Loading...
HomeMy WebLinkAbout20160196 Ver 1_Compliance Evaluation Inspection_20170202Wetland Inspection Report Project Num: 20160196 Version: 1 Status: Issued Project Name: Qorvo Project Type: Industrial / CommercialBusines / County: Guilford Region: Winston-Salem Location: Qorvo Latitude: +36° 04' Longitude: -79° 57'52" SW Plan Location Site Owner Name Carolina Investment Properties Inc of Lexington Inspection Date: 2/2/2017 Reason for Inspection Routine Inspection Type: Site Inspection (non -DOT) Inspection Contact Person: Title: Phone: On -Site Representative(s): Primary Inspector: Sue L Homewood Phone: 336-776-9694 Secondary Inspector(s): Facility Compliance Status: ❑ Compliant 0 Not Compliant Program Areas: 401 (includes isolated/non-404) Question Areas: 0 Permit (401 WQC) Inspection Summary: page: 1 Site Number: 20160196 Owner: Team, Robert A Inspection Date: 2/2/2017 Inspection Type: Site Inspection (non -DOT) Reason for Visit: Routine Permit (401 WQC) Does the impact(s) match what was approved in the 401 WQC or non 404 permit? Are the culverts and/or filled areas installed properly? Is the site compliant with additional conditions of the 401 WQC or non 404 permit? Comment: Culvert was not buried as required. Riprap apron was 3 feet above stream bed. Yes No NA NE ■ ❑ ❑ ❑ ❑ ■ ❑ ❑ ■ ❑ ❑ ❑ page: 2 002,02-20 M1 * II y 002,02-20 M1 P 1` dx! 14 1 t+ y f A g 7 J Jy �Pa ��i IF�V Homewood, Sue From:Bailey, David E CIV USARMY CESAW (US) <David.E.Bailey2@usace.army.mil> Sent:Friday, February 03, 2017 9:16 AM To:Robin Team; Brad Luckey Cc:Homewood, Sue Subject:Compliance visit: Qorvo site, Thorndike Rd, Greensboro, Guilford Co.; SAW-2016-00439 Attachments:20170202_143920_1486130826937_resized.jpg Robin and Brad, Hello all. Sue Homewood (NCDWR) and I visited the above referenced site yesterday to determine compliance with the Nationwide Permit 39 verified for use on 4/8/2016. Fill for the sidewalk above the pond (wetland impacts) and the road crossing (stream impacts) have been installed. Two items were noted during the compliance inspection: 1) The 48" culvert shown on the permitted plans under the road crossing does not appear to be buried 1' below the bed of the stream as shown on the permitted plans (Plan Sheet C2.2). Please explain this discrepancy; 2) The rip rap dissipater pad at the downstream end of the 48" culvert was not keyed into the stream bank, and is not placed such that it is no higher than the previously existing stream bed elevation as shown on the permitted plans (Plan Sheet C2.2). Specifically, the downstream ~13 l.f. of the rip rap pad includes rip rap piled between 1 and 2' higher than the stream bed elevation (see attached picture). Please reset the rip rap pad such that it is placed no higher than the previously existing stream bed elevation as shown on the permitted plans (Plan Sheet C2.2). Please address the above items within 14 days of the date of this email, and let me know if you have any questions; response via email is fine. Sincerely, Dave Bailey --- David E. Bailey, PWS Regulatory Project Manager US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 30. Fax: (919) 562-0421 Email: David.E.Bailey2@usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0. 1