Loading...
HomeMy WebLinkAboutNC0001422_Fig 6-21 Predicted Location Boron_20160201FIGURE 6-21 PREDICTED LOCATION OF BORON PLUME FOR EACH MODELLED CORRECTIVE ACTION SURFICIAL AQUIFER L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT ROAD WILMINGTON, NORTH CAROLINA 28401 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com FILEPATH: P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Figures\Final DRAWN BY: E BENNETT PROJECT MANAGER: P. WALDREP LAYOUT: DATE: JAN 2016 Boron - No Source Control - 2020 Boron - No Source Control - 2045 Boron - Cap in Place - 2020 Boron - Cap in Place - 2045 Boron - Ash Removal - 2020 Boron - Ash Removal - 2045