Loading...
HomeMy WebLinkAboutNC0001422_Fig 1-1 Site Location Map_20160201P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON FIG 1-1 (SITE LOCATION MAP).dwg PROJECT MANAGER: LAYOUT: DRAWN BY: KATHY WEBB DATE:J. CHASTAIN FIG 1 (USGS SITE LOCATION) 2014-12-15 CONTOUR INTERVAL: MAP DATE: 10ft 2013 APPROXIMATE ROUTE OF THE NEW WILLMINGTON BYPASS (I-140) 148 RIVER STREET, SUITE 220 GREENVILLE, SOUTH CAROLINA PHONE 864-421-9999 www.synterracorp.com FIGURE 1-1 SITE LOCATION MAP L.V. SUTTON ENERGY COMPLEX 801 SUTTON STEAM PLANT RD WILMINGTON, NORTH CAROLINA LELAND AND CASTLE HAYNE NC QUADRANGLES RALEIGH WILMINGTON GREENVILLE GREENSBORO 3000 GRAPHIC SCALE 1500 IN FEET 15000 U S H I G H W A Y 4 2 1 PROPERTY BOUNDARY 500' COMPLIANCE BOUNDARY WASTE BOUNDARY L.V. SUTTON ENERGY COMPLEX NEW HANOVER COUNTY SOURCE: USGS TOPOGRAPHIC MAP OBTAINED FROM THE USGS STORE AT http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do L.V. SUTTON ENERGY COMPLEX