Loading...
HomeMy WebLinkAboutNC0001422_Fig 1-2 Site Layout Map_201602010H2 H2 G PE-SW2 PE-SW4 PE-SW3 PE-SW5 PE-SW6A PE-SW6B PE-SW6D PE-SW6E www.synterracorp.com 148 River Street, Suite 220 Greenville, South Carolina 29601 864-421-9999 5/22/2015 5/22/2015P. WALDREP C. NEWELL PROJECT MANAGER: LAYOUT NAME: DRAWN BY: CHECKED BY: KATHY WEBB DATE: DATE: FIGURE 1-2 SITE LAYOUT MAP 1/ 1 6 / 2 0 1 6 2 : 5 1 P M P: \ D u k e E n e r g y P r o g r e s s . 1 0 2 6 \ 1 0 8 . S u t t o n A s h B a s i n G W A s s e s s m e n t P l a n \ 2 0 . E G _ C A P \ C A P P a r t 2 \ F i g u r e s \ S U T T O N - C A P 2 - F I G U R E 1 - 2 . d w g FIGURE 1-2 1200 GRAPHIC SCALE (IN FEET) 0 600300600 L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA NC WILDLIFE LAKE ACCESS SUT T O N L A K E R D CAPE FEAR RIVER SUTTON LAK E R D COOLING POND WATER LEVEL = 9.60 ft PROVIDED BY DUKE ENERGY 06-02-2014 MET R O C I R C L E EZZELL TRUCKING LCH HOLDINGS S. T. WOOTEN CORPORATION N C H I G H W A Y 4 2 1 TRAN S C O M C T BEVE L R D ROYMAC DR NEW HANOVER COUNTY SAUNDERS & SAUNDERS, LLC ROYMAC BUSINESS PARK R O Y M A C P A R T N E R S H I P ABSOLUTE PROPERTIES HURRI C A N E PROPE R T I E S MAOLA MILK & ICE CREAM CO. SOURCES: 1.2014 AERIAL PHOTOGRAPH WAS OBTAINED FROM WSP FLOWN ON APRIL 17, 2014 2.2013 AERIAL PHOTOGRAPH WAS OBTAINED FROM THE NRCS GEOSPATIAL DATA GATEWAY AT http://datagateway.nrcs.usda.gov/ 3.DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83). 4.PARCEL DATA WAS OBTAINED FROM THE NORTH CAROLINA STATE LIBRARIES AT http://www.lib.ncsu.edu/gis/counties.html FOR NEW HANOVER COUNTY. 5.2ft CONTOUR INTERVALS FROM NCDOT LIDAR DATED 2007 https://connect.ncdot.gov/resources/gis/pages/cont-elev_v2.aspx 6.WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A SURVEY BY JAMES L. HAINES & ASSOCIATES FOR ISH, INC. DATED DECEMBER 23, 2008. ISH DRAWING IS TITLED "POTENTIAL LOCATIONS FOR PROPOSED GEOPROBE AND WELL INSTALLATIONS", DATED FEBRUARY 25, 2009 WITH A CAD FILE NAME Figure 22.dwg 7.NEW WELL LOCATIONS AND MEASURING POINTS WERE BASED ON A TABLE BY PARAMOUNTE ENGINEERING, WILMINGTON NC DATED 2012-03-05 SUPPLIED BY PROGRESS ENERGY. HORIZONTAL DATUM IS NAD83(NSRS2007) AND THE VERTICAL DATUM IS NGVD29. 8.THE PROPERTY BOUNDARY FOR THE L.V. SUTTON STEAM ELECTRIC PLANT WAS BASED ON A COMPOSITE MAP PREPARED BY DAVIS-MARTIN-POWELL & ASSOC., INC. THE DRAWINGS ARE DATED JUNE, 1995 WITH REVISION NOTE FOR MARCH 4, 2004. FILE NAME IS L-D-9022-7.DWG. HORIZONTAL DATUM IS NAD83 AND THE VERTICAL DATUM IS NGV 29. 9.THE LOCATION OF THE FORMER ASH DISPOSAL AREAS WAS BASED ON A FIGURE 2-2 PREPARED BY BLASLAND, BOUCK & LEE, INC. THE FIGURE IS TITLED "HORIZONTAL EXTENT OF THE ASH WITHIN THE FORMER DISPOSAL AREA". 