HomeMy WebLinkAboutNC0001422_Fig 2-1Water Level December 2015_20160201COOLING POND
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA 29601
PHONE 864-421-9999
www.synterracorp.com
PROJECT MANAGER:
LAYOUT:
DRAWN BY:
PERRY WALDRAP
DATE:
BENJAMIN YOUNG
FIG (LOWER SURFICIAL AQUIFER-DEC)
01/25/2016
P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\20.EG_CAP\CAP Part 2\Figures\DE SUTTON CAP WL MAP.dwg
SMW-06C
NM
SMW-06DSMW-06B
SMW-05C
NMSMW-05B
GRAPHIC SCALE
500
IN FEET
0 500 1000
FIGURE 2-1
POTENTIOMETRIC SURFACE
LOWER SURFICIAL AQUIFER
DECEMBER 3-4, 2015
DUKE ENERGY PROGRESS
WILMINGTON, NORTH CAROLINA
CHECKED BY:BENJAMIN YOUNG
DATE:01/25/2016
SMW-04B
SMW-04C
NM
S. T. WOOTEN CORPORATION
SUTT
O
N
L
A
K
E
R
D
METR
O
CIRC
L
E
F
R
E
D
R
I
C
K
S
O
N
R
D
SMW-01B SMW-01C
13.30
SMW-02B
SMW-02C
13.26
SMW-03B
SMW-03C
NM
AW-01C
NM
AW-01B
AW-02C
NM
AW-02B
AW-02D
MW-12
NM
AW-06B
AW-06D AW-06E
4
5 6
MW-5A MW-5B
MW-5C
10.00
MW-8
NM
MW-9
NM
PZ-10S
PZ-10D
LA-PZ-1
AW-08C
10.52 AW-08B
MW-10
NM
AW-03C
NM
AW-03B
MW-14
ABMW-02D
7.50 ABMW-02S
AW-04B
AW-04C
13.47
ABMW-01S
ABANDONED GWPZ-4B
GWPZ-4A
MW-23E MW-23C
13.30
MW-23B
MW-22C
NMMW-22B
MW-18
MW-21C
NM
MW-16D
6.71
MW-16
LA-PZ-5
MW-19
NM
MW-28T
MW-28C
NM
MW-28B
MW-33C
NM
MW-32C
NM
AW-05D
AW-05E
AW-05B
AW-05C
12.72
AW-09D AW-09B
AW-09C
9.95
NPDES
OUTFALL SW-004
LA-PZ-2
MW-11
NM
MW-34C
MW-35C
MW-35B
MW-34B
GWPZ-1B
GWPZ-2A
GWPZ-2B
MW-36C
10.81
MW-27B
MW-36B GWPZ-1A
MW-27C
10.90
IN
T
E
R
S
T
A
T
E
1
4
0
(
U
S
H
I
G
H
W
A
Y
1
7
)
APPROXIMATE ROUTE OF THE NEW
WILLMINGTON BYPASS (I-140)
R
A
I
L
R
O
A
D
ROYMAC
D
R
NHC-SW
(NOT IN USE)
NHC-SW4
NHC-SW3
NHC-SW1
(ABANDONED)
F
R
E
D
R
I
C
K
S
O
N
R
D
SUTTON STEAM P
L
A
N
T
R
D
MW-37B
MW-4A MW-4
MW-4B
9.49
MW-37C
9.07
NPDES
OUTFALL SW-001
C
A
N
A
L
PE-SW3
PE-SW4
PE-SW5
PE-SW6C
(ABANDONED)
PE-SW6A
PE-SW6B
PE-SW6D
PE-SW6E
MW-20D
NM
MW-20
MW-15
MW-15D
NM
MW-7C
NM
MW-7A
MW-7B
MW-24C
NM
MW-31B
MW-31C
14.18
AW-07D
PZ-INT GWPZ-3A GWPZ-3B
MW-24B
LA-PZ-3
NPDES
OUTFALL SW-002
CAPE FEAR RIVER
FORMER ASH
DISPOSAL AREA
PE-SW2
SOLAR FARM
INVISTA 1
INVISTA 3
INVISTA 2
N
C
H
I
G
H
W
A
Y
4
2
1
R
A
I
L
R
O
A
D
INVISTA 4
INVISTA 5
INVISTA 6
MINE BOUNDARY
R
A
I
L
R
O
A
D
N
C
H
I
G
H
W
A
Y
4
2
1
S
U
T
T
O
N
L
A
K
E
R
D
&22/,1*321':$7(5/(9(/ IW
NC WILDLIFE
LAKE ACCESS
NEW ASH POND AREA - LINED
CA
N
A
L
OLD ASH POND AREA
LA-PZ-4
S. T. WOOTEN CORPORATION
PZ-6D
PZ-6S
R
A
I
L
R
O
A
D
AMW-15S
71.18
LEGEND
BACKGROUND COMPLIANCE WELL
WATER LEVEL IN FEET (msl.)
BGMW-10
73.01
CMW-6R
69.12
DOWNGRADIENT COMPLIANCE WELL
WATER LVEL ELEVATION IN FEET (msl.)
WATER LEVEL CONTOUR IN FEET (msl.)
INFERRED WATER LEVEL CONTOUR (msl.)
DUKE ENERGY PROGRESS
WOOTEN PRODUCTION WELL (APPROXIMATE)
PE-SW2 DUKE ENERGY PROGRESS
PRODUCTION WELL (APPROXIMATE)
NHC-SW4
ASSESSMENT WELL WELL
WATER LEVEL ELEVATION IN FEET (msl.)
CFPUA PRODUCTION WELL (APPROXIMATE)
PARCEL LINE (APPROXIMATE)
6
DMW-1
66.84
MONITORING WELL
WATER LVEL ELEVATION IN FEET (msl.)
500 ft COMPLIANCE BOUNDARY
WASTE BOUNDARY
EDR 3 EDR REPORTED WELL LOCATION (APPROXIMATE)
INVISTA 3 INVISTA PRODUCTION WELL (APPROXIMATE)
SOURCES:
1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014
2.MAY 23, 2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA
GATEWAY AT http://datagateway.nrcs.usda.gov/
3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE
COORDINATE SYSTEM FIPS 3200 HORIZONTAL DATUM (NAD 83) AND VERTICAL DATUM
(NGVD88).
4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT
http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY.
5.NEW WELL LOCATIONS SURVEYED BY McKIM & CREED. HORIZONTAL DATUM IS NAD83
AND THE VERTICAL DATUM IS NGVD88.
6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L.
HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS
TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL
INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg
7. WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE
ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY.
HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29.
8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED
ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE
DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE
NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS
NGV 29.
9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2
PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL
EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA".
10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AS PART OF PREVIOUS
ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE.
COOLING POND
EDR 11
EDR 5
EDR 3
ABMW-01D
ABANDONED
10
13
11
12
13
12
11
1
0
14