Loading...
HomeMy WebLinkAboutNC0001422_Fig 7-1 GW Recovery Treatment_201602011/ 1 6 / 2 0 1 6 2 : 5 4 P M P: \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 2 0 8 . S u t t o n C C P C C R G W A s s e s s , W e l l I n s t a l l & M o n i t o r i n g \ 0 4 . I n s t a l l a t i o n S u p p o r t F o r G W M o n i t o r i n g S y s t e m \ E r o s i o n A n d S e d i m e n t C o n t r o l \ D E S U T T O N - G W T R E A T M E N T P L A N . d w g 800 GRAPHIC SCALE (IN FEET) 0 400200400 NC WILDLIFE LAKE ACCESS SUT T O N L A K E R D CAPE FEAR RIVER SUTTON LAK E R D COOLING POND WATER LEVEL = 9.60 ft PROVIDED BY DUKE ENERGY 06-02-2014 MET R O C I R C L E EZZELL TRUCKING LCH HOLD I N G S S. T. WOOTEN CORPORATION N C H I G H W A Y 4 2 1 TRAN S C O M C T BEVE L R D ROYMAC DR NEW HANOVER COUNTY SAUNDERS & SAUNDERS, LLC ROYMAC BUSINESS PARK R O Y M A C P A R T N E R S H I P ABSOLUTE PROPERTIES HURR I C A N E PROPE R T I E S MAOLA MILK & ICE CREAM CO. SOURCES: 1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2.2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83). 4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 5.2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx 6.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 7.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". 8.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AS PART OF PREVIOUS ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE. OLD ASH BASIN AREA NEW ASH BASIN AREA FORMER ASH DISPOSAL AREA CA N A L C A N A L AST CONCRETE PAD SOLAR FARM COOLING POND TRA N S C O M C T ROYMA C D R F R E D R I C K S O N R D C A N A L ACCESS ROA D F R E D R I C K S O N R D APPROXIMATE ROUTE OF THE NEW WILMINGTON BYPASS (I-140) N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D CFPUA FIGURE 7-1 GW TREATMENT PLAN 2016-01-15 2016-01-15M. HUTCHINSON J. COLEMAN PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: P. WALDREP DATE: DATE: www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 REVISIONSHEET1026.208.04 FIGURE 7-1 1 OF 1 A PROPOSED GROUNDWATER TREATMENT PLAN GROUNDWATER RECOVERY AND TREATMENT PLAN L.V. SUTTON ENERGY COMPLEX 801 SUTTON POWER PLANT RD WILMINGTON, NORTH CAROLINA LE G E N D AP P R O X I M A T E D U K E E N E R G Y P R O G R E S S P R O P E R T Y L I N E 8" HDPE PIPE (TYPICAL UNLESS NOTED OTHERWISE) AP P R O X I M A T E L O C A T I O N N E W O N - S I T E L A N D F I L L AP P R O X I M A T E L O C A T I O N P R O P O S E D R E C O V E R Y W E L L RW-01 RW-02 RW-03 RW-04 RW-05 RW-06 RW-07 RW-08 RW-09 RW-10 RW-11 RW-12 RW-18 RW-17 RW-16 RW-15 RW-14 RW-13 10" HDPE PIPE TREATMENT FACILITY 8" HDPE PIPE (TYPICAL UNLESS NOTED OTHERWISE) DISCHARGE TO CANAL 10" HDPE PIPE N E W O N - S I T E L A N D F I L L N E W O N - S I T E L A N D F I L L RW - 0 4 SEE FIGURE 7-2 FOR TYPICAL EXTRACTION WELL AND VAULT CONSTRUCTION DETAILS