Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NC0033111_Owner Name Change_20160205
AWS Systems, Inc. 'r Fairfield Harbour Subdivision WWTP RECEIVED/NCDEQIDWR Authorization to Construct No. 033111A04 Issued July 2, 2015 FEB 0 5 2016 Water Quality Engineer's Certification Permitting Section I, Lilt(pDo d C s Vd N d, as a duly re . _ -. ' : essional Engineer in the State of North Carolina, having been authorized to observ: (periodically eekly/full time) the construction of the modifications and improvements to the Fair ie 4 -ar.our Subdivision Wastewater Treatment Plant, located in Craven County,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of a new tertiary filtration system consisting of two (2) multiple element 144 ft2 cloth filters to remove TSS to a minimum of 5 mg/L with covered stainless filter tanks, with a 1,700 gallon mud well/backwash pump station basin, two (2) 62 GPM @ 40 ft TDH backwash transfer pumps, piping, and controls; relocation of existing UV system, piping, and controls: in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. � &__Signature12 �� / Registration No. c7 1 ' , . !ui ,Date 0 Z -© 1- IG . \ ,.,AQ1„/ / �\ � ESSIpFti9y� Mail this Certification to: Attn: Ron Berry =E. :. 4Faessi79 Complex Permitting Unit DENR/DWR/Water Quality Programs ' '�,�,FtiGINE`,�ip''y 1617 Mail Service Center14,9615. •9 Ew\/ Raleigh, NC 27699-1617 �_7!�'!"""