59 10.20 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 .1 ............. INITIALVALUE SPILLWAY CREST TOP OF DAM ELEVATION 617.50 622.50 622.50 STORAGE 0. 5. S. OUTFLOW 0. 100. 100. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC -FT CFS HOURS HOURS HOURS 1.00 620.59 .00 3. 27. .00 10.20 .00 •r• NORMAL END OF HEC -1 *-* POST j 94.23 Dec 01, 1900 10:06 228.56_ ROUTE 127.056 Dec 01, 1900 10:18 _ 230.59 HEC -1 INPUT LINE ID....... 1....... 2.......3.......4.......5.......6.......7.......8.......9......10 1 ID Post - HMP#2 2 ID 50 YEAR 24 HOUR STORM POST -DEVELOPMENT 3 ID GEOSCIENCE GROUP, INC. 4 IT 6 0 0 360D 5 IN 5 0 0 6 IO 5 0 0 7 KK 8 PB 6.77 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 0.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0.0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 0.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PI 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 18 PI 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 0.0051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 0.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 0.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 0.0027 0.0026 0.0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 0.0021 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PL 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 D.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 EK POST 335 KO 21 36 BA 0.0241 37 LS 0 91.3 38 UD 0.05 39 KO 21 40 KK ROUTE 41 KM ROUTE THROUGH CONTROL STRUCTURE 42 RS 1 ELEV 617.5 43 SV 0 0.37 1.13 1.98 4.2 44 SE 617.5 618 619 620 622 45 SQ 0 0.14 0.24 1.33 3.41 45.28 72.63 46 SE 617.5 618 618.62 619 619.4 621.5 622 47 KM TOP DAM = 622.5 48 ST 622.5 1 3 1.5 49 KO 21 50 EE PAGE 1 x+++x++rr+++x+xxxxx+ax+++xx+++xr+r++x+r++ xxxxx+rr+++++++++++++++++++xx++xxx++++x * FLOOD HYDROGRAPH PACKAGE (HEC -1) x + U.S. ARMY CORPS OF ENGINEERS * JUN 1998 HYDROLOGIC ENGINEERING CENTER VERSION 4.1 * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * RUN DATE 26JAN17 TIME 14:14:37 (916) 756-1104 Post - BMP#2 50 YEAR 24 HOUR STORM POST -DEVELOPMENT GEOSCIENCE GROUP, INC. *++ ERROR *** SPECIFIED START AND END DATES RESULT IN TOO MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 6 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 2000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 9 0 ENDING DATE NDTIME 0754 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .10 HOURS TOTAL TIME EASE 199.90 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT r+r +rw xrr x++ xxr wxr +rx ++* +++ ++x xx+ x+r wrx +++ +rx xxx xxx xxx xxx xxx xxx xrw rwx +«+ +++ +xx xxx x++ r+x rxx +*+ +++ xxx ++x+xxxrrrrwrr 34 EE POST 35 NO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS ++x +rx xxx xxw +rr x++ +++ +++ xx+ xxx xxx xxx +++ +++ xxx xxx xx+ +++ +++ +++ *xa x+x xxx xxx xxx xax +++ ++x xxa xxx rr* «++ xx+ xx+++rxx++++++ 34 KK POST 39 NO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS 40 KK * ROUTE 49 NO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON MIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .100 TIME INTERVAL IN HOURS MAXIMUM TIME OF STAGE MAX STAGE 621.38 10.20 RUNOFF SUMMARY FLOW IN CUBIC PEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA HYDROGHAPH AT 0. .00 0. 0. 0. .00 HYDROGRAPH AT POST 131. 10.00 12. 4. 1. .02 ROUTED TO ROUTE 43. 10.20 11. 3. 1. .02 MAXIMUM TIME OF STAGE MAX STAGE 621.38 10.20 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 ............... INITIALVALUE SPILLWAY CREST TOP OF DAM ELEVATION 617.50 622.50 622.50 STORAGE 0. S. S. OUTFLOW 0. 100. 100. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMP W. S. ELEV OVER DAM AC -FT CFS HOURS HOURS HOURS 1.00 621.35 .00 4. 