10.MONITORING WELLS/PIEZOMETERS/SOIL BORINGS COMPLETED AT PART OF PREVIOUS ASSESSMENT ACTIVITIES. LOCATIONS ARE APPROXIMATE. NOTE: 1.CONTOUR LINES ARE USED FOR REPRESENTATIVE PURPOSES ONLY AND ARE NOT TO BE USED FOR DESIGN OR CONSTRUCTION PURPOSES. DUKE ENERGY PROGRESS PRODUCTION WELL (APPROXIMATE)PE-SW2 NHC-SW4 CFPUA PRODUCTION WELL (APPROXIMATE) 0H2 INVISTA REPORTED PRODUCTION WELL LOCATION DUKE ENERGY PROGRESS PRODUCTION WELL (SURVEYED )PE-SW2 MW-32C ASH/SOIL BORING (AB) AND MONITORING WELL (ABMW) LOCATION (SURVEYED) OLD ASH BASIN AREA NEW ASH BASIN AREA FORMER ASH DISPOSAL AREA CA N A L C A N A L AST CONCRETE PAD RAILROAD SOLAR FARM COOLING POND COOLING POND SUTTON STEA M P L A N T R D TRA N S C O M C T ROYMAC D R F R E D R I C K S O N R D C A N A L ACCESS ROAD NHC-SW4 NHC-SW3 NHC-SW2 (NOT IN USE) IN T E R S T A T E 1 4 0 ( U S H I G H W A Y 1 7 ) F R E D R I C K S O N R D APPROXIMATE ROUTE OF THE NEW WILMINGTON BYPASS (I-140) N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 N C H I G H W A Y 4 2 1 R A I L R O A D R A I L R O A D R A I L R O A D R A I L R O A D NHC-SW1 (ABANDONED) INVISTA CFPUA MW-4B MW-5C MW-33C MW-32C MW-27B MW-27C MW-31B MW-31C MW-24C MW-24B MW-23C MW-23B MW-22CMW-22B MW-19MW-21C MW-28B MW-28C MW-7C MW-11 MW-12 SW-3S MW-5B MW-5A MW-9 MW-8 PZ-1 PZ-A PZ-B PZ-7 PZ-9 PZ-12 PZ-10D PZ-10S PZ-11 MW-10 PZ-14 PZ-16MW-13 PZ-18 PZ-15 PZ-17 PZ-19 PZ-21 MW-34CPZ-2A PZ-2B PZ-1 PZ-1B PZ-3B MW-36C PZ-3A CPT-4 PZ-4BPZ-4A PZ-5A SPT-6 PZ-6A CPT-7A PZ-INTCPT-5 SPT-3A SPT-8 SCPT-5A SPT-6 SPT-2 PZ-23 PZ-22 PZ-24 PZ-26 SPT-4 MW-6B MW-6A MW-6C PZ-20 MW-4 MW-4A PZ-11D GP-5 B-1HA-1-2 HA-1-1 GP-3 GP-6 GP-2 SPT-7 SPT-4 CPT-3 CPT-2 B-1HA-2-1 HA-2-2 SPT-1 B-3 HA-3-1 HA-3-2 GP-1 PZ-1971 SPT-3 CPT-8 SCPT-1 GP-4 MW-18 MW-17 PZ-30 MW-14 MW-13 MW-13D MW-16 MW-16D MW-3A MW-3BMW-2A MW-2B MW-2C SB-2MW-7B MW-7A MW-15 MW-15D MW-20 MW-20D EXISTING MONITORING WELLS / PIEZOMETERS / SOIL BORINGS (SURVEYED)MW-5B LEGEND BACKGROUND MONITORING WELL (SURVEYED) COMPLIANCE MONITORING WELL (SURVEYED)MW-12 MW-4B MONITORING WELL (SURVEYED) MONITORING WELL LOCATION (SURVEYED) WATER LEVEL PIEZOMETER NPDES OUTFALL 003 NPDES OUTFALL SW-2 WATER QUALITY AND SEDIMENT LOCATION PZ-12 SW-8A PZ-9A NPDES OUTFALL SW-004 SW-CFP SW-1C SW-6A NPDES OUTFALL SW-002 NPDES OUTFALL SW-001 SW-CF001 COOLING POND SW-6A SW-CFUP CAPE F E A R R I V E R INSET A UPSTREAM SAMPLE LOCATION ON THE CAPE FEAR RIVER 1200 GRAPHIC SCALE (IN FEET) 0 600300600 SEE INSET A (THIS FIGURE) FOR UPSTREAM SAMPLE LOCATION ON THE CAPE FEAR RIVER SW-004 MW-28T MINE BOUNDARY CUB-1 CONFINING UNIT ASSESSMENT BORING CUB-1 CUB-2 CUB-3 CUB-4 MW-23E CUB-5 CUB-6 CUB-7 CUB-8 SEE INSET B (THIS FIGURE) FOR MORE CUB SAMPLE LOCATIONS. INSET B CUB SAMPLE LOCATIONS 1200 GRAPHIC SCALE (IN FEET) 0 600300600 CUB-10 CUB-9 CUB-11 CUB-12 CUB-8 PZ-3A PZ-3B MW-34B MW-35C MW-35B MW-36B PZ-1B PZ-1A PZ-4A PZ-4B 500 ft COMPLIANCE BOUNDARY DUKE ENERGY PROGRESS SUTTON PLANT WASTE BOUNDARY CONTOUR MAJOR20 1/2 MILE OFFSET FROM COMPLIANCE BOUNDARY PZ-6S PZ-6D 1500 ft OFFSET FOR UNDERGROUND UTILITY INFORMATION ASH/SOIL BORING (AB) AND MONITORING WELL (ABMW) - CLOSED PROPOSED MONITORING WELL LOCATION