Loading...
HomeMy WebLinkAbout20170127 Ver 1_Horsepen_Creek_PCN page 5_201702064. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individuall list all o en water im acts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number (if applicable) Type of impact Waterbody Area of impact (acres) Permanent (P) or type Tempora T 01 Choose one Choose 02 03 04 4f. Total open water impacts 4g. Comments: none 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID number Proposed use or Wetland Impacts (acres) Stream Impacts (feet) Upland purpose of pond (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surFace area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse � Tar-Pamlico � Catawba � Randleman ❑X Other: Jordan 6b. 6c. 6d. 6e. 6f. 6g. Buffer Impact Reason for impact Stream name Buffer Zone 1 Zone 2 number — mitigation impact impact Permanent (P) or required? (square (square Tem ora T feet feet B1 P Road widening, bridge Horse Pen Creek No 5529 3958 B2 T Bridge, culvert removal Horse Pen Creek No 1702 789 B3 P Stormwater pipe outlet Stream 5 No 745 409 B4 P Fill, pipe outlet Stream 6 No 4203 3209 B5 - No B6 - No 6h. Total Buffer Impacts: 1217s 8365 6i. COmments: g1 and B2 impacts are on either side of the existing culvert / proposed bridge location; B5 and B6 are at other locations along the project Page 5 of 10