43. .00 10.20 .00 ••• NORMAL END OF HEC -1 •-I I HvdrograghN... I Peak Flow Rate(C... I Peak FlowDate/Time I Total Volumex1... I POST 130.512 Dec 01, 190010:06 321.773 ROUTE 42.948 Dec 01, 1900 10:18 323.24 r R VE /1 1 I � 1 1 4: _--___-'-- / ;T / 9, 1 i iii .{r w ®r "r 2 WJ41 f AW, P# N E�bC� /PZZCB T AR/VA C c ee ORG.BMP 1 DRAINAGE AREA -112 Ac. , e a e e e 6 Projects\Afton Ridge bldg.1\AFTON1.12.17.dwg, 1/20/2017 1:30:43 PM, 1:100 ill uI 1 1 1 1 1 1 1 1 1 1 v m a W J m `a `r A r 0 N_ N 0 o J%f m O m o V r p x� (D tp (D (O (D N LL U O V N M r VC fm0 Y01 N r r N M O M o Ci N N C to m m M O N (R T l0 lD V N E p_ M V CD M N [p W O C W [p (p (O (p (D (D (D tD (p M t 6 0 r 6 N M C= V V V V O M M N 6 N N N h fO (O f0 (O l0 (O [D 1p M M y C N (rp N M m CMJ O (a0 MCV CV N C 'K M V r M CO O 0 d' pN � o'�i <o of m ui ni vi ni ai C W (O (p (O t0 tD l0 t0 (D M a t o 0 0 0 0 0 0 0 o E ca 2 J R N W (O (O fV 4 6 60 (9 (9 O J N O N N N O W M I Q J N � _ U p (A U) y N (0 co N N N N — ll '6 W C N M Q M (O r M A O J Z ? d O Z e t�0 m N N N t�D � ftp IBO00•£99'13'Au1 0 0 o 10 m TTTT 0£'L99.13 w18 6 :ul - 00'99+Z t BIS 0 0 ul OZ'ZS9'13'Aul Ino 00,Z99,13 'nul 46'999.13 w!a o ro 8 :ul - 00.86+4 BIS d c ul LO' 199 '13 'Aul N IBO LO' 199 '13 *Aul OL•999'13 w!a o L :ul - OOZ I+01 BIS o o e 0 r d o0 rn ul ZS•649 '13 'nul - InO ZS'649'13 'Aul M 69'4S9'13 w!a 9 :ul - 00.91.+9 BIS J o o � oo r Ul L61"IB 'Aul WO L6'L49'13 •Aul m 9£'459'13 Will [r 9 :ul - 00.96+9 BIS o 0 ul 19'949.13 'Aul IBO 19'969.13 'nut 00,999,1a w!a o 4 :ul - 00.OL+E BIS ul L9'E49 '13 'Aul IBO L9•£49'13 •Aul 0 oz•959.13 w!a E :ul - 00'44+1 BIS ul 00.149 '13 'nul o ISO 00.1.49 '13 'nul 06'£99.13 w!a Z :ul - 00'9£+0 BIS I $ w c i u108'9£9.13'Aul N IBO 41'919.13 'nut - 00.649'13 w!a e 1. :u-1 - 0011+0 BIS � 0 o x 0 0 u100'919'13'Aul 00.919.13 TWO IIBAnO - 00.00+0 BIS 0 O V ( cG m cs N W Worksheet for (SUMP)SO Project Description Solve For Spread Input Data Discharge 3.26 ft -/s Gutter Width 2.00 It Gutter Cross Slope 0.13 ft/ft Road Cross Slope 0.02 fUft Local Depression 2.00 in Local Depression Width 3.00 It Grate Width 2.00 It Grate Length 3.00 It Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Grate Inlet Only Results Spread 2.72 ft Depth 0.33 ft Gutter Depression 0.21 It Total Depression 0.38 ft Open Grate Area 5.40 ft' Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods Soh6EorflEjefitewMaster V8i (SELECTseries 1) 108.11.01.03) 1/23/2017 2:38:37 PM 27 Siemens Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Options Calculation Option Use Grate Inlet Only Results Spread 30.65 It Depth 0.82 ftUVJ e� Gutter Depression 0.21 ft Total Depression 0.38 ft Open Grate Area 5.40 ft' Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods SoIB®rtlgeFtewMaster VIN (SELECTseries 1) [08.11.01.03) 1/2312017 3:00:24 PM 27 samons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 1 Worksheet for (SUMP)S3 Project Description Solve For Spread Input Data Discharge 14.56 ft /s Gutter Width 2.00 ft Gutter Cross Slope 0.13 ft/ft Road Cross Slope 0.02 ft/ft Local Depression 2.00 in Local Depression Width 3.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 It Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Grate Inlet Only Results Spread 30.65 It Depth 0.82 ftUVJ e� Gutter Depression 0.21 ft Total Depression 0.38 ft Open Grate Area 5.40 ft' Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods SoIB®rtlgeFtewMaster VIN (SELECTseries 1) [08.11.01.03) 1/2312017 3:00:24 PM 27 samons Company Drive Suite 200 W Watertown, CT 06796 USA +1-203-755-1666 Page 1 of 1 Worksheet for (SUMP)S4 Project Description Solve For Spread Input Data Discharge 15.63 ft -/s Gutter Width 2.00 ft Gutter Cross Slope 0.13 ft/ft Road Cross Slope 0.02 ft/ft Local Depression 2.00 in Local Depression Width 3.