HomeMy WebLinkAboutNC0001422_Fig 1-1 Site Location Map_20160201P:\Duke Energy Progress.1026\108. Sutton Ash Basin GW Assessment Plan\1.11 CSA Reporting\FIGURES\DE SUTTON FIG 1-1 (SITE LOCATION MAP).dwg
PROJECT MANAGER:
LAYOUT:
DRAWN BY:
KATHY WEBB
DATE:J. CHASTAIN
FIG 1 (USGS SITE LOCATION)
2014-12-15
CONTOUR INTERVAL:
MAP DATE:
10ft
2013
APPROXIMATE ROUTE OF THE
NEW WILLMINGTON BYPASS (I-140)
148 RIVER STREET, SUITE 220
GREENVILLE, SOUTH CAROLINA
PHONE 864-421-9999
www.synterracorp.com
FIGURE 1-1
SITE LOCATION MAP
L.V. SUTTON ENERGY COMPLEX
801 SUTTON STEAM PLANT RD
WILMINGTON, NORTH CAROLINA
LELAND AND CASTLE HAYNE NC QUADRANGLES
RALEIGH
WILMINGTON
GREENVILLE
GREENSBORO
3000
GRAPHIC SCALE
1500
IN FEET
15000
U
S
H
I
G
H
W
A
Y
4
2
1
PROPERTY BOUNDARY
500' COMPLIANCE BOUNDARY
WASTE BOUNDARY
L.V. SUTTON ENERGY COMPLEX
NEW HANOVER COUNTY
SOURCE:
USGS TOPOGRAPHIC MAP OBTAINED FROM THE USGS STORE AT
http://store.usgs.gov/b2c_usgs/b2c/start/%%%28xcm=r3standardpitrex_prd%%%29/.do
L.V. SUTTON
ENERGY COMPLEX