Loading...
HomeMy WebLinkAboutNC0001422_Table 6-5 GW Remedial Alternative Estimate Cost_20160201TABLE 6-5 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING — ESTIMATED COST L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, LLC, WILMINGTON, NC Alternative 1 Alternative 2 Alternative 3 Estimated Groundwater Monitored Natural Hydraulic Containment Hydraulic Containment & Remediation Cost Attenuation (MNA) Wells/MNA Source Extraction Wells/MNA Capital Cost 200,000 2.3M 3.3M 30 year Operation and 2.1M 4.3M 5.3M Maintenance Cost Total Cost 2.3M 6.6M (+MNA Costs) 8.3M (+MNA Costs) Prepared By: PBW Checked By: KW P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Tables 6-2 to 6-6 Sutton rev3.docx Page 1 of 1