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Grate Inlet Only Results Spread 32.56 it Depth 0.86 ft -,-- Vr110. DRi+ -C 60K Gutter Depression 0.21 ft Total Depression 0.38 ft Open Grate Area 5.40 ft - Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods Sol@Es OpfitewMaster V61(SELECTserles 1) [08.11.01.03] 1/23/2017 3:01:37 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 m a i i I i I I r i i o N N N _ r p O m r U O m M CP O N IL U Q (O (V V I G N N M M Q M C Y � c `m z n p > � of vi ri f) N E oo I � O a — •i'. 1A N � cw co w co p 0 0 0 J W O O S N Q O O YJ O i N m Q m r c0 N N t0 ON ❑ I � CW L+ O O 6 N N O N M d a c ^ 0 0 0 o J N to O r d m a O O O Ol O J d V N OJ O U J E N E O O O O O C N p W C J N N p U v p N N N N C LL N C N M U d O O _Z J O a` � z N O N !A v 04 CP N O IL LH {- O L. CL 3 4) N E O N fD inn 06'649 '13 'nul WO O (D 1p � fD M C fND (p O O 11J OE'E99'13 WN E :ul - 00'Z4+i BIS - v n 0 N O O O O O T J O O O O L U (0 N 0 G_ ------------- 0 <o 0 0 u1 ZZ'949 '13 'nul o Ino 00'L49 '13 'nul OL'699 '13 WIN Z :ul - 0031£+0 eiS O J of (� ul 09'949 '13 'nul t W inn 00' 6Z9 '13 'nut 00't99 '13 will L :ul - 00'OZ+O eiS 5N of ul 00'OZ9 '13 'nul 00'OZ9 '13 'Puj9 IIeAnO - 00'00+0 eiS 0 0 (6 0 0 0 0 O l0 (V 41 O O W Options Calculation Option Use Grate Inlet Only Results Spread Worksheet for (SUMP)S21 Project Description 0.35 ft Gutter Depression Solve For Spread 0.34 ft Input Data 5.40 ft' Active Grate Weir Length Discharge 3.48 ft -/s Gutter Width 2.00 ft Gutter Cross Slope 0.13 fUft Road Cross Slope 0.04 ft/ft Loral Depression 2.00 in Local Depression Width 3.00 It Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Grate Inlet Only Results Spread 2.85 it Depth 0.35 ft Gutter Depression 0.17 ft Total Depression 0.34 ft Open Grate Area 5.40 ft' Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods SolBindlOpriteooMaster Vel (SELECTSeries 1) [08.11.01.03] 1123/201711:41:52 AM 27 Slemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for S20 Project Description Solve For Efficiency Input Data Discharge 0.84 ft /s Slope 0.03000 fUft Gutter Width 2.00 ft Gutter Cross Slope 0.13 ft/ft Road Cross Slope 0.03 ft(ft Roughness Coefficient 0.016 Local Depression 2.00 in Local Depression Width 2.00 It Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 It Options Calculation Option Use Grate Inlet Only Grate Flow Option Exclude None Results Efficiency 100.00 % Intercepted Flow 0.84 ft'/s Bypass Flow 0.00 ft -/S Spread 1.71 ft Depth 0.22 ft Flow Area 0.19 ft Gutter Depression 0.20 ft Total Depression 0.37 ft Velocity 4.43 ft/s Splash Over Velocity 9.97 ft/s Frontal Flow Factor 1.00 Side Flow Factor 0.15 Grate Flow Ratio 1.00 Equivalent Cross Slope 0.21333 fVft Active Grate Length 3.00 It Length Factor 0.00 Total Interception Length 5.86 ft Bentley Systems, Inc. Haestad Methods SoIH®tllOpfftewMaster V8)(SELECTseras 1) 108.11.01.03) 1/23/201711:43:39 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for (SUMP)S11 Project Description Solve For Spread Input Data Discharge 1.29 Wis Gutter Width 2.00 ft Gutter Cross Slope 0.13 ft/ft Road Cross Slope 0.13 ft/ft Local Depression 2.00 in Local Depression Width 3.