HomeMy WebLinkAboutNC0001422_Fig 6-19 Concentration Arsenic 50 200 400_20160201148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
DRAWN BY: K BERNIER
PROJECT MANAGER: P WALDREP
LAYOUT:
DATE: JANUARY 2016
FIGURE 6-19
CONCENTRATION OF ARSENIC
FROM ASH BASIN TO COOLING
POND AT 50, 200, AND 400 YEARS
L.V. SUTTON ENERGY COMPLEX
WILMINGTON, NORTH CAROLINA FILE PATH: P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW
Assessment Plan\20.EG_CAP\CAP Part 2\Figures\Final
0
50
100
150
200
250
0 50 100 150 200 250 300
Ar
s
e
n
i
c
C
o
n
c
e
n
t
r
a
t
i
o
n
(
µ
g
/
L
)
Distance from Ash Basin to Cooling Pond (ft)
Comparative Value 10 ug/L Edge of Cooling Pond 50 years 200 years 400 years