Loading...
HomeMy WebLinkAboutNC0001422_Fig 6-19 Concentration Arsenic 50 200 400_20160201148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA 29601 PHONE 864-421-9999 www.synterracorp.com DRAWN BY: K BERNIER PROJECT MANAGER: P WALDREP LAYOUT: DATE: JANUARY 2016 FIGURE 6-19 CONCENTRATION OF ARSENIC FROM ASH BASIN TO COOLING POND AT 50, 200, AND 400 YEARS L.V. SUTTON ENERGY COMPLEX WILMINGTON, NORTH CAROLINA FILE PATH: P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Figures\Final 0 50 100 150 200 250 0 50 100 150 200 250 300 Ar s e n i c C o n c e n t r a t i o n ( µ g / L ) Distance from Ash Basin to Cooling Pond (ft) Comparative Value 10 ug/L Edge of Cooling Pond 50 years 200 years 400 years