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Grate Inlet Only Results Spread 2.01 ft Depth 0.23 ft Gutter Depression -0.01 ft Total Depression 0.34 ft Open Grate Area 5.40 ft' Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods SolitbAl0,erdewMaster V81(SELECTserles 1) (08.11.01.031 1/23/201712:19:21 PM 27 Simons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for Curb Inlet On Grade - S10 Project Description 59.54 % Solve For Efficiency 0.23 ft -/s Input Data 0.16 Me Discharge 0.39 ft -/s Slope 0.03000 ft/ft Gutter Width 2.00 ft Gutter Cross Slope 0.03 ft/ft Road Cross Slope 0.03 ftlft Roughness Coefficient 0.016 fills Curb Opening Length 3.00 ft Local Depression 2.00 in Local Depression Width 3.00 ft Results Efficiency 59.54 % Intercepted Flow 0.23 ft -/s Bypass Flow 0.16 Me Spread 3.20 ft Depth 0.10 ft Flow Area 0.15 ft' Gutter Depression 0.00 ft Total Depression 0.17 ft Velocity 2.54 fills Equivalent Cross Slope 0.08150 ft/ft Length Factor 0.40 Total Interception Length 7.59 ft Bentley Systems, Inc. Haestad Methods SohB®tllOAfitewMaster VBi (SELECTseries 1) [08.11.01.03] 1/23/201712:39:01 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 Worksheet for (SUMP)S70A Project Description Solve For Spread Input Data Discharge 1.07 ft/s Gutter Width 2.00 ft Gutter Cross Slope 0.13 ft/ft Road Cross Slope 0.04 ft/ft Local Depression 2.00 in Local Depression Width 3.00 ft Grate Width 2.00 ft Grate Length 3.00 ft Grate Type P-50 mm (P-1-7/8") Clogging 0.00 % Curb Opening Length 3.00 ft Opening Height 0.50 ft Curb Throat Type Horizontal Throat Incline Angle 90.00 degrees Options Calculation Option Use Grate Inlet Only Results Spread 1.90 ft Depth 0.18 ft Gutter Depression 0.17 ft Total Depression 0.34 ft Open Grate Area 5.40 ft - Active Grate Weir Length 7.00 ft Bentley Systems, Inc. Haestad Methods Soldhan IdieRtewMaster V81 (SELECTserles 1) [08.11.01.03] 1/23/201712:39:49 PM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 OSA +1-203-755-1666 Page 1 of 1 dk ® \ \ !! / § § 093 (§ « \ \ )� ® } ) zi !- § § ed so Ie0 00'9S9'13'nul 00'099'13 w21 to o c so o d cQ fri �n v� o ai co 0 0 Z :ul - 00'92+� el5 0 N O O O ul 981499'13 'nul ln0 S9'b59'13'nul o 59'859'13 WN m 6 :ul - 00'88+0 BIS 0 m o � r L U ca N 0 co O n 0 d 0 m J W N o x u1 00' M '13 'nul 00'L59 '13 PuJO IIBAnO - 00'00+0 91S 0 oD < O N N W � tOD t0 tp ID t0 tip W Worksheet for TWide Rectangular Channel - 1 Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.015 Channel Slope 0.01500 Rift Bottom Width 3.00 ft Discharge 7.70 ft -/s Results Normal Depth 0.44 ft Flow Area 1.31 ft' Wetted Perimeter 3.87 ft Hydraulic Radius 0.34 ft Top Width 3.00 ft Critical Depth 0.59 ft Critical Slope 0.00608 ft/ft Velocity 5.88 ft/s Velocity Head 0.54 ft Specific Energy 0.97 ft Froude Number 1.57 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity fUs Upstream Velocity Infinity ft/s Normal Depth 0.44 ft Critical Depth 0.59 ft Channel Slope 0.01500 ft/ft Critical Slope 0.00608 ft/ft Bentley Systems, Inc. Haestad Methods Sol@eudl6 fitawMaster Vet (SELECTseries 1) [08.11.01.03] 11/712016 1:52:05 PM 27 Samons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 1/23/2017 Discharge 3.5 Peak Flow Period 6 Channel Slope 0.01 Channel Bottom Width 2 Left Side Slope 2 Right Side Slope 2 Low Flow Liner Retardance Class Vegtation Type N Vegetation Density Stress Soil Type 5150 www.ecmds.com/printlanalysis/106337/110259 NORTH AMERICAN GREEN Erosion Control Materials Design Software Version 5.0 Project Name: Afton Ridge II, Bldg.1 Project Number: 106337 Channel Name: PD 2 Tensar International Corporation 5401 St. Wendel-Cynthiana Road Poseyville, Indiana 47633 Tel. 800.772.2040 Fax 812.867.0247 www.nagreen.com Phase Reachischarg Velocity Normal Mannings Permissible Shear Calculated Shear Safety Remarks Staple Depth N Stress Stress Factor Pattern 5150 Straighl 3.5 cfs I 1.65 0.65 ft 0.052 1.75 lbs/ft2 0.4 Ibs/ft2 4.35 STABLE D Unve etated ftIs httpJ/www.ecmds.com/printianalysis/106337/110259 1/1