Loading...
HomeMy WebLinkAboutNC0001422_Table 6-3 GW Remedial Alternative Implementability_20160201TABLE 6-3 GROUNDWATER REMEDIATION ALTERNATIVE SCREENING - IMPLEMENTABILITY L.V. SUTTON ENERGY COMPLEX DUKE ENERGY PROGRESS, LLC, WILMINGTON, NC Alternative 1 Alternative 2 Alternative 3 Feasibility Monitored Natural Hydraulic Hydraulic Attenuation (MNA) Containment Containment & Source Wells/MNA Extraction Wells/MNA Eastern North/ Eastern North/ Eastern North/ Site Area FADA Down- West FADA Down- West FADA Down- West gradient gradient gradient Are the material resources and manpower readily available to fully implement the remedial Yes Yes Yes Yes Yes Yes Yes Yes Yes alternative in a timely manner? Does the remedial alternative require highly specialized resources and/or equipment? No Yes No No No No No No No Is there sufficient onsite and offsite area to fully implement the remedy? Yes Yes Yes Yes Yes Yes Yes Yes Yes Will waste materials be managed efficiently? Yes Yes Yes Yes Yes Yes Yes Yes Yes Does the remedial alternative require any permits and can the permits be acquired in a Yes Yes Yes Yes Yes Yes Yes Yes Yes timely manner? Can the remedial alternative be implemented safely? Yes Yes Yes Yes Yes Yes Yes Yes Yes Can existing infrastructure support remedial alternative? Yes RA Yes Yes No Yes Yes No Yes Can the remedial alternative achieve all applicable or reasonable and appropriate Yes No Yes Yes Yes Yes Yes Yes Yes requirements ARARs ? Prepared By: PBW Checked By: KW All options assume source removal and onsite landfill P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Tables\Tables 6-2 to 6-6 Sutton rev3.docx Page 1